Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-08-2025 | Corrigendum No. 04 | Date | 03-09-2025 |
| 2 | 25-08-2025 | Corrigendum No. 03 | BOQ | 03-09-2025 |
| 3 | 23-08-2025 | Corrigendum No. 02 | BOQ | 01-09-2025 |
| Sl. No. | Item Description |
| 1 | M&L for taking out submersible pumpsetany size and any capacityfrom open well / bore well by disconnecting submersible cable connection and delivery pipe line using tripoid chain pulley or any other means, dismantling from GIpipe, opening pump set and carrying for repairs connecting back to MS/GI pipe and lowering the submersible pumpset of capacity upto 5 HP alongwith cable into open well / bore well in original position after repairs complete all as specified and as directed. Note:-(a)Unit ratequotedshall deemed to be included for labour onlyfor taking up & lowering the submersible pump from bore well along with delivery pipe. (b)In case Winding and Other Major Parts requiredshall be measured & paidunder relevant items. |
| 2 | M&L for taking out submersible pumpsetany size and any capacityfrom open well / bore well by disconnecting submersible cable connection and delivery pipe line using tripoid chain pulley or any other means, dismantling from GIpipe, opening pump set and carrying for repairs connecting back to MS/GI pipe and lowering the submersible pumpset of capacity 5 HP to 7.5HP alongwith cable into open well / bore well in original position after repairs complete all as specified and as directed. Note:-(a)Unit ratequotedshall deemed to be included for labour onlyfor taking up & lowering the submersible pump from bore well along with delivery pipe. (b)In case Winding and Other Major Parts requiredshall be measured & paidunder relevant items. |
| 3 | M&L for taking out submersible pumpsetany size and any capacityfrom open well / bore well by disconnecting submersible cable connection and delivery pipe line using tripoid chain pulley or any other means, dismantling from GIpipe, opening pump set and carrying for repairs connecting back to MS/GI pipe and lowering the submersible pumpset of capacity 10 HP to 12.5 HP alongwith cable into open well / bore well in original position after repairs complete all as specified and as directed. Note:-(a)Unit ratequotedshall deemed to be included for labour onlyfor taking up & lowering the submersible pump from bore well along with delivery pipe. (b)In case Winding and Other Major Parts requiredshall be measured & paidunder relevant items. |
| 4 | M&L for taking out submersible pumpsetany size and any capacityfrom open well / bore well by disconnecting submersible cable connection and delivery pipe line using tripoid chain pulley or any other means, dismantling from GIpipe, opening pump set and carrying for repairs connecting back to MS/GI pipe and lowering the submersible pumpset of capacity 15 HP to 20 HP alongwith cable into open well / bore well in original position after repairs complete all as specified and as directed. Note:-(a)Unit ratequotedshall deemed to be included for labour onlyfor taking up & lowering the submersible pump from bore well along with delivery pipe. (b)In case Winding and Other Major Parts requiredshall be measured & paidunder relevant items. |
| 5 | M&L for taking out submersible pumpsetany size and any capacityfrom open well / bore well by disconnecting submersible cable connection and delivery pipe line using tripoid chain pulley or any other means, dismantling from GIpipe, opening pump set and carrying for repairs connecting back to MS/GI pipe and lowering the submersible pumpset of capacity 30 HP to 40 HP alongwith cable into open well / bore well in original position after repairs complete all as specified and as directed. Note:-(a)Unit ratequotedshall deemed to be included for labour onlyfor taking up & lowering the submersible pump from bore well along with delivery pipe. (b)In case Winding and Other Major Parts requiredshall be measured & paidunder relevant items. |
| 6 | Taking out burnt out winding of submersible pump of capacity Up to 1.0 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . Note:-(a)Unit ratequotedshall deemed to be included for labour onlyfor taking up & lowering the submersible pump from bore well along with delivery pipe. (b)In case Winding and Other Major Parts requiredshall be measured & paidunder relevant items. |
| 7 | Taking out burnt out winding of submersible pump of capacity Up to 1.0 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . |
| 8 | Taking out burnt out winding of submersible pump of capacity 3.0 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . |
| 9 | Taking out burnt out winding of submersible pump of capacity 5/6 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . |
| 10 | Taking out burnt out winding of submersible pump of capacity 7.5/9/10 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . |
| 11 | Taking out burnt out winding of submersible pump of capacity 15/20 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . |
| 12 | Taking out burnt out winding of submersible pump of capacity 30/40 HP Motor cleaning the slots with CTC and rewinding the same withnewPVC insulated copper winding wire of existing gauge and turns, assembling back into position by using new suitable studs etc., oiling and greasing and fixing back into position for making motor fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running completeall as specified and directed by the Engineer in charge . |
| 13 | Openingthe submersible pump of capacity 3.0 HP Motor, carrying out repairs, reconditioning of spare parts such as impellers,by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running complete all as specified and directed by the Engineer in charge.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 14 | Openingthe submersible pump of capacity 5/6 HP Motor, carrying out repairs, reconditioning of spare parts such as impellers,by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running complete all as specified and directed by the Engineer in charge.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 15 | Openingthe submersible pump of capacity 7.5/9/10 HP Motor, carrying out repairs, reconditioning of spare parts such as impellers,by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running complete all as specified and directed by the Engineer in charge.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 16 | Openingthe submersible pump of capacity 15/20 HP Motor, carrying out repairs, reconditioning of spare parts such as impellers,by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running complete all as specified and directed by the Engineer in charge.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 17 | Openingthe submersible pump of capacity 30/40 HP Motor, carrying out repairs, reconditioning of spare parts such as impellers,by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer, testing for satisfactory running complete all as specified and directed by the Engineer in charge.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 18 | Carrying out repairs, reconditioning of spare parts of submersible pump of capacity up to 1.0 HP Motor such asthrust bearing with plate, shaft etc., by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 19 | Carrying out repairs, reconditioning of spare parts of submersible pump of capacity 3HP Motor such asthrust bearing with plate, shaft etc., by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 20 | Carrying out repairs, reconditioning of spare parts of submersible pump of capacity 5/6HP Motor such asthrust bearing with plate, shaft etc., by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 21 | Carrying out repairs, reconditioning of spare parts of submersible pump of capacity 7.5/9/10HP Motor such asthrust bearing with plate, shaft etc., by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 22 | Carrying out repairs, reconditioning of spare parts of submersible pump of capacity 15/20HP Motor such asthrust bearing with plate, shaft etc., by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 23 | Carrying out repairs, reconditioning of spare parts of submersible pump of capacity 30/40HP Motor such asthrust bearing with plate, shaft etc., by metalling and machining to their original shape and size, assembling back into position by using new suitable gland/rubber packing including studs, flanges, bolts and nuts etc., oiling and greasing for making pumpset fully functional, testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 24 | M&L for opening of upto 1HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 25 | M&L for opening of 3HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 26 | M&L for opening of 5/6HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 27 | M&L for opening of 7.5/9/10HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 28 | M&L for opening of 15/20HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 29 | M&L for opening of 30HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 30 | M&L for opening of 100HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 31 | M&L for opening of 240/260HP induction motor, taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 32 | Dismantling centrifuga/monoblockpumpset suitable for upto 1HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 33 | Dismantling centrifuga/monoblockpumpset suitable for 3HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 34 | Dismantling centrifuga/monoblockpumpset suitable for 5/6HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 35 | Dismantling centrifuga/monoblockpumpset suitable for 7.5/9/10HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 36 | Dismantling centrifuga/monoblockpumpset suitable for 15/20HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 37 | Dismantling centrifuga/monoblockpumpset suitable for 30HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 38 | Dismantling centrifuga/monoblockpumpset suitable for 40/50HP motor, carrying out repairs, replacement of worn out parts such as impellers etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 39 | Dismantling centrifugal/monoblockpumpset suitable for upto 1.0 HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 40 | Dismantling centrifugal/monoblockpumpset suitable for 3HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 41 | Dismantling centrifugal/monoblockpumpset suitable for 5/6HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 42 | Dismantling centrifugal/monoblockpumpset suitable for 7.5/9/10HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 43 | Dismantling centrifugal/monoblockpumpset suitable for 15/20HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 44 | Dismantling centrifugal/monoblockpumpset suitable for 30HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 45 | Dismantling centrifugal/monoblockpumpset suitable for 40/50HP motor, carrying out repairs, replacement of worn out parts such asbearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functionalapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing complete all as specified and directed.Note : The rate for the parts required for repair is deemed to be include in rate quoted by contractor. |
| 46 | Disconnecting the electrical connection from terminal plate,Taking down the induction motor from foundation of capacity 220/240/260 HP from Centrifugal pump set and Dismantling the motorassy with connected items and cleaning carefully inside of the induction motor ,revarnishing the copper winding wires and reasssemble & testing proper aligment after necessory repair and repair/replacement of the following items paid separately here as after andre-assembling at Berthumapump house .Including transporation from Berthuma pump house to work shop and back. Note : (i)The rate for the minor parts required for repair is deemed to be include in rate quoted by contractor. (ii)Labour element is included in the rate and Make of part shall be existing. (iii) Applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer. (iv) The Major spare parts to be replaced shall be measured and paid separetely as supply only under respective items given here-in-after. |
| 47 | Supply only slip ring assy complete with studs made out of copper as sample suitable for 220-260 HP Capacity Motor |
| 48 | Supply only carbon bush holder made of bronzeas sample suitable for 220-260 HP Capacity Motor |
| 49 | Supply only carbon brushes holder made of bronzeas per existing sizes per sample suitable for 220-260 HP Capacity Motor |
| 50 | Supply only bearing Srl No SKF NU319 |
| 51 | Supply only bearing Srl No SKF 6319Z |
| 52 | Supply only bearing Srl No SKF 6318Z |
| 53 | Supply only bearing Srl No SKF 6315 |
| 54 | Supply only bearing Srl No NKF NU37310 |
| 55 | Supply only bearing Srl No NKF NU6310 |
| 56 | M&L for openingtheinduction motorof capacity 135/150 HP from VT pump taking out damaged/burnt out winding from single phase /three phase motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing and fixing back into position for making motor fully functional applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerand testing for satisfactory running complete all as specified and directed by the Engineer in charge Note : The quoted rate included with replacement of spare parts |
| 57 | Taking down the induction motor of capacity 135/150 HP from VT Pump and Dismantling carbon bush holder, carbon bush and slip ring assy with connected items and revarnishing the copper winding wires and reasssemble & testing proper aligment after necessory repair and repair/replacement of the following items paid separately here as after andre-assembling at jack well chittora pump house .Including transporation from chittora pump house to work shop and back. Note : (i)Replacement of defective part only shall be replaced if required & measured & paid separately under respective items as under :- (ii)Labour element is included in the rate and Make of part shall be existing (iii). Applying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primer |
| 58 | Supply only slip ring assy complete with studs made out of copper as per existing sample |
| 59 | Supply only carbon brushes holder made of bronzeas per existing sizes as per sample |
| 60 | Supply only carbon brushesas per existing size and as per sample |
| 61 | Taking out the existing DOL starter, 415V, 3 Ph, 50 Hz from panel suitable for up to 5 HP Capacity motor , cleaning the electronic parts from inside, refixing the OLR, Contactor, NVC and SPP etc of the following capacity motor complete all as specifiedand directed.NOTE : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 62 | Taking out the existing DOL starter, 415V, 3 Ph, 50 Hz from panel suitable for 7.5 HP Capacity motor , cleaning the electronic parts from inside, refixing the OLR, Contactor, NVC and SPP etc of the following capacity motor complete all as specifiedand directed.NOTE : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 63 | Taking out the existing Star-delta starter suitable for 10 HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.NOTE : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 64 | Taking out the existing Star-delta starter suitable for 12.5HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.NOTE : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 65 | Taking out the existing Star-delta starter suitable for 15/20 HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.NOTE : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 66 | Taking out the existing Star-delta starter suitable for 30/40 HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.NOTE : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 67 | Taking out the existing Star-delta starter suitable for 50 HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.Note : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 68 | Taking out the existing Star-delta starter suitable for 220 HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.Note : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 69 | Taking out the existing Star-delta starter suitable for 260/240 HP Capacity motor from panel, cleaning the electrnic parts from inside, refixing the OLR, Contactor, NVC,and SPP connecting link wires etc of the following capacity motorcomplete all as specifiedand directed.Note : Quoted rate deemed to include to replacement of spares and making serviceable condition |
| 70 | M&L for disconnecting cable connection from exitingSoft starter suitable for 220/ 240/260HP Capacity motor at Berthuma Pump house, 415V, 3 Phase,50Hz and including replacement of such a spare parts of Bypass relay and contactor, Plate and stays, USB cable , current transformer, connection kit etc and making serviceable condition testingand commissioning complete all as specified and directed. |
| 71 | Supply,installed, connecting testing and commissioning open well submersiblepumping set , electric driven of capacity 780 LPM at 54 mtr headcomplete including disconnecting all electrical and water connections and taking down of existing unserviceable pump set and depositing to MES E/M store yard complete all as specified and directed. |
| 72 | Supply and connecting in replaceof 3 core x 6 sqmm Flat copper conductor cable 1100 Volts grade, PVC Insulated & PVC Sheathed conforming to IS- 694/1990for submersible pump setcomplete all as specified and directed. |
| 73 | Supply and connecting in replace of 3 core x 10 sqmm Flat copper conductor cable 1100 Volts grade, PVC Insulated & PVC Sheathed conforming to IS- 694/1990for submersible pump setcomplete all as specified and directed. |
| 74 | Supply and fix DOL Starter415V, 50Hz, 3 Phasesuitable for Upto to 7.5HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size all as specified and directed. |
| 75 | Testing of borewells water with following test to be done and certified by authorised government central/state agencies:-TDS,Chloride,Floride,Alkaline,E-COLI (bacteriological test). |
| 76 | M&L Chlorine Testing Kit by Orthotolidine method with all accessories (colour matching PPM tubes, water testing tubes, Orthotolidine solution and wooden Box) complete all as specified and directed. |
| 77 | M&L for disconnecting cable connection from exitingSoft starter suitable for 135/150 HP Capacity motor at Chittora Pump house, 415V, 3 Phase,50Hz and including replacement of such a spare parts of Bypass relay and contactor, Plate and stays, USB cable , current transformer, connection kit etc and making serviceable condition testingand commissioning complete all as specified and directed. |
| 78 | Flushing of Tube well using conventional method by means of Air compressor of suitable capacity at least 3 Hours minimum till sand/mud water clean water obtained complete all as specified and directed. |
| 79 | Supply only the GI tubing 50 mm dia heavy grade not less than3 meter long each pipe with long threadheavy duty socketvertical delivery pipe of submersible pump setall as specified. |
| 80 | Supply and fix CI Foot valve Pin type conformingto IS Suitable for 200 mm to 450mm dia complete including replacement of Bolt,Nuts with washers anf gaskets complete all as specified and directed. |
| 81 | Supply only MS Bolt,Nut with two washers different size and length complete all as specified and directed. |
| 82 | Earthing complete with galvanised steel earth plate electrode 60×60cm.× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less\"than 1.5 metres below normalground level, connected to galvanised earth lead wire 4.0mm dia by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion using galvanised iron strip 32×6mm as earthing lead complete all as specified and directed. |
| 83 | Removing the wooden sleepers from the slots /opening of the anicutacross the river Bewas at Chittorain the lean season andstacking themseparately for their serviceability after applying black oil to serviceable sleepers and unserviceable sleepers shall be stacked properly for inspection complete all as specified and directed. |
| 84 | Supply and fixing in repair the new second class hard wood (well seasoned) wooden sleeper of size 150mmx 100 mm cross sectional size and not less than 1475 mm (59\")long duly tapered at end for easy insertionin the slots complete with and incl 02 Nos eye hooks made out of MS plain round bar 20 mm dia 400 mm long for each hook and the dia of hook shall be 50 mm, the other end of the round bar shall be tapered and fixed with wooden sleeper incl applying a coat of coal tar on entire surface of sleepers complete all as specified and directed. |
| 85 | Refixing of wooden sleepers which are stacked at Chittora pump house in the slots of Anicut and tide with 18 SWG GI wire to protect the wooden sleepers and fixed with wooden sleeper incl applying a coat of coal tar on entire surface of sleepers , from washing out in heavy water current upto a level of 16 feet from bottom to anicut. |
| 86 | S& F black cotton/ yellow soil as required in water condition to fill the gap of two sleepers in the slots ofthe maximum height16 Feet to avoid the leakage/seepage of water entire contract periodcomplete all as specified and directed.Note :(a) Contractor will be responsible for filling of black cotton soil in between gap of two sleepers of the slot upto 16 feetheight without any leakage as per directions of Engineer in Charge (b) Entire quantity of BC soil shall be delivered by Contractor before mansoon & will be stacked properlyat a distance of 20 mtr away from river as per directions of Engr-in-Charge. (c). Ratedeemed to include to provide insurance/safty belt/ ladder etc as required at site. |
| 87 | M&L for Opening the wooden sleepers upto 8 feet from chittora ancut gate for release of water to Dhana and closing the anicut slots upto 16 feet complete all as specified and directed. Note(i) Rate deemed to include to filling the cotton soil upto 16 feet height without any leakeage (ii)Ratedeemed to include to provide safty belt/ ladder etc as required at site |
| 88 | M&L for arresting water leakeage from slots in anicut gates upto 16 feet height to fill the cotton soil with out any leakeage complete all as specified and directed. Note(i) Rate deemed to include to filling the cotton soil upto 16 feet height without any leakeage (ii)Ratedeemed to include to provide safty belt/ ladder etc as required at site |
| 89 | Removing the silt/rubbish deposited on the other side of the anicut and depositing at a place not more than 50 mtrs and removing as directed by Engr-in-Charge. Note : The silt/rubbish shall be stacked properly for measurement purpose all as directed. |
| 90 | Cutting and removing the washed out deposit at anicuttrees/tree branches during the monsoon and before closing the anicut. The trees /tree branches obtained from the river shall be weighed.The weighing of wood shall be contractors responsibility and no extra shall be payable to him on this account. |
| 91 | M& L for Cutting of vegetation,bushes grass etc surrounding the pump house,power house and OHT/ Sump area at various installations and removing to a distance of 50 mtr all as directed. |
| 92 | M&L for PCC 1:4:8 type B 1 using 20 mm graded aggregate as in filling and making good distrubed surface all as specified and directed by the Engineer-in-charge |
| 93 | Taking down the existing rusted/damaged Motor pump frame from existing location and fabricatednew MS frame as per size,thicknessapplying two coats of synthetic enamel paint overa coat of red oxide zinc chrome primerall complete all as specified and directed. |
| 94 | S&F in replacement glow sign board for E/M installations with computerised words printed in PVC board matter and size of lettters as approved by Engineer-in-Charge) including fabrication of work, angle iron, elecgtrical connection with suitable copper wires and LED fittings complete all as specified and directed |
| 95 | M & L for painting of CI /GI/MS pipe line with one coat of red oxide , zinc chrome and two coats of anti corrosive synthetic enamel paint including prearation of old painted surface complete all as specified and as directed .Note:- Inlet pipe should be painted in blue colour , out let pipe should be painted in green colour andOverflow pipe with Yellow complete all as specified and directed. |
| 96 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for upto 10 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
| 97 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for 12.5 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
| 98 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for 15 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
| 99 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for 20 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
| 100 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for 30 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
| 101 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for 40 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
| 102 | Supply and fix Star delta starter 415V, 50Hz, 3 Phasesuitable for 50 HP Motor, including replacement of copper lugs as per suitable and making suitable mounting on wall/floor stand with angle bolt,nut with wahsers as per size complete all as specified and directed. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail