Tender For Strengthening The Road From Vembi Periya Eri Salai Km 0/0 - 1/050 In Vikkiravandi Block., viluppuram-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Strengthening The Road From Vembi Periya Eri Salai Km 0/0 - 1/050 In Vikkiravandi Block.. Submission Date for this Tender is 03-09-2025. Road Work Tenders in viluppuram Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

50717297
Tender For Strengthening The Road From Vembi Periya Eri Salai Km 0/0 - 1/050 In Vikkiravandi Block.
Tender
Indian
Tamil Nadu
Viluppuram
03-09-2025

Tender Details

Tender For Strengthening The Road From Vembi Periya Eri Salai Km 0/0 - 1/050 In Vikkiravandi Block.; 1 Strengthening the road from Vembi Periya Eri Salai Km 0/0 - 1/050 in Vikkiravandi Block 2 Clearing the scrub jungles including all labour charges for all labour charges etc complete. 3 in Km. 0/0 - 1/050 4 Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br 5 in Km. 0/0 - 1/050 6 Picking the existing damaged BT surface to 3 - 5cm deep including all labour charges 7 in Km. 0/0 - 1/050 8 LayingUS GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravelas per standard specification etc. complete. 9 in Km. 0/0 - 1/050 10 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. 11 in Km. 0/0 - 1/050 12 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 13 in Km. 0/0 - 1/050 14 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all 15 in Km. 0/0 - 1/050 16 BITUMINOUS CONCRETE 40 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 17 in Km. 0/0 - 1/050 18 Provision of 15 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint. 19 in Km. 0/0 - 1/050 20 Construction of 2.00m Span RCC slab culvert @ Ch 670m 21 Earth work excavation for foundation in all classes of soils except hard rock requiring blastingwith initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth 22 Ch-670 m 23 Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jellyincluding labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc 24 Ch-670 m 25 Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.( For Foundation) 26 Ch-670 m 27 Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.(For Superstructure) 28 Ch-670 m 29 Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.(For BED BLOCK) 30 Ch-670 m 31 Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. 32 Ch-670 m 33 Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete. 34 Ch-670 m 35 Ch-670 m 36 Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete. 37 Ch-670 m 38 Providing and Fixing 20mm Bitumen felt for expansion joint between Dirt wall & Deck Slab 39 Ch-670 m 40 Providing and Fixing Tar Paper for bearing between Bed block & Deck Slab 41 Ch-670 m 42 Supplyand fixing PVC Pipes for weep holes 43 Ch-670 m 44 Collection and Supply of Well Gravel from approved Quarry including cost and Conveyance of all materials. 45 Ch-670 m 46 Construction of 1.50m Span RCC slab culvert @ Ch 450m 47 Earth work excavation for foundation in all classes of soils except hard rock requiring blastingwith initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth 48 Ch-450 m 49 Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jellyincluding labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc 50 Ch-450 m 51 Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.( For Foundation) 52 Ch-450 m 53 Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.(For Superstructure) 54 Ch-450 m 55 Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.(For BED BLOCK) 56 Ch-450 m 57 Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. 58 Ch-450 m 59 Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete. 60 Ch-450 m 61 Ch-450 m 62 Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete. 63 Ch-450 m 64 Providing and Fixing 20mm Bitumen felt for expansion joint between Dirt wall & Deck Slab 65 Ch-450 m 66 Providing and Fixing Tar Paper for bearing between Bed block & Deck Slab 67 Ch-450 m 68 Supplyand fixing PVC Pipes for weep holes 69 Ch-450 m 70 Collection and Supply of l Gravel from approved Quarry including cost and Conveyance of all materials. 71 Ch-450 m 72 Construction of 1.50m Span RCC slab culvert @ Ch 1000m 73 Earth work excavation for foundation in all classes of soils except hard rock requiring blastingwith initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth 74 Ch-1000 m 75 Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jellyincluding labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc 76 Ch-1000 m 77 Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.( For Foundation) 78 Ch-1000 m 79 Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.(For Superstructure) 80 Ch-1000 m 81 Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.(For BED BLOCK) 82 Ch-1000 m 83 Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete. 84 Ch-1000 m 85 Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete. 86 Ch-1000 m 87 Ch-1000 m 88 Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete. 89 Ch-1000 m 90 Providing and Fixing 20mm Bitumen felt for expansion joint between Dirt wall & Deck Slab 91 Ch-1000 m 92 Providing and Fixing Tar Paper for bearing between Bed block & Deck Slab 93 Ch-1000 m 94 Supplyand fixing PVC Pipes for weep holes 95 Ch-1000 m 96 Collection and Supply of l Gravel from approved Quarry including cost and Conveyance of all materials. 97 Ch-1000 m 98 Provision forKM Stone 99 Provision for HM stone 100 Provision for 60cm Equilateral Triangular sign board charges 101 Provision forCitizen cum Name Board charges 102 Provision for photographic charges

Key Value

Document Fees
Refer document
Tender Value
INR 70.76 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail