Grey Water Management Project at Chakkarakkal Taxi Stand Anjarakkandy GP NOWA WITH DEWATS-2 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil 3 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteringAll work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 4 5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars piers,abutments, posts and struts etc. up tot floor five level excluding cost of centering,shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 5 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo Mechanically Treated bars of grade Fe-500D or more 6 5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 7 100.1.2 Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. 8 100.98.218 Supply of PVC Pipe, 8kg/cm2, 32mm Dia. 9 100.98.219 Supply of PVC Pipe, 8kg/cm2, 40mm Dia. 10 100.98.229 Supply of PVC Pipe, 10kg/cm2, 20mm Dia. 11 100.98.222 Supply of PVC Pipe, 8kg/cm2, 75mm Dia. 12 100.98.234 Supply of PVC Pipe, 10kg/cm2, 63mm Dia. 13 100.98.223 Supply of PVC Pipe, 8kg/cm2, 90mm Dia. 14 100.55.1 Supplying of 2 to 6 mm and 6 to 12 mm size fine pebble (pebbles shall be hard, clean,free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking,spreading,testing and as per the directions of the department officers etc. complete as per CPHEEO specifications. 15 100.9.1 Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 20 mm nominal outside diameter pipes. 16 100.9.3 Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 32 mm nominal outside diameter pipes. 17 100.9.4Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 40 mm nominal outside diameter pipes. 18 100.9.6 Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes. 19 100.9.7 Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. 20 100.9.8 Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. 21 100.55.2 Supplying of 12 to 20mm size pebble (pebbles shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc complete and as per CPHEEO specification. 22 100.50.1.1 : Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete. 23 13.37.1 White washing with lime to give an even shade:New work (three or more coats) 24 13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) 25 13.62.1 Painting with synthetic enamel paint of approved brand and manufacture of required colour to givean even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture . 26 11.21.2.1 Providing and fixing 10 mm thick acid and /or alkali resistant tiles of approved make and colour using acid and / or alkali resisting mortar bedding, and joints filled with acid and /or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in-Charge. In dado/ skirting on 12 mm thick mortar 1:4 (1 acid proof cement : 4 coarse sand)Acid and alkali resistant tile 27 10.25.2 Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 28 100.60.23.4.2 Providing 15mm PVC Tap in the water meter assembly for 20mm ( 3/4 inch ) water connection, using 25mm ( 3/4 inch ) Indian Standard Class 6 uPVC pipes, uPVC specials and PP PN 16 Compression specials including cost of consumables, hire charges for tools and labour charges etc. complete, but excluding cost of materials and as per the direction of departmental officers. 29 OD83143/2024-2025 supply and erecting ope well submersible pumpsett 1HP 30 OD83148/2024-2025 Supply and fixing liquid chlorination for final collection tank 31 OD83145/2024-2025 Supply and erecting difuser for final collection tank 32 OD83142/2024-2025 supply and fixing cana plant for HPGF 33 OD83146/2024-2025 water quality test (grey water) 34 OD83147/2024-2025 supply and fixing name board 35 OD83144/2024-2025 supply and fixing CI manhole cover for DEWATS 36 50.18.9.21.10 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75x63 mm dia Reducer 37 50.18.9.21.4 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Bend 38 50.18.9.21.5 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75x75x75 mm dia Tee 39 Supply and Erecting NOWA technology 40 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil 41 2.7.1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock 42 50.6.7.1 Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials,labour charges etc. 43 13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) 44 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. 45 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 46 12.1.3 Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.63 mm thick with zinc coating not less than 275 gm/m2 47 10.25.2 Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 48 13.37.1 White washing with lime to give an even shade:New work (three or more coats) 49 13.62.1 Painting with synthetic enamel paint of approved brand and manufacture of required colour to givean even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture . 50 OD83165/2024-2025 Name Board 51 OD84616/2024-2025 Supply Erecetion and Commissioning of NOWA Water Treatment System 52 Soakpit 53 2.7.1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock 54 5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 55 5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform 56 5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 57 5.22.1 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars 58 13.37.1 White washing with lime to give an even shade:New work (three or more coats) 59 13.60.1 Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work 60 16.3.2 Supplying and stacking at site.63 mm to 45 mm size stone aggregate 61 16.3.3 Supplying and stacking at site.53 mm to 22.4 mm size stone aggregate