| 1 | Survey Work |
| 2 | Dirilling work Cartage of Rig Machine |
| 3 | Drilling work with Rig machine upto 14\"\" dia R.R.Bit including Reamming and 225x250 mm dia Assembly Lowering. |
| 4 | Materails 225mm dia P.V.C CM casing |
| 5 | G.I Column Pipe 100mm |
| 6 | Boring cap |
| 7 | Electric Cable 10mm |
| 8 | Towing (rassa) 18mm |
| 9 | Elbow Band 100mm |
| 10 | Adaptor 3 /4 inch |
| 11 | Solvent |
| 12 | Socket |
| 13 | Clump |
| 14 | P.V.C Pipe jali |
| 15 | End cap |
| 16 | Pea gravel 2 to 4mm dia. |
| 17 | Sluice Valve |
| 18 | Supply and fixing flench nut bolt fitting etc |
| 19 | 15 H.P ISI Mark Submersible Pump. |
| 20 | Oil Immerse Starter |
| 21 | Panel Board |
| 22 | Earthwork in excavation in S.soil for pump house foundation(As per S.l no.2,sch 252 of SOR) |
| 23 | Providing and laying in cement concrete 1:4:8 ( 1cement : 4 fine sand : 8 graded brickaggregate 40mm nominal size ) andcuring comlete, including cost of formwork in foundation.(As per S.l no.3,sch 275 of SOR) |
| 24 | M-15 Brick massonay (1:6) cement and fine sand mortar I/c all .(As per S.l no.1,sch 303 of SOR) |
| 25 | providingand laying D.P.C 2.50 cm thick with cement concrete consisting of one part cement 1.5 part of course sand and three part of approved 10 mm graded stone grit and including water proofing martreail as apporved by the engineer -in- charge in the proportion as specified by manufacturer .(As per S.I no - 2 sch361 of SOR ) |
| 26 | First class Brick Work in 1:4 cement and fine sand of 1.25 finesand modulous mortarin foundationand plinth includingsupply of allmaterials, labour , tools andplantsetc. required for proper completion of the work.(As per S.l no.1, 303 sch of SOR) |
| 27 | Providing and laying in cement concrete 1:4:8 ( 1cement : 4 fine sand : 8 graded brickaggregate 40mm nominal size ) andcuring comlete, including cost of formwork in foundation.(As per S.l no.3,sch 275 of SOR) |
| 28 | First class Brick Work in 1:4 cement and fine sand of 1.25 finesand modulous mortarin foundationand plinth includingsupply of allmaterials, labour , tools andplantsetc. required for proper completion of the work.(As per S.l no.1, 303 sch of SOR) |
| 29 | providingand laying D.P.C 2.50 cm thick with cement concrete consisting of one part cement 1.5 part of course sand and three part of approved 10 mm graded stone grit and including water proofing martreail as apporved by the engineer -in- charge in the proportion as specified by manufacturer .(As per S.I no - 2 sch361 of SOR ) |
| 30 | R.C.C.Beam in 1:2:4 in cement coarse sand and 40 mm gauge grit stone ballast prepared subgrade complete in all.As per S.l no 10 sch 285 |
| 31 | Providing and laying in cement concrete 1:4:8 ( 1cement : 4 fine sand : 8 graded brickaggregate 40mm nominal size ) andcuring comlete, including cost of formwork in foundation.(As per S.l no.3,sch 275 of SOR) |
| 32 | R.C.C.Beam in 1:2:4 in cement coarse sand and 40 mm gauge grit stone ballast prepared subgrade complete in all.As per S.l no 10 sch 285 |
| 33 | M.S. work (use Fe 500Bars) and Lintel MS @0.617kg/m 10mm dia. |
| 34 | R.C.C. work for slabwith cement approved coarse sand and 2cm (3/4\")gauge approved stone ballast in the proportion 1:2:4 in lintel of doors and windows excluding supply of reinforcement and its bending the same with 24 B WG binding wire and necessary centering and shuttering etc, and also including supply of all materials labour and tools and plants etc required for proper completion of works.(As per S.I no 10 SOR 284 ) |
| 35 | Door & window M.S work |
| 36 | Column Brick Work in 1:4 cement and fine sand of 1.25 finesand modulous mortarin foundationand plinth includingsupply of allmaterials, labour , tools andplantsetc. required for proper completion of the work.(As per S.l no.1, 303 sch of SOR) |
| 37 | R.C.C.Beam in 1:2:4 in cement coarse sand and 40 mm gauge grit stone ballast prepared subgrade complete in all.As per S.l no 10 sch 285 |
| 38 | M.S Work in beam long 12mm dia @0.888kg/m 3Nos main. |
| 39 | 12mm thick cement Plaster with cement mortar in proportion of 1:4cement and corse sand in single coat on fair side of single or half brick wall for interior plastering including arises, interior rounded angles chamfers and of rounded angles not exceeding 80 mm in grit and finished even and smooth.(As per S.l no.2,sch 13.4 of SOR ) |
| 40 | In Pump House Flooring P.C.C (1:4:8) cement , sand , 10-20mm G.S.B. |
| 41 | Finishing wall with water proof cement paint of approved make and quality on new work with one coats at give an even shade including supply of all materials, labour , tools and plants etc required for proper completion of work. (S.l no 23 sch 660)SOR |
| 42 | P.C.C (1:4:8) cement , sand , 20-40mm Brick Ballast for foundation. |
| 43 | M-15 Brick Massonay work in stair (1:6) cement mortar I/c in all work. |
| 44 | 12mm thick cement Plaster with cement mortar in proportion of 1:4cement and coarse sand in single coat on fair side of single or half brick wall for interior plastering including arises, interior rounded angles chamfers and of rounded angles not exceeding 80 mm in grit and finished even and smooth.(As per S.l no.2,sch 13.4 of SOR) |
| 45 | Earthwork in excavation in S.soil for pump house foundation (As per S.l no.2,sch 252 of SOR) |
| 46 | Providing laying and fixing G.I Pipe 100mm dia with flench nut & bolt including refilling and testing of joint complete for water supply line. |