Construction Of Compound Wall, Supplying And Filling Of Well Gravel And Providing Cement Concret Pavement In Front Of New Anganvadi Building At Mariamman Kovil Street In Ward No.19 , Earth Work Excavation For Foundation By Manual Means For Isolated, Combined And Other Type Foundations In All Soils And Sub-Soils And To Full Depth As May Be Directed Except In Rock Requiring Blasting Inclusive Of Shoring Shuttering, Bailing Out Water Wherever Necessary And Depositing The Surplus Earth Within The Compound In Places Shown By The Departmental Of?Cers With An Initial Lead Of 10 Mts And Initial Lift Of 2.00Mts. And Clearing And Levelling The Site, Etc., Complete Complying With Standard Speci?Cation And As Directed By The Departmental Of?Cers.. , Earth Work Open Excavation By Manual Means In All Soils And Sub-Soils And To Full Depth As May Be Directed Except In Rock Requiring Blasting Inclusive Of Shoring Shuttering, Bailing Out Water Wherever Necessary And Depositing The Excavated Earth With A Lead Of 10 Mts. Within The Compound In Places Shown By The Departmental Of?Cers And Clearing And Levelling The Site, Etc., Complete Complying With Standard Speci?Cation And As Direct-Ed By The Departmental Of?Cers. , Supplying And ?Lling In Foundation, Basement, Etc With ?Lling Crushed Stone Sand In Layers Of Not More Than 15 Cm Thick Well Watered, Rammed And Consolidated Etc. Complete Complying With Standard Speci?Cation And As Directed By The Departmental Of?Cers. , Supply And ?Lling In Foundation And Basement With Gravel In Layers Of Not More Than 15Cm.Thick Well Rammed Watered And Compacted With Surface Vibrator, Watered And Consolidated Etc. Complete Complying With Standard Speci?Cation And As Directed By The Departmental Of?Cers. , Cement Concrete 1:5:10 (One Cement, Five Crushed Stone Sand And Ten Hard Broken Stone Jelly) Using 40 Mm Gauge Hard Broken Granite Stone Jelly For Foundation Including Dewatering Wherever Necessary And Laid In Layers Of Not More Than 15 Cm Thick Well Rammed, Consolidated And Including Curing Etc. Complete Complying With Standard Speci?Cation And As Directed By The Departmental Of?Cers. -Mixing By Manual Means , Supplying And Erecting Steel Centering Including Necessary Supports For Plane Surfaces For Reinforced Cement Concrete Works Such As Column Footings, Column Pedestals, Plinth Beams, Grade Beams, Staircase Steps, Sill Slabs Etc. Which Require Onlynominal Strutting Using Mild Steel Sheets Of Size 90Cm X 60Cm And 10 Bg Stiffened With Welded Mild Steel Angles Of Size 25Mm X 25Mm X 3 Mm For Boarding, Laid With Silver Oak Joists Of Size 10Cm X 5Cm & 7.5Cm X 5Cm As Support Runner , Vertical Stiffener,Side Support And Top Horizontal Stiffener Spaced At About 60Cm To 90Cm Centre To Centre Or At Suitable Intervals Etc. Complete In All ?Oors Complying With Standard Specifcation. (Payment For Centering Shall Be Given After The Concrete Is Laid). , Supplying And Erecting Steelcentering Including Necessary Supportsfor Plane Surfaces Such As Rectangular Or Square Rcc Columns Etc. Which Require Only Nominal Strutting Using Mild Steel Sheets Made Of 10 Gauge Thick Welded With Ms Angle Size 40Mm X 40Mm X 5 Mm And Supported By Steel Adjustable Telescopic Props Of Size 2M X 2M (Expandable Upto 3.60M) Made With Outer Steel Pipe With Dia 50Mm (3.60Mm Thick) And Inner Steel Pipe With Dia 40Mm (2.90Mm Thick).Etc..Complete In All ?Oors Complying With Standard Specifcation. Steel Adjustable Telescopic Props Shall Berovidedas Directed By The Departmental Of?Cers. (Payment For Centering Shall Be Given After Theconcrete Is Laid). , Providing And Laying In Position, Standardised Concrete Mix M-20 Grade By Insitu Machine Mix Concrete Adopting Weighing Batch Method In Accordance With Is 456 Using 20Mm And Down Graded Hard Broken Granite Stone Jelly For All Rcc Items Of Works With Minimum Cement Content Of 325 Kg/M3 And Maximum Water Cement Ratio Of 0.55, Including Admixture (Plasticiser / Super Plasticiser) In Recommended Proportions As Per Is:9103 To Accelerate, Retard Setting Of Concrete, Improve Workability Without Inspiring Strength And Durability With About (5 Cu.M) 7730 Kg. Of 20Mm Machine Crushed Stone Jelly And With About (3.3 Cu.M) 5156 Kg. Of 10-12Mm Machine Crushed Stone Jelly And With About (4.79 Cu.M) 7670 Kg. Of Crushed Stone Sand, But Excluding Cost Ofreinforcement Grill And Fabricating Charges, Centering And Shuttering And Also Including Laying,Vibrating With Mechanical Vibrators, ?Nishing, Curing, Etc. And Providing ?Xtures Like Fan Clamps In The Rcc ?Oor/ Roof Slabs Wherever Necessary Without Claiming Extra, Etc.,Complete Complying With Standard Speci?Cation And As Directed By The Departmental Of?Cers. The Coarse And ?Ne Aggregates To Be Used Should Comply With The Requirements Of Is Standards. (No Separate Payment Will Be Made By The Department For The Excess Usage Of Materials). , Supplying, Fabricating And Placing In Position Mild Steel / Ribbed Tor Steel Reinforcement Grills Of All Variety Like Hysd/Ctd/Tmtand All Grade Like Fe 500,Fe550d, Fe 500 D Etc., For All Rcc Works As Per Design Given Including Cost Of Steel Reinforcement And G.I. Binding Wire, Wastage Etc. Complete Complying With Standard Speci?Cation And As Directed By The Departmental Of?Cers.(Contractor Has To Make His Own Arrangements For The Supply Of Steel Reinforcement And Binding Wire) , Plain Cement Concrete 1:2:4 (One Cement, Two Crushed Stone Sand And Four Hard Broken Stone Jelly) Using 20Mm Jelly For Wearing Coat Including Laying, Compacting, ?Nishing And Curing, Etc., Complete As Per Standard Speci?Catins And As Directed By The Departmental Of?Cers.-Mixing By Mechanical Means , Brick Work In Following Cement Mortar Using Best Quality Burnt Clay Brick Of Size 9” X 4 3/8” X 2 3/4” With Class Designation Of 7.5 Conforming To Is 1077-1992 For Foundation And Basement Including Cost Of Mortar Plasticizer Curing, Etc.,Completecomplying With Standard Speci?Cation And As Directed By The Departmental Of?Cers. Brickwork Shall Be Done As Per Is 2212-1991 Adopting English Bond Generally.Other Type Of Bond Shall Be Done As Directed By The Executive Engineer In Charge. , Plastering With Cement Mortar 1:5 (One Cement And Five Plastering Sand),12Mmthick In All ?Oors Including Mortar Plasticizer At 200Ml Per 50Kg Of Cement Used, Curingetc. Complete Complying With Standard Speci?Cation And As Directed By The Departmentalof?Cers. , Painting The Walls With Two Coats Of Cement Paint Over One Coat Of Cement Primer As Instructed By The Departmental Of?Cers Including Preparation Of Surface Curing,Etc., Complete In All ?Oors Complying With Standard Speci?Cations And As Directed By The Departmental Of?Cers. (The Colour And Shade Of The Cement Paint Shall Be Gotapproved By The Executive Engineer Before Use Of Work). , Supply And Delivery And Fixing Of Hdpe Tank As Per Is 12701 / 1996 Including Loading, Unloading, Transportation And Labour Charges For Fixing Of The Gi Pipes And Specials For Pipe Connection Worksncluding Cutting, Threading And Fixing Charges Etc.,500 Litres Twad Sor 2024-25 (Wd-M1417) , Painting New Iron Works Such As Steel Doors, Windows, Ventilators, Window Bars,Balustrades Etc., With Two Coats Of Best Approved ?Rst Quality And Colour Of Synthetic Enamel Paint Over The Existing Red Oxide Priming Coat In All ?Oors Excluding Cost Ofpriming Coat Etc., Complete Complying With Standard Speci?Cation And As Directed By Thedepartmental Of?Cers. (The Make, Quality And Colour Of Paint Should Be Got Approved Bythe Executive Engineer Before Use On Works.) , Manufacturing, Supplying And Fixing Of Stainless Steel Hand Rails For Staircase Using 50Mm Dia 304L Grade Stainless Steel Pipe Of 1.60Mm Thick At Required Locations To A Height Of 900Mm From Finished Floor Level Welded To 38Mm Dia Stainless Steel Pipe Post Of 1.00Mm Thick As Vertical At 900Mm Centre With 2 Nos. Of 25Mm Dia Intermediate Horizontal Stainless Steel Pipe Of 1.60Mm Thick In Between. The Vertical Pipe Has To Be Welded To The 100 X 100 X 6Mm Ms Base Plate Encased In The Base Concrete. The Rate Is Inclusive Of The Charges For Cutting, Bending, Welding, Grinding, Polishing, Conveyance, Electrical Charges, Etc. Complete , Supply And Delivery Of Rcc Ring Well 0.9M M Dia Usingrcc M 30Mm Using 20Mm &10Mm Hbg Stone Excludingcost Of Reiforcement But Including Cost Of Curing Etc (Lr) , Gst. 18%(Cgst-9%,Sgst-9%)