Detailed Survey & Investigation, Planning & Design, Supplying All Materials, Labours, Equipment & Machineries, Construction, Execution & Installation, Testing, Commissioning Along With Successful Trial Run Period Of 3 Months And Comprehensive Operation And Maintenance For 36 Months After Successful Trial Run Of Providing Intensive Irrigation Facilities Solar Energy Based Pressurized Pipe Scheme For Distribution Of Available Surface Water In Dorwan Distributory Onturn-Key Basis.-1 Preliminaries: Conducting preliminary investigation, detailed investigation, preparation of designs for Solar energy based pressurized pipe scheme for distribution of available surface water in Dorwan distributory and other allied works components, calculation of quantities and preparation of detailed project report including printing, binding and etc. 01 job LS 10.00 Ten Lakh 2 Supply, transport, installation and commissioning of MNRE marked Solar Module having Min. efficiency of 15% and fill factor greater than 70% with power output of Min. 500 Wp and sufficient nos. of transformer and required electric communication for each pump house Module supplied with the SPV system having warranty for output wattage, not less than 90% at the end of 10 years and 80% at the end of 25 years, with necessary certificates. Connection of SPV Systems to Grid and power purchasing Agreement (MoU) including Carbon Credits with Concerned Department for the Same on Behalf of E.E., Sone Canal Division, khagaul. Transport and Installation of proper modified structure (weight > 235 kg) as per drawing and specification, having protection with 80 microne galvanisation with net metering. IP54 protected enclosure Inverted Unit qualifying IEC 61683- Efficiency measurement and IEC60068-2 Environment standard, safety standard suitable for 3 phase A.C motor, IGBT based high voltage switching inverter with MPPT technology, UV rated Copper Cable laid inside GDPE conduit and other accessories, Proper earthing system, Lighting system for scheme area with 5 years warranty from the date of installation (lighting pole of 4 m height above ground level) Supply and installation of 3 phase pump-motor set ( 4 Nos. with total head 42.0 m to deliver 55 lps @ 65 Hp motor and 2 Nos. with total head 37.0 m to deliver 25 lps @ 25 Hp motor), GSM/GPRS based data transmitter/ modem to provide remote monitoring service, Construction of 03 Nos of pump house, all works completed as per design, drawing, as per site conditions and as specification approved by Engineer-in-charge and as per relevant BIS code. 01 job LS 248.24 Two crore forty eight lakh twenty four thousand 3 Design, Supply, Erection and Commissioning of 28 Nos. of Outlet Management System (OMS) at 2 Ha. The system enable to equitable distribution of Water irrespective of its location and distance from the Outlet Management Systems (OMS). OMS shall be enabled to record, monitoring and control of the flow Delivered, without use of any external Electric Energy and shall work through GSM/GPRS/RADIO etc. The System should be capable to change/configure the Pressure/Flow Setting from Remote as and when required without going to site location, Protection Box / Room for OMS as per design, drawing and specification approved by Engineer-in-charge and as per relevant BIS code. 1 job LS 200.22 Two crore twenty two thousand 4 Operation and Maintenance of Electro-Mechanical (EM) & Hydro-Mechanical (HM) parts, Pressure mains, Pump houses including all permanent civil works, desiltation of existing pond etc for 36 months after successful completion of Trial Run Period of 3 months i.e Kharif/Rabi season as per relevant codes, approved Design & Drawing Standard Specification and direction of Engineer in Charge. 01 job L.S. 22.50 Twenty Two lakh Fifty thousand. (a) 1st year (b) 2nd year (c) 3rd year 5 Desilting of the existing Channel exit from 4.50 km of Dorwa distributory and existing Aahr, Payne and Pond (Approx. 22500 cubic metre) near Kalyanpur Village, Construction of SLR bridge, 20 nos of Soak pit with capacity 6 m3 20 nos of Soak pit with capacity 6 m3 and sufficient no. of outlet near Kalyanpur village, Protection work at suitable location of existing ponds, Aahar and Payne Construction of 7 no.sluice gate with automatic operation with the help of 3 kv solar system with battery storage as per relevant BIS Code and approved design, drawing, specification by Engg-in-charge. 1 job L.S. 190.88 One crore Ninety lakh eighty eight thousand Variable item(In anticipation of changes in design parameters) 6 Providing, laying, jointing and testing including excavation and back filling etc. for Oriented Poly vinyl chloride Pipes or O-PVC Pipes of highest Orientation Class 500 IS 16647 2017 with homogeneous socket during orientation process, including supply of Elastomeric sealing ring manufactured as per ISO 16422-2014 and the elastomeric sealing ring gasket conforming to EN 681-1. The manufacturing, testing at factory, Providing, transpotation, handling, stacking, installation, jointing and testing at sites shall comply with all aplicable standards (ISO 16422-2014) etc. complete. PVC-O pipe Class 500 PN-16 & elastromeric fittings, filteration system along with Valves and all necesary appurtenances to provide irrigation facilities in 227 Ha of land, along with each outlet @ 2 Ha chak with a pressure of providing 13 to 15 m head and duty of 0.85 Ha/lps .All works completed as per relevant BIS Code and approved design, drawing, specification by Engg-in-charge. Area upto approx 250 Ha Ha 549.84 Five crore forty nine lakh eighty four lakh 315 mm dia (Length 932.00 m) 250 mm dia (Length 574.00 m) 200 mm dia (Length 38.00 m) 160 mm dia (Length 7974.00 m) 110 mm dia (Length 10901.00 m)