Tender For Civil Maintenance To The Aves Lighthouse At Aves Island.; 1 Clearing jungle including uprooting of rank vegetation,grass,brush wood , trees and sapling of girth up to 30cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared, includingsupply of skilled labours,transportation charges of all men & materials worksite, head loads , overheads, cost of minor tools , safety arrangements , insurance of workmen, and all other charges etc complete 2 Painting two coats over previously painted surfacewith synthetic enamel paint of approved quality and color to lighthouse tower, G.I Handrailing , Trap door , G.I.sheet on m.s grill door, Alu.paint in stair and preparing the surface, scrapping the old wornout paint, including Cost of all materials , Scafffoldingssupply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools , safety arrangements , insurance of workmen, and all other charges etc complete. 3 Paintingtwo coats on previously painted interior wall surface of lighthouse tower with interior acrylic emulsion paint (Asian/Berger) of approved brand and manufacture, to give an even shade after preparing the surface properly & then cleaning thecement, painting spots on the floors, doors & windows etc includingCost of materials , scaffoldings, supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools , safety arrangements , insurance of workmen, and all other charges etc complete. 4 Finishing wall with 1st quality Premium Arylic Smooth Exterior Paint with Silicone additives of required shade (Asian /Berger) on old work (two or more coats applied@1.43ltr /10sqm) over existing cement paint surface atallheight to give an even shade etc.wherever required including includingcost of all materials , scaffoldings ,supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools , safety arrangements , insurance of workmen, and all other charges etc complete. 5 Dismantling of wooden doors, windows and ventilators, clerestory windows (steel or wood) shutter including chowkhats,architrave, holdfasts etc, area not exceeding up to 3Sqm, without damaging the adjacent structure including stacking the serviceable material and disposal of unserviceable materials ,supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen, and all other charges etc complete. 6 Providing First Class Teak/Padaukwood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & lengthfinished with synthetic enamelover a coat of wooden primer including cost of all materials, supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen, and all other charges etc complete. 7 Providing and fixing First class teak / Paudak wood panelled 35mm thick shutters for doors, windows and clerestory windows finished with melamine polish over a coat of wooden primer , including supplying and fixing of ISI marked S.S butt hinges (heavy type) : 100x85x5.5 mm bright finished with necessery brass screws, Aluminium tower bolt (barrel type) 250x10 mm, Aluminium handles 125 mm with plate 150x32 mm, Aluminium sliding bolts 300x16 mm , Aluminium singlerubber door stopper and Brass mortice latch and lock 100x65 mm with 6 levers and a pair of anodised aluminium lever handles includingcost of all materials supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen , and all other charges etc complete 8 Providing and fixing swing type fully glazed single leaf aluminium window shutter , aluminium gril with aluminium frame (Jindal make conforming to IS: 733 and IS: 1285)including fixing glazing With float glass/Fiber glass panes of 4.0 mm thickness, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber,all other Aluminium fixtures like Aluminium butt hinges, tower bolts, handles, hooks & eyes etc.,Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws,cost of all materials supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen, and all other charges etc complete 9 Providing and fixing S.S gate with S.S.flats, square or round bars etc. as perdirection at site including all fittings and fixtures, cost of all materials supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen, and all other charges etc complete as directed by engineer in charge.(size 1.00x2.10m) 10 Hiring mechanized dinghy for transportation of officials for supervision during the painting work including hire charges of dinghy, fuel, running cost cost of all materials supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety jackets, obtaining permissions, port charges ,insurance of workmen , and all other charges etc complete 11 Supply of mechnized Dighy of Capacity approx. 4MT with l operatior + 1 helper for loading / unloading & transportation of construction materials from anchorage point/ fish landing jetty to sea shore, including fuel charges, safety jackets, obtaining permissions, port charges, tools &plants and all other charges, and all other charges etc complete 12 Trimming trees of the girth beyond 0.6 m up to 1.2m (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material including cost of all materials ,labours cahrges,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen , and all other charges etc complete 13 Cleaning of the exterior Ceramic tiled surface of lighthouse tower ,Chequirred tiles and inside Lighthouse Ceramic floor tileswith soap solution, removing vegetation, dirt, algea from the surfaces of tiles, including the cost of all materials,, brushes, broom, cleaning cloth , supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen, and all other charges etc complete . 14 Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under with cement mortar 1:4 (1cement: 4 coarse sand), including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all completeincluding a supply of all materials, labours, transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen and all other charges etc complete 15 Felling trees of the girth beyond 0.60 m up to 1.20 m (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material including cost of all materials ,supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen and all other charges etc complete 16 Felling trees of the girth beyond 1.20 m up to 2.40 m (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material cost of all materials supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen and all other charges etc complete 17 Dismantling tile work for thickness of tile 10mm to 25mm in floors laid in cement mortar including stacking material within 50 metres lead including cost of all materials ,supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmen and all other charges etc complete 18 Providing and laying Ceramic glazed Anti Skid floor tiles of approved size (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse river sand), including pointing the joints with white cement and matching pigments etc., completeincluding cost of all materials supply of skilled labours,transportation charges of all men & materials upto worksite , head loads , overheads, cost of minor tools & Plants , safety arrangements , insurance of workmenand all other charges etc complete