| 1 | REPAIR AND MAINTENANCE OF HANDIYA BRANCH CANAL RD 12.00 TO 21.00 KM IN DISTT. HARDA |
| 2 | Excavation in all kind of soft/loose/hard/dense soils, moorum & moorum mixed with boulders and mud including dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. Complete.as per Specifications design, drawing and as directed by engineer in charge . For lined canal |
| 3 | Providing and laying M-15 grade Plain Cement Concrete Design Mixusing graded aggregate clean, hard for super structure including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position,evelling, vibrating, finishing, curing ,packing joints of shuttering etc. complete. Using graded aggregates of maximum size.20 mm as per Specifications design, drawing and as directed by engineer in charge . |
| 4 | Medium shrub jungle (25% to 50% area covered by shrubs) clearance involving removal of grass, shrubs, bushes and twigs including rooting out and disposal etc., complete. as per Specifications design, drawing and as directed by engineer in charge . |
| 5 | Clearance of Jalkumbhi /Water Lily from water bodies including removing and rental cost of boat,abour etc. complete and disposal of material by burning includingall other charges for materials andmachinery etc., complete. as per Specifications design, drawing and as directed by engineer in charge . |
| 6 | Earthwork for embankment for breached/ damaged portion of dam/canal, using selected impervious soil from approved borrow area/ spoil bank in 100 to 150 mm layers (before compaction), including cost of materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges/sides, watering, compacting to achieve maximum dry density using sheep foot roller / vibratory compactors etc., complete. as per Specifications design, drawing and as directed by engineer in charge . |
| 7 | Maintenance of canals wherever required, having bed width more than 5m or discharge more than 10 cumecs (as applicable) & depth of canal < 3m by deploying a unit of T-210 or T-110,Dumper/Tractor trolley and 10 numbers of labour, to restore the bed levels and side slopes of canal section, including service road to proper condition, including clearance of all vegetation such as grass, shrubs, bushes etc. and disposal of surplus and un-useful earth or borrow of earth, as required, including cost of all materials, labour and transportation etc., complete. as per Specifications design, drawing and as directed by engineer in charge . For lined canal |
| 8 | Clearance of silt and debris and maintenance (wherever required) of one row hume pipe of diameter up to 2 m syphon or cross drainage or V.R.B. structures including upstream and downstream reaches to restore the structures to original shape, such as repair of cracks in parapet wall and/ repair of pitching & other protection works including cost of all material, labour and transportation etc., complete. as per Specifications design, drawing and as directed by engineer in charge . |