|
| 1 | 25kVA Mastrang |
| 2 | ERRECTION OF L.T LINE ON 9Mtr. Long S.T pole. |
| 3 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 4 | ERRECTION OF STAY SET |
| 5 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 6 | ERRECTION OF EARTHING SET |
| 7 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 8 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 9 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 10 | Sagging of G.I Wire for earth wire. |
| 11 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.500 K.M. |
| 12 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 13 | Prov. RCC Muffs 2Mtr. |
| 14 | Prov. LT stay set. |
| 15 | Prov .Shakle Insulator (16KN) |
| 16 | Prov .D-Iron (U-Clamps) |
| 17 | Prov. Nuts & bolts. |
| 18 | Prov. Aluminium paint. |
| 19 | Prov. Stay clamp |
| 20 | Providing Egg Insulator. |
| 21 | Prov. stay Wire (7/3.15mm) |
| 22 | Prov. Earthing Set Complete. |
| 23 | Prov. ACSR 6/1/2.59mm2 (30mm2) |
| 24 | Prov. Steel Tubular pole (9m, working load >200kgf/m2) |
| 25 | 25kVA Nagasti (Dhar Tawala) |
| 26 | ERRECTION OF L.T LINE ON 9Mtr. Long S.T pole. |
| 27 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 28 | ERRECTION OF STAY SET |
| 29 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 30 | ERRECTION OF EARTHING SET |
| 31 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 32 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 33 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 34 | Sagging of G.I Wire for earth wire. |
| 35 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.400 K.M. |
| 36 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 37 | Prov. RCC Muffs 2Mtr. |
| 38 | Prov. LT stay set. |
| 39 | Prov .Shakle Insulator (16KN) |
| 40 | Prov .D-Iron (U-Clamps) |
| 41 | Prov. Nuts & bolts. |
| 42 | Prov. Aluminium paint. |
| 43 | Prov. Stay clamp |
| 44 | Providing Egg Insulator. |
| 45 | Prov. stay Wire (7/3.15mm) |
| 46 | Prov. Earthing Set Complete. |
| 47 | Prov. Steel Tubular pole (9m, working load >200kgf/m2) |
| 48 | Prov. ACSR 6/1/2.59mm2 (30mm2) |