}

Tender For Construction Work Of Vrb At Km 0.400 Of Baroda Escape. - Dismentling R.C.C Including Stacking Of Dismentaled Material With In 60 M Distance Including All Cost Of Material, Labour & T&P Etc Complete All As Specified And As Directed By Engineer-I, khurja-Uttar Pradesh

Irrigation Department has published Tender For Construction Work Of Vrb At Km 0.400 Of Baroda Escape. - Dismentling R.C.C Including Stacking Of Dismentaled Material With In 60 M Distance Including All Cost Of Material, Labour & T&P Etc Complete All As Specified And As Directed By Engineer-I. Submission Date for this Tender is 22-08-2025. Bridge Work Tenders in khurja Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

50659191
Tender For Construction Work Of Vrb At Km 0.400 Of Baroda Escape. - Dismentling R.C.C Including Stacking Of Dismentaled Material With In 60 M Distance Including All Cost Of Material, Labour & T&P Etc Complete All As Specified And As Directed By Engineer-I
Tender
Indian
Uttar Pradesh
Khurja
22-08-2025

Tender Details

Construction work of VRB at Km 0.400 of Baroda Escape. - Dismentling R.C.C including Stacking of Dismentaled Material with in 60 M Distance including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. 2 Dismentling R.B.Work including stacking of material within 60 Metre including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. 3 Earthwork in excavation in foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. 4 Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. 5 Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. 6 Centering and shuttering for C.C. work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. 7 Centering and shuttering for R.C.C work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. 8 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. 9 Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&PBut excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. 10 Providing and laying C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&PBut excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. 11 Supplying Laying of one layer of Tar felt I.S.I marked at the junction of wall and roof or any place i/c necessary overlap giving a coat of approved mastic paint below the tar felt i/c all Cost of Material, Labour and T&Petc complete all as specified and as directed by Engineer-in-charge. 12 Steel Reinforcement with Bending, Binding, Cutting and Placing of Reinforcement including cost of Binding Wire with all Cost of Material, Labour and T&Petc complete all as specified and as directed by Engineer-in-charge. 13 S/F 75 mm dia P V C Pipe for weep holes. 14 Earth Work in Filling for Strengthning of Bank, Ramp & approaches i/c Llift upto 1.50m & Lead upto 200 M withall Cost of Material, Labour and T&Petc complete all specified and as directed by Engineer-in-charge. 15 Earthwork in Making & Removal Bundh and disposal including all Cost of Material, Labour and T&P etc complete all specified and as directed by Engineer-in-charge. 16 Finishing of walls with water proofing cement paint of approved make supreme quality of required shade on uncoated wall surface over one coat white cement primer to give even shades after thoroughly brushing the sarface to remove all dirt and remains of loose powdered materials including Curing & Cost of all material etc complete all as specified and as directed by Engineer-in-charge. 17 Supply and Laying of 1200 mm Dia Pipe NP-3 includingall Cost of Material, Labour and T&Petc complete all as specified and as directed by Engineer-in-charge. 18 providing & fixing Sign board at VRB. i/c earth work, excavation, carriage, painting, letter writting and errect with c.c. i/c all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.

Key Value

Document Fees
INR 1129 /-
Tender Value
INR 27.50 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail