| 1 | OPEN WELL CONSTRUCTION |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | OD31072/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for 1.50m -3.0m(extra for every additional lift of 1.5m or apart therof in excation/banking excavated or stacked materials)(2.6.1+2.26.1) |
| 4 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 5 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 6 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III)derived from natural sourcesderived from natural sources: 3 graded stone aggregate 20 mm nominal sizederived from natural sourcesderived from natural sources) |
| 7 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 8 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) |
| 9 | 13.23.1:Extra for plastering on circular work not exceeding 6 m in radius.In one coat |
| 10 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 11 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 12 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 13 | OD31075/2025-2026:Providing and fixing G.I. pipes for hanging pulley for the well |
| 14 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 15 | OD47049/2025-2026:Supplying and fixing Name board as directed by dept officers |