1)Dcw est forshifting of LT line by providing 1 no 8mtr PSC pole with Three phase side arm as per the request of Thiru.V.Murugan, Valkulam Colony SS/63KVA under Marthandam section, 2)Permanent dismanltling of 1 no 8mtr PSC pole and LT line as per the request of Thiru.C.Thasaian Kulakachi at loc no F2/4 in Thasaiah Nursing College SS under MTM Section, 3)Dcw estimate for shifting of 1 no HT/LT Rail pole by providing 1 no 9mtr PSC pole with HT/LT side arm as per the request of Thiru.A.R.Albert Ammanvilai Chankai atloc No FI-12 in Chankai SS I under MTM Section, 4)Dcw estimate for shifting of LT line by providing 1 no 8 mtr PSC pole as per the request of Thiru.R.Aswin Vellivilagam in Kalluthotti of MTM Section, 5)Estimate for 1 no 8mtr PSC pole damaged to dashing of vehicle no TN75AH1159 damaged by Thiru.S.Vijayan Vellamcode Chitharal Chnakai SS V of Marthandam section, 6)Dcw estimate for shifting of LT line by providing one number 8 mtr PSC pole with Three phase side arm, as per the request if Thiru.T.Rajesh Golden Nagar Marthandam Mission Hospital SS I/500 KVA under Marthandam section, 7)Eos to 1 no new commercial single phase service connection to Thiru.D.Ramesh Kumar at Panamkuzhivilai Vazhathottam in Kottagam IT company SS of Marthandam section, 8)Eos to 1no Tariff VI new service connection to Thiru.R.Shaji at Kannacode in Kannacode SS III of Marthandam section, 9)Eos to 1 no new Tariff VI SC to Thiru.T.ManiMadathuvilai Nalloor Railwaystation SS I of Marthandam Section, 10)Estimate for 1no 8mtr PSC pole damaged to dashing of vehicle no TN75BA1554 damaged Thiru.Robin Cherukol KattathuraiKariparai SS of Marthandam section, 11)Eos to 1 no Commervial single Phase new service connection to Thiru.B.Babin Daniel at Payanam of Marthandam section, 12)Dc west for shifting of Two numbers 8mtr PSC pole as per the request of Commissioner Municipality KZI Panniyani SS of Marthandam Section, 13)Dcw est for shifting of 1 no 8mtr PSC pole as per the request of Commssioner Municipality KZI at Kannacode of Marthandam section, 14)Estimate for 1 no 8mtr PSC pole damaged to dashing of vehile no TN75AU7720 damaged by M/S G.R.S.Traders Punnathottam Unnamalaikadai of Marthandam section, 15)Dcw est for shifting of one number 8mtr PSC pole as per the request of Commissioner Municipality KZI in Singlair SS of Marthandam section, 16)Dcw estimate for shifting of 1 no Stay set as per the request of Thiru.J.John Rose Kodiyavilai New police station under Marthandam Section, 17)Dcw estimate for shifting of one number 8mtr PSC pole as per the request of Commmissioner Municipality KZI Attakulam of MTM section, 18)Dcw estimate for shifting of 1 no 8mtr PSC pole as per the request of Tmy.Kamala Vattavilai , Karavilai SS of MTM section, 19)Dcw estimate for permanent dismantling of 1 no 8 mtr PSC pole and LT line as per the request of Thiru.The Commissioner Municipality KZI Market SS under MTM section, 20)Dcw estimate for shifting of 1 no 9mtrPSC pole as per the request of Thiru.K.Lincoin Chennithottam at loc no FI-3 of MTM section, 21)Estimate for 1 no 8 mtr PSC pole damaged to dashing of vehicle no TN75 AM3525 damaged by Thiru.Stalin Jose Pulippanam Kattathurai Karavilai SS of MTM section, 22)Estimate for 1 no 8mtr PSC pole damage to dashing of Vehicle np TN74 Y1695 damaged by Thiru.G.Sundar Raj Saralvilai Palliyadi Christurajapuram SS of MTM section, 23)Dcw estimate for shifting of 2 nos 8mtr PSC pole by providing 3nos 8mtr PSC pole as per the request of Commissioner Municipality KZI Kamanattuvilai SS of MTM section, 24)Dcw estimate for shifting of 1 no 9.14 mtr RCC pole as per the request of Commissioner Municipality KZI Kannacode SS of Marthandam section, 25)Dcw estimate for shifting of LT line by providing 1 no 9mtr PSC pole with 3Phase Side arm as per the request of Thiru.Vincent , RC Street Nanthankadu SS of MTM section, 26)Eos to 1 no Tariff -3A1 (Agri Allied) new service to Tmy.S.Devi at Kulakachi SS of MTM section, 27)Eos to 1 no Domestic additional load service connection 181-002-3257 of Tmy.N.Rethika at Melatheru Unnamalaikadai SS of MTM section, 28)Eos to 1 no new TF VI service connection of Thiru.G.S.Manikandan Nambi at Vadake Madam Near Krishnan Kovil in Kannacode Krishnan Kovil SS of MTM section, 29)Eos to 1 no commercial additional load in service connection no 181-006-1466 as per the request of Thiru.Jino at Kulasekaram Road Keel Pammam in Municipal Colony of MTM section, 30)Eos to 1 no new TF VI service connection of Thiru.S.Kishore Kumar at Madathuvilai Vettuvenni SS of Marthandam section, 31)Eos to 1 no Domestic Additional load service no 181-006-1663 of Tmy.Jannet Bai at Kodumkulam in Attakulam SS of Marthandam section, 32)Eos to 1 no Industrial new service connection of Thiru.R.Vijayakumar at Ayiramthengu SS of Marthandam section, 33)Eos to 1 no Domestic additional load in service connection 181-011-2123 of Thiru.R.Vimal Raj Varuthattuvilai Viricode SS of Marthandam Section. 1)696/A31/183/ 2024-25 dt:20.12.2024, 2)696/E3/55/ 2024-25 dt:16.12.2024, 3)696/A31/172/ 2024-25 dt:12.12.2024, 4)696/A31/157/ 2024-25 dt:20.11.2024, 5)696/A31/155/ 2024-25 dt:20.11.2024, 6)696/A31/156/ 2024-25 dt:20.11.2024, 7)626/A31/180/ 2024-25 dt:04.12.2024, 8)626/A31/188/ 2024-25 dt:18.12.2024, 9)626/A31/176/ 2024-25 dt:26.11.2024, 10)696/A31/132/ 2024-25 dt:28.10.2024, 11)626/A31/199/ 2024-25 dt:20.01.2025, 12)696/A31/193/ 2024-25 dt:30.12.2024, 13)696/A31/190/ 2024-25 dt:30.12.2024, 14)696/A31/201/2024-25 dt:23.01.2025, 15)696/A31/192/2024-25 dt:30.12.2024, 16)696/A31/170/2024-25 dt:11.12.2024, 17)696/A31/189/ 2024-25 dt:30.12.2024, 18)696/A31/209/ 2024-25 dt:06.02.2025, 19)696/E3/76/ 2024-25 dt:26.03.2025, 20)696/A31/235/ 2024-25 dt:26.03.2025, 21)696/A31/227/ 2024-25 dt:21.03.2025, 22)626/A31/217/ 2024-25 dt:10.03.2025, 23)696/A31/191/2024-25 dt:30.12.2024, 24)696/A31/194/ 2024-25 dt:30.12.2024, 25)696/A31/05/ 2025-26 dt:09.04.2025, 26)626/A31/198/ 2024-25 dt:20.01.2025, 27)626/A31/213/ 2024-25 dt:14.02.2025, 28)626/A31/222/ 2024-25 dt:25.02.2025, 29)626/A31/229/ 2024-25 dt:06.03.2025, 30)626/A31/224/ 2024-25 dt:25.02.2025, 31)626/A31/220/ 2024-25 dt:19.02.2025, 32)626/A31/248/ 2024-25 dt:29.03.2025, 33)626/A31/247/ 2024-25 dt:29.03.2025.; 1 Civil works 2 Loading&unloading of all REC, RCC pole above 8 m length 3 Excavation of pole pits for pole above 8 m length by using JCB/Manual 4 Erection of RCC,REC,PSC poles above 8 m length by using crane or manual 5 Loading&unloading of all REC, RCC pole upto 8 m length 6 Excavation of pole pits for pole upto 8 m length by using JCB/Manual 7 Erection of RCC,REC,PSC poles upto 8 m length by using crane or manual 8 Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50KM 9 Fixing of LT S phase cross arm 10 Fixing of LT 3 phase cross arm 11 Fixing of LT pin insulator 12 Fixing of shackle 13 Fixing of aluminium knob 14 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc 15 Dismantling of conductors of sizes upto 7/2.11&7/2.59 mm ACSR or equivalent conductor 16 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or equivalent conductor 17 Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor. 18 Paving & Stringing of conductor 7/4.09 mm ACSR 19 Dismantling & Re erection of conductor up to 7/2.59mm ACSR or other equivalent conductor 20 Dismantling & Re erection of conductor of above 7/2.59mm ACSR up to 7/3.35 mm ACSR 21 Dismantling&reerction of conductors of 7/4.09mm ACSR or other equivalent conductor 22 Loading&unloading of line materials 23 Dismantling& re - erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc 24 Drilling/less than 23mm hole per hole/slatted hole 25 Ordinary tree clearance 26 Dismantling & re-erction of V X arm 27 Dismantling & Re-Fixing of 1*40W tube light erected in complete set 28 Dismantling & re-erction of HT pin insulator 29 Dismantling & Re- Fixing of HT Disc Insulater 30 Dismantling & re-erction of LT S phase cross arm 31 Dismantling & re-erction of LT 3 phase cross arm 32 Dismantling & re-erction of Guarding cross arm 33 Dismantling & Re-Erection of Single phase Service connection 34 Dismantling & Re Erection of Three phase Service connection 35 Dismantling & re-erction of LT pin insulator 36 Dismantling & re - erection of LT Shackle 37 Dismantling & re -erection of aluminium knob 38 Dismantling of LT Singlephase cross arm 39 Dismantling of LT 3 phase cross arm 40 Dismantling of LT pin insulator 41 Dismantling of LT shackle insulator 42 Dismantling of Aluminum Knob 43 Dismantling of Stay set 44 Dismantling of 9mtr RCC,REC, PSC &metal pole including the closing of the pit (9 mt PSC Pole) 45 Dismantling of 8mtr RCC,REC, PSC &metal pole including the closing of the pit