Tender For Providing And Fixing Of Spares For Ht, Lt, Apfc, Starters, Other Panels And Repairing Of Various Equipment And Electrical Installation For Gangapur Dam Pumping Station, Booster Pumping And Various Tp Of Nmc.-1 P/F digital ammeter for measuring current 2 P/F digital voltmeter for measuring voltage 3 P/F multifunction meter 4 P/F selector switches for voltmeter & ammeter 5 P/F light emitting diode type indicator 6 P/F switch disconnector fuse (SDF) a 100A. b 200A. c 300A. d 400A. e 630A. f 800A. 7 P/F moulded case circuit breaker (MCCB) a Up to 100A. b 200A. c 250A. d 315/400A. e 600 / 630A. f 800A. 8 P/F MCB a 6A to 32A b 40A to 63A. c P/F One way distribution board suitable for MCB 9 P/F Busbar chamber with triple pole neutral aluminium bus bar a 100A. b 200A. c 300A. d 400A. e 630A. f 800A. 10 P/F DOL starter a Up to 7.5HP. b Up to 10HP. 11 P/F street light bracket complete 12 P/F FRP box on pole/wall complete a 150mm x 125mm x 100mm, 2.7 mm thick b 250mm x 200mm x100 mm, 2.7 mm thick c 300mm x 200mm x125 mm, 2.7 mm thick 13 P/F LED 22W tube light fitting (4 feet) with aluminium housing, heat sink, integrated HF electronic driver complete 14 Providing and filling Transformer oil 15 Point wiring in PVC trunking (casing-capping) with (2+1E) copper wire, modular type switch, earthing and required accessories 16 Point wiring for independent plug in PVC trunking (casing capping) with (2+1E )FRLSH grade copper wire, modular type switch, earthing and required accessories 17 P/F mains with 2 X 2.5sq.mm 1.1KV grade copper PVC stranded/solid wire complete (2 core, 71+36(1 core earthing)=107/- ) 18 Supplying and erecting PVC trunking (PVC casingn- capping) of size 25mm with accessories on wall/ceiling 19 P/F half round 15cm dia RCC hume pipe with necessary back filling etc complete 20 Providing and spreading stone metal 25mm size for 100mm depth above the ground level. 21 P/F three phase heavy duty power capacitors in suitable banks with voltage rating 440V, 50Hz 22 Providing and laying Aluminium conductor 3.5 core XLPE/PVC armoured 1.1KV grade cable a 25sq.mm b 35sq.mm c 50sq.mm d 70sq.mm e 95sq.mm f 120sq.mm g 150sq.mm h 185sq.mm i 240sq.mm j 300sq.mm k 400sq.mm 23 Providing and laying Aluminium conductor 1 core XLPE/PVC armoured 1.1KV grade cable a 1 Core, 630sq.mm b 1 Core, 800sq.mm c 1 Core, 1000sq.mm 24 Providing and laying Aluminium conductor 4 core XLPE/PVC armoured 1.1KV grade cable a 4sq.mm b 6sq.mm c 10sq.mm d 16sq.mm 25 Providing and laying Aluminium conductor 2 core XLPE/PVC armoured 1.1KV grade cable a 4sq.mm b 6sq.mm c 10sq.mm 26 Providing and laying copper conductor 2.5sq.mm XLPE/PVC armoured 1.1KV grade cable a 2 Core, 2.5sq.mm b 3 Core, 2.5sq.mm 27 P/L flexible PVC sheathed submersible type copper cable. a 4 core 2.5 sq mm b 4 core 4 sq mm c 4 core 6 sq mm d 4 core 10 sq mm e 4 core 16 sq mm f 4 core 25 sq mm g 4 core 35 sq mm 28 Providing and laying Alu. conductor 3 core, XLPE /PVC 3.3KV armoured cable a 70sq.mm b 95sq.mm c 120sq.mm d 150sq.mm e 185sq.mm f 240sq.mm g 300sq.mm h 400sq.mm 29 P/F heat shrinkable outdoor termination kit for 3.3Kv (E) XLPE HT cable erected and connected to the supply with insulated sleeves,additional lugs & nut bolts for all core for 3 core cable with HT testing at site etc complete a 70-120sq.mm b 150-185sq.mm c 240-400sq.mm 30 P/F Heat shrinkable indoor termination kit for 3.3Kv (E) XLPE HT cable erected and connected to the supply with insulated sleeves,additional lugs & nut bolts for all core for 3 core cable with HT testing at site etc complete a 70-120sq.mm b 150-185sq.mm c 240-400sq.mm 31 P/F Heat shrinkable straight through joint kit for 3 core, 3.3Kv (E) XLPE HT cable etc complete a 70-120sq.mm b 150-185sq.mm c 240-400sq.mm 32 Providing and laying Aluminium conductor 3 core, XLPE/PVC 11KV armoured cable a 95sq.mm b 120sq.mm c 150sq.mm d 185sq.mm e 240sq.mm f 300sq.mm 33 P/F heat shrinkable outdoor termination kit for 11Kv (E) XLPE HT cable erected and connected to the supply with insulated sleeves,additional lugs & nut bolts for all core for 3 core cable with HT testing at site etc complete a 70-95sq.mm b 120-185sq.mm c 240-300sq.mm d 400sq.mm 34 P/F Heat shrinkable indoor termination kit for 11Kv (E) XLPE HT cable erected and connected to the supply with insulated sleeves,additional lugs & nut bolts for all core for 3 core cable with HT testing at site etc complete a 70-95sq.mm b 120-185sq.mm c 240-300sq.mm d 400sq.mm 35 P/F Heat shrinkable straight through joint kit for 3 core, 11Kv (E) XLPE HT cable etc complete a 70-95sq.mm b 120-185sq.mm c 240-400sq.mm 36 Providing and laying Alu. conductor 3 core, XLPE / PVC 33KV armoured cable a 95sq.mm b 120sq.mm c 150sq.mm d 185sq.mm e 240sq.mm f 300sq.mm 37 P/F heat shrinkable outdoor termination kit for 33Kv (E) XLPE HT cable erected and connected to the supply with insulated sleeves,additional lugs & nut bolts for all core for 3 core cable with HT testing at site etc complete a up to 70sq.mm b 95-150sq.mm c 185-240sq.mm d 300-400sq.mm 38 P/F Heat shrinkable indoor termination kit for 33Kv (E) XLPE HT cable erected and connected to the supply with insulated sleeves,additional lugs & nut bolts for all core for 3 core cable with HT testing at site etc complete a up to 70sq.mm b 95-150sq.mm c 185-240sq.mm d 300-400sq.mm 39 P/F Heat shrinkable straight through joint kit for 3 core, 33Kv (E) XLPE HT cable etc complete a up to 70sq.mm b 95-150sq.mm c 185-240sq.mm d 300-400sq.mm 40 P/F Heat shrinkable straight through joint kit for flexible PVC sheathed submersible type copper cable. a 4 core 2.5 sq mm b 4 core 4 sq mm c 4 core 6 sq mm d 4 core 10 sq mm e 4 core 16 sq mm f 4 core 25 sq mm g 4 core 35 sq mm 41 P/F HT capacitor suitable for 3.3KV in suitable banking 42 Making fabrication work using 16 gauge metal sheet with bending, cutting, drilling and welding complete 43 Powder coating in siemens gray colour 44 Making Iron work for fabrication with bending, cutting, drilling and welding complete 45 Epoxy painting on both side of approved colour shade of provided iron work 46 P/F GI strip of suitable size 47 P/F M.S. stand for fire bucket 48 P/F Wall hook for fire bucket 49 P/F G.I fire bucket 9Lit 50 P/F Instruction chart 51 Pair of rubber hand gloves 52 Supplying and erecting fire extenguisher 4.5Kg 53 P/F High voltage insulating Electromat confirming to IS 15652 :2006 a Suitable for 3.3KV. b Suitable for 11KV. c Suitable for 33KV. 54 Providing and laying double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete a 50 mm b 75 mm c 90 mm d 120 mm e 160 mm f 175 mm g 200 mm 55 P/F Flood light LED fitting for street light a 50W b 70W c 100W d 120W e 155W f 195W 56 P/F aluminium PVC unarmoured cable 2 X 6sq.mm of 1.1kv grade 57 P/F mini feeder pillar triple pole with 200A MCCB as incomer etc complete 58 P/F mini feeder pillar triple pole with 300A MCCB as incomer etc complete 59 P/F fencing of section having size 2450 mm in height from ground level and 1200 mm width with angle iron frame work complete 60 P/F double leaf hinged door each 1500 mm in width x 1850 mm in height using B class, GI pipe with angle iron supports, chain link wire meshcomplete 61 P/F 50 x 50 x 6mm angle iron corner support 0.5m away from fence support fixed etc. 62 Providing and fixing ultra violet storage type water purifier (RO+UV+UF) with softener for safe drinking water consisting of UV germicidal tube of 8W capacity choke made of copper wire and two indicator lamps 63 P/F analog Ammeter for measuring current 64 P/F analog Voltmeter for measuring voltage 65 Providing and laying XLPE armroured cable for 3.3KV with ISI mark 1 core 630 sq.mm. stranded aluminium wire in an approved manner. 66 P/F heat shrinkable outdoor termination kit for 3.3Kv (E) XLPE HT cable erected and connected the supply with insulated sleeves,additional lugs nut bolts for 1 x 630 sqmm cable with HT testing site etc complete 67 P/F programmable logic controller for Thyristor logic KPOPF – 406 – T. 68 P/F Injector module for Thyristor logic KPIPF 406 – T. 69 P/F Zero switching module for Thyristor logic KPZPF – 406 – T. 70 P/F current generator 440V, 50Hz, for final compensation of real time PFC after basic compensastion using programmable logic controller, relay module, ZCS control thyristor units with its software, hardware, power and control cabling etc complete. a Up to 42A b 42A to 56A c 70A to 105A. d 112A to 140A 71 P/F ROM-51 memory controller with accessories along with routine software program for Thyristor logic. 72 P/F ROM-51 memory controller with accessories along with routine software program for zero switching logic. 73 P/F voltage transformer with 11V, 18-0-18V, 22V, 8V secondary. 74 P/F output module for soft starter-KPOSS-306. 75 P/F proportional Integral card with operational amplifier KPISS-306. 76 P/F analog to Digital converter ATD-09. 77 P/F MCR-31 Main controller with accessories. 78 P/F 7-Segment common anode display controller DSP-79 with accessories. 79 P/F RAM-64 memory unit with accessories. 80 P/F ROM-SS-64 memory unit with accessories along with routine software program. 81 P/F ROM-SS-51 memory unit with accessories along with routine software program 82 P/F flat band cable set 26pin. 83 P/F flat band cable set 20pin. 84 P/F glass type relay O/E/N RL-24. 85 P/F 2A fuse box of EI for power supply (20Nos). 86 P/F 2A glass fuse base open type FBO. 87 P/F tertiary current transformer 88 P/F PLA relay 24D 1NO RDRL-24. 89 P/F SMPS ripple filter choke 5V DC, 1500mA. 90 P/F 24VDC, 10A Electromechanical relay PLA and snubber. 91 P/F voltage transformer with O/P 6.8V, 11.5V, 22.5V Delta to star. 92 P/F programmable logic controller module for contactor logic KPOPF – 406 – C. 93 P/F injector module for contactor logic KPIPF – 406 – C. 94 P/F relay module for contactor logic KPRLPF – 406 – C. 95 P/F ROM-51 memory controller with accessories along with routine software program for contactor logic. 96 P/F thyristor back to back connected suitable for following starters and Capacitor banks. a 75HP. b 120HP. c 215HP. d 300HP. e 10KVAR f 15KVAR g 20KVAR h 25KVAR i 30KVAR 97 P/F inductor suitable for following Capacitor banks. a 10KVAR b 15KVAR c 20KVAR d 25KVAR e 50KVAR 98 P/F electrical contactors. a 32A. b 40A. c 70A. d 110A. e 200A. f 300A. g 400A. h 650A 99 P/F main contact kit for power contactor. a 32A. b 40A. c 70A. d 110A. e 200A. f 300A. g 400A. h 650A 100 P/F HRC fuses. a 40A. b 50A. c 63A. d 100A. e 125A. f 160A. g 200A. h 250A. i 315A. j 400A. k 630A. l 800A. 101 P/F fuse bridges. a Up to 32A. b 63A. c 160A. d 250A. e 800A. 102 P/F change over switches. a 63A. b 125A. c 200A. d 250A. e 315A. f 400A. g 630A. h 800A. i 1000A. 103 P/F timers. a ET-100. b Star-Delta. 104 P/F FASD starter. a ML2 b ML3 c ML4 105 P/F energy efficient street light fitting using 36W CFL lamps complete. 106 P/F 11KV HT fusegear for fuse switch unit of CGLucy 107 Actuator control unit. a P/F forward / reverse contactor b P/F over load relay. c P/F contact kit 108 Providing and laying copper conductor 12 core 2.5sq.mm XLPE/PVC armoured 1.1KV grade cable 109 P/F electronic control unit suitable for up to 175HP, control Supply 240V AC, Power Suply 415V AC, with all test and trials complete. 110 P/F electronic control unit suitable for up to 300HP, control Supply 240V AC, Power Suply 415V AC, with all test and trials complete. 111 P/F limit Switch for gate 112 P/F 10 Turns Preset. 113 P/F panel accessories such as push button with indicators, NO/NC contact, emergency stop push button, copper lug for control cable, gasket, etc complete. 114 P/F C I pipe type earthing etc complete. 115 P/F 230V, 2 C/O panel mounted relay. 116 P/F single phasing preventer relay 117 P/F single phase, under voltage, over voltage protection relay. 118 P/F oil temperature sensing relay 119 P/F winding protection relay 120 P/F reverse rotation sensing relay 121 P/F Motor protection relay for LT motor 122 P/F Control transformer with protection circuit 123 P/F PVC type earthing chambers with accessories for earthing. 124 Power contactor coil LC-1F 330 125 P/F sequence controller 126 Providing, fixing termination box for submersible pump to ATS starter with bus bar, terminations etc complete 127 Providing and laying 95sq.mm copper conductor 1 core flexible PVC unarmoured 1.1KV grade cable 128 Energy meter panel a P/F Energy meter single phase 230V, 50Hz, 10A supply complete b P/F Energy meter 3 Phase, 4 wire, 50Hz, 100A supply complete c P/F L.T. Current transformer of suitable ratio d Making fabrication work using 16 gauge metal sheet with bending, cutting, drilling and welding complete e Powder coating in siemens gray colour f Control wiring using copper wire, ferrule, lugs, tie saddle, spiral etc complete. g Panel accessories such as hardware, gasket, insulator, panel knob, panel lock for each feeder complete . h Dismantling of old meter panel by disconnecting connections of all cables, etc complete i Installation of new meter panel by fixing meter box, making incoming and out going connection etc complete. 129 Starter Panel a P/F digital ammeter for measuring current b P/F digital voltmeter for measuring voltage c P/F selector switches for voltmeter & ammeter d P/F light emitting diode type indicator e P/F L.T. Current transformer of suitable ratio f Providing and fixing Main Incommer 63A moulded case circuit breaker g P/F 100A Busbar chamber with triple pole neutral aluminium bus bar h Making fabrication work using 16 gauge metal sheet with bending, cutting, drilling and welding complete i Making Iron work for fabrication with bending, cutting, drilling and welding complete j Powder coating in siemens gray colour k P/F DOL ML 1.5 starter l P/F FASD ML2 starter m P/F FASD ML3 starter n P/F FASD ML4 starter o P/F Over load relay. p Control wiring using copper wire, ferrule, lugs, tie saddle, spiral, etc complete. q Local/remote wiring using copper wire, ferrule, lugs, tie saddle, spiral, etc complete. r Panel accessories such as hardware, gasket, insulator, panel knob, panel lock, bus bar terminals, etc complete. s Dismantling of old starter panel by disconnecting connections of all cables, etc completet Installation of new starter panel by fixing starter panel, making incoming and out going connection etc complete. u Terminations main outgoing cables by using lugs glands etc complete. 130 LT Panel, Changeover Panel, Distrubution Panel, Feeder Panel a Power wiring up to 63A feeder using copper wire, lugs, tie saddle, spiral etc complete. b Control wiring for metering using copper wire, ferrule, lugs, tie saddle, spiral etc complete. c Panel accessories such as hardware, gasket, insulator, backlite, panel knob, panel lock, push button with indicators, heavy duty connectors earthing arrangement, etc complete for following feeders i Up to 100A ii 100A to 250A iii 250A to 400A iv 400A to 800A d Dismantling, disconnecting connections of all cables, shifting old panel in godown etc complete of following capacity. i Up to 100A ii 100A to 250A iii 250A to 400A iv 400A to 800A e Installation of panel at desired place including loading unloading and transportation of following capacity i Up to 100A ii 100A to 250A iii 250A to 400A iv 400A to 800A f Making new terminations of main incoming/outgoing cables, etc complete for following feeders. i Up to 100A ii 100A to 250A iii 250A to 400A iv 400A to 800A g Interlocking, forward/reverse, timing and control circuit/star delta circuit etc control wiring using copper wire, ferrule, lugs, tie saddle, spiral, etc complete for one feeder. 131 P/F 3 phase street light timer controller of 60 A per phase rating with in-built relay, timer, protections, display 132 Providing, fixing and testing of HT TOD meter of appropriate class with required accessories along with co ordnation with MSEDCL complete. 133 Providing, fixing and testing of LT TOD meter of appropriate class with required accessories along with co ordnation with MSEDCL complete. 134 P/F Motor protection circuit breaker 135 P/F 3 Phase heavy duty industrial socket. 136 P/F 1 Phase heavy duty industrial socket. 137 P/F and erecting 6mm Polycarbonate multiwall ultravoilet protected sheet for roofing over fabricated steel structure as per detail design, including fixing the Polycarbonate sheet with alluminium angle & Flat anodized & dyed as per approved shade including all water proofing materials, nuts bolts hardware, labour & square pipe, angles, fabrication complete including all hardware etc. as required . (only actual area of polycarborted sheet to be considered for measurements) 138 Making isolation circuit using AB switch / D.O. Set for single pole & converting the cutpoint by dismantling with nessasary material, jumping, earthing along with arrangement of shutdown etc. complete. 139 P/F diesel filling pump for filling diesel in dg sets from store tanks etc complete. 140 P/F meter box for single phase energy meter complete. 141 P/F meter box for three phase energy meter with compartment for mccb/mcb etc complete. 142 P/F of spares for DG control panel a Flush mounted panel meter three phase four wire for frequency etc. b 12V/80AH Battery c 12V/100AH Battery d 12V/150AH Battery e 12 V/180AH Battery f 12V/200AH Battery g Battery water h EPU unit i AVR j AMF Controller k Voltmeter DC l Ammeter DC m Push button n ESR D1 o 12V battery charger p 24V battery charger q Overload relay r Relay s Electronic Timer t Hooter u Connector 143 Reconditioning of transformer a Inspection of distribution transformer on HV and LV side b Dismantling the distribution Transformer from the plinth / foundation c Providing and filling Transformer oil d Painting of transformer using smoke gray paint complete e Providing and rewinding of copper material for HT coils f Heating of core and winding, including removing of moisture etc complete g Providing oil arresting sheet for low tension side of R Y B studs, 5mm thick properly fitted in the studs of transformer. h Providing oil arresting sheet for top cover of oil chamber, LT connection box, oil tank etc parts ,5mm thick properly fitted in the top cover and nut bolts of transformer i Providing R Y B stud bushings over the oil arresting sheet on the studs of transformer . j Reinsulation by high quality uniform covering throughout of 11KV windings using accessories complete k Reinsulation by high quality uniform covering throughout of 415V windings using accessories complete l Repairing and servicing of tap changer of transformer m Transformer oil filtration n Changing silica jel of breather and adding breather oil. o Loading, unloading and transportation of transformer. p Attendance, engineering charges for connection of HT/LT cables and giving satisfactory test & trials of transformer complete 144 P/F Analog input module AI 2xI, 4-wire transmitter (+/-20 mA /13 bits+sign, 4 mA to 20 mA/13 bits), standard 145 P/F Analog input module AI 4xI, 2wire- MU(4..20mA), standard 146 P/F Digital output module DO 8xDC24V/0.5A, supports isochrone mode 147 P/F Power module PM-E for electronic modules, 24 VDC, with diagnostics 148 P/F Digital input module DI 8xDC24V, supports isochrone mode 149 P/F IM151-8PN/DP central processing unit work memory 192KB; 0.06ms/1000 instructions; PROFINET connection; S7 communication (loadable FBs/FCs); PROFINET IO-Controller; supports RT/IRT; PROFINET interface and 3 ports; MRP; PROFINET CBA; PROFINET CBA-Proxy; transport protocol TCP/IP, 150 P/F Communication module with a serial interface (RS232, RS422 or RS485) and Modbus master log with 8 byte I/O interface 151 P/F Communication module with a serial interface (RS232, RS422 or RS485) and Modbus slave log with 8 byte I/O interface 152 P/F Programmable logic controller 1769 TW Digital input module 32 point. 153 P/F Programmable logic controller 1769 Analog input module 8C 0-10V 0-20 154 P/F Programmable logic controller 1769 Digital output module 32 point. 155 P/F Programmable logic controller 1769 Power unit. 156 P/F Programmable logic controller 1769 Compact I/O to DSl module. 157 P/F Programmable logic controller 1769CMPAC Logix processor ethernet 2MB 158 P/F Programmable logic controller 1969 Endcap right. 159 P/F Laser printer Spares for VCB 160 P/F closing coil assembly- 4VC49-110 161 P/F tripping coil assembly- 4VC49-106 162 P/F micro switch 163 P/F breaker auxiliary switch 164 P/F spring charging motor 165 P/F closing shaft with spring. 166 P/F tripping shaft with spring. 167 P/F charging handle assembly 168 P/F pinion gear assembly 169 P/F spur gear assembly 170 P/F bridge rectifier 171 P/F spring for tripping catch 172 P/F tripping catch assembly 173 P/F closing catch assembly 174 P/F driving rod assembly 175 P/F nut assembly 176 P/F cam shaft assembly 177 P/F vacuum interrupter Spares for VC 178 P/F closing coil assembly for VC 179 P/F tripping coil assembly for VC 180 P/F 2 Pole auxiliary switch 181 P/F micro switch 182 P/F bridge rectifier 183 P/F vacuum interrupter 184 P/F contact shroud assembly 185 P/F PDS assembly- 4VC19-0027/01 186 P/F shutter assembly- 3VB79-310/04 187 P/F 5 pole auxiliary switch- J309-022 HT Panel Spares 188 P/F moulded contact shrouds- 1VB79-0009/04 189 P/F shutter assembly- 3VB79-0087/02 190 P/F push button- green button with spring. 191 P/F push button- red button with spring. 192 P/F PDS assembly- with fixing nut bolt- 4VC19- 0027/03 193 P/F insulated stud assembly 194 P/F flexible jumper with fixing bolt- 3VC19-0009 195 P/F coupling 196 P/F bus conductor- upper- 4VC13-0002 197 P/F bus conductor- lower 198 P/F top cover for U barrier- 4VC19-0117/01 199 P/F 16 Pin plug with socket- 4VC46-0303 200 P/F PT fuse 201 P/F voltage transformer (PT) of suitable Ratio secondary 110VAC and suitable class: 202 P/F current transformer (CT) of suitable ratio secodary 5A and suitable class. 203 P/F TNC switch 204 P/F local remote switch 205 P/F PVC shroud- CT/PT/CR surg 206 P/F PVC shroud- 630A 207 P/F contact shroud for PT. 208 P/F rubber gasket for door 209 P/F bushing plate- VCB 210 P/F control fuse with assembly, 440V 211 P/F loose vacuum contactor [Electrically held] type JVE1-604. 212 P/F loose vacuum Contactor for soft starter MVC400D, 400Amp, 3.3KV, 2P, Control supply 220VDC, Solenoid type, with 3 economy resistance- CVC0004, 213 P/F electronic timer suitable in HT starter. 214 P/F Over current, Earth fault relay and short circuit protection relay and retrofitting if required. 215 P/F Under voltage/ Over voltage protection relay and retrofitting if required. 216 P/F Master trip relay and retrofitting if required. 217 P/F Trip circuit supervision relay and retrofitting required. 218 P/F auxillary relay for contact multification RE-300 Aux supply: 110V AC / DC 219 P/F auxiliary contactor for vaccum contactor operation 110VDC with resistor complete. 220 P/F limit switch for service & test position 2 Pole. 221 P/F tripping relay VAJH 3NO + 1NC, 110VDC 222 P/F selector switch for HT panel 223 P/F breaker operated switch 10 pole, 5NO + 5NC. 224 P/F power pack unit Input: 110V AC, Output: 110VDC 225 P/F On line UPS pure sine wave with standard features a 1KVA b 2KVA c 3KVA d 6KVA e 10KVA 226 P/F SMF battery a 12 V/17Ah -18Ah b 12 V/26Ah c 12 V/42Ah d 12 V/65Ah e 12 V/100Ah 227 P/F fixed resistor 1000 ohms. 228 P/F safety switch for VC HRC fuse P/F blow pole 1C/O 229 P/F connecting rods for safety switch 230 P/F safety switch for VC trunk Interlock 2 Pole NO + 1NC.231 P/F high voltage 3.6KV HBC fuse links for short circuit protection. 232 P/F and giving satisfactory test and trials of 3.3 KV 104Kvar Capacitor panel as per rate analysis. 233 P/F and giving satisfactory test and trials of 3.3 KV 208Kvar Capacitor panel as per rate analysis. 234 P/F MM30 type protection relay Machining and fabrication works for couplling of actuator and valve 235 P/F Universal joint 236 P/F Mounting bracket 237 P/F Flange 238 P/F Coupler 239 P/F Shaft coupler 240 P/F Additional shaft 241 P/F Fastener bolt, hardware, etc accessories 242 P/F 0.6mm GI sheet 243 P/F regular/ standard model Ceiling fan complete 244 P/F ISI mark modular type (two module) electronic step regulator for fan 245 P/F condenser 2.5 micro farad for ceiling fan 246 P/F anchor type fastener fan hook, with 2 nos. of 10 mm dia x 75 mm long with necessary materials for ceiling fan. 247 P/F fan clamp of 30 x 5 mm. M.S. flat of required length and 10 mm. M.S. bolt and nuts erected with necessary hook of 10 mm. M.S. round bar and painted. 248 P/F fan hook of 10 mm. M.S. round bar grouted in RCC slab 249 P/F ‘B’ grade G.I. pipe / M.S. pipe down rod duly painted for fan complete erected with PVC three core flexible cable 1 sq. mm copper PVC wire 250 P/F heavy duty exhaust Fan 251 Refilling of fire extinguisher of by dismantling from site to workshop for refilling which includes removing of existing powder and cleaning the cylinder, delivery pipe , nozzle internally and refilling new powder complete with reinstalling properly at site 252 Dismantalling old rusted perforated type cable tray.253 P/F hot dipped galvanized perforated type cable tray manufactured from 16 swg (1.6 mm thick) GI sheet of 100 mm width with necessary coupler plates and hardware in approved manner etc complete. 254 P/F, testing and commissioning split type variable speed Inverter technology room Air conditioning unit 1.5 TR capacity suitable to operate on 250V, 50 cycles, A.C.supply having 1 no of air handling unit hiwall / floor mounting type complete. 255 P/F, testing and commissioning split type variable speed inverter technology room Air conditioning unit 2 TR capacity suitable to operate on 250V, 50 cycles, A.C. supply having 1 no. of air handling unit hi-wall/ floor mounting type complete 256 P/Laying PVC insulated PVC round sheathed 2.5 sq.mm 3 core flexible multi stranded copper Industrial cable for voltage grade up to 1.1 kV 257 P/F copper pipe suitable for refrigeration system having size 12.7 mm complete. 258 P/F bracket for split type AC 259 P/F copper pipe suitable for refrigeration system having size 15.9 mm complete. 260 P/F Elastomeric Nitrile rubber / foam tube type sleeves for over coating and insulating on provided copper pipes having sizes 12 mm 261 P/F Elastomeric Nitrile rubber / foam tube type sleeves for over coating and insulating on provided copper pipes having sizes 16 mm 262 P/F rigid PVC pipe 20 mm dia.with PVC accessories for drain 263 Carrying out core cutting of size 3 to 5 dia x 15 length in the C.C./rock/stone wall with the help of specialized core cutting machine in proper manner and finishing the site as original. 264 Providing, Installation, Testing and commissioning of borewell type maintenance free chemical earthing comprising of Electrode of 80 mm diameter rod of Length 3m along with 25 kg Carbon based environment friendly back fill ground enhancing compound required to fill up the excavated earth with required quantity complete. 265 Providing, Installation, Testing and commissioning of borewell type maintenance free chemical earthing comprising of Electrode of 80 mm diameter rod of Length 1.5m along with 15 kg Carbon based environment friendly back fill ground enhancing compound required to fill up the excavated earth with required quantity complete. 266 Providing and making platform by making excavation for foundation, situ cement concrete of M-10, uncoursed rubble masonry of trap, rubble stone soling 15cm to 20dc thick including hand packing and compacting, situ cement concrete of M20 grade trap, steel bar rainforcement of various diameters for RCC work, sand faced plaster externally in cement mortar, etc complete 267 Providing hand drill Machine 268 Providing hand grinder 269 Providing Crimping tool up to 400sq.mm 270 Providing Insulator tester ( Megger ) cranking type having metal body of range 100 Volts 1000 Ohms 271 Providing fix spanner set 12 piece set 6 -32 mm 272 Providing Bi-hexagon Ring spanner 12 piece set 6 - 32 mm 273 Providing screw driver a Screw driver Engineering pattern 6 X 300 mm b Screw driver Engineering pattern 8 X 200 mm c Screw driver Engineering pattern 5 X 200 mm d Screw driver Engineering pattern 5 X 300 mm e Screw driver with green neon bulb line tester 3.6 X 60 mm 274 Providing Multimeter 275 Providing Tong Tester ( Clip on meter ) of range 0- 10-30-100-1000 Amps and 0-300-600 Volts 276 Providing Ball pen hammer with handle 800 gm 277 Providing Hack saw frame 300 mm size with heavy duty blade 278 Providing blower 279 Providing single phase welding machine 280 P/F fixing isolator suitable for 33KV capacity 281 Providing office regular with handle chair 282 Providing fabricated powder coated rack 283 Providing computer table 284 Providing 18 compartment steel clothes locker with powder coating, locking arrangement, etc complete. 285 Providing regular office wooden table 286 Providing wooden chair 287 Providing and fixing Openable Steel Storage of 750 x 450 x 2100Ht, with 4 adjustable shelves, Complete body & shutter made in 0.8mm thick & Top in 2mm thick CRCA, Shutter to be mounted with the help of cuphinges, and adjustable levelers, enitre storage in powder coated finish with 60 to 80 microns 288 Providing and fixing Openable Steel Storage of 750 x 450 x 1200Ht, with 2 adjustable shelves, Complete body & shutter made in 0.8 mm thick & Top in 2 mm thick CRCA, 2 Shutter to be mounted with the help of cup hinges, and 4 adjustable levelers, enitre storage in powder coated finish 289 Providing & Arrangemnt of High Back chair, Synchronized Mechanism with Multiple Locking, Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery 290 P/F disc type insulator suitable for 33 KV line complete erected with suitable Hardware on provided cross arms as per IS. 291 P/F pin type insulator suitable for 33 KV line, complete erected with suitable hardware on provided cross arms. 292 P/F G.I. stay set for poles, including loop insulators at inaccessible height complete with anchor plate 300 x 300 x 6 mm., straining screws, G.I. stay wire 7/8 SWG, G.I. stay rod 20 mm x 1.8 meter length and pole clamps duly erected in provided cement concrete foundation. 293 Providing and fixing Nut bolts and Sundries etc accessories 294 Making isolation circuit for all 3 phases and interlocking the same to provide 33KV output from 2 Nos of 33KV input feeders using accessories etc complete. 295 Dismantling the existing old 33KV circuits and all jumps, accessories, etc complete. 296 Providing and fixing safe shade ESE type lighting arrestor system complete with following details. a P/F safe shade ESE type lighting arrestor as per NFC17-102 (2011) UNE 211862011 standards, CPRI tested, area covered 107 Mtr, etc complete. b P/F GI mast 5mtr long wth base plate complete c P/F 6 Digit counter, etc complete d P/F accessories for lightning arrestor, etc complete. e P/F test link box etc complete. f Providing, laying and terminating single core 35sq.mm copper flexible cable for earthing 297 Providing and making overhead cablling works for clarifier bridge slipring a P/F slipring b Providing and laying copper conductor 1.5sq.mm X 4 core XLPE/PVC 1.1KV grade cable c P/F hardware, bobbin, anchor fastners, cork sheet etc accessories for slipring fixing works. d P/F GI wire of high purity of different sizes used for earthing. e P/F attachment to slipring for entering cable from top using GI pipes, coupling, flange, bend, by machining and threading the components so that cable will remain fix when clarifier is rotating. f Making arrangement using provided GI wire, bobbins to carry the provided cable overhead from filter to clarifier. g Making terminations for slipring main panel, clarifier panel, etc.Part B- Annual maintenance contract 1 Servicing and overhauling of APFC panels. A Servicing of APFC panel by making terminations of power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, tightening all connections, changing hardware, insulator, gasket, replacing provided blown fuses, fuse base, indicators and other parts as required in engineering manner for each bank complete as follows. a Control feeder for 1 to 5KVAR bank. b Control feeder for 5 to 10KVAR bank. c Control feeder for 10 to 20KVAR bank. d Control feeder for 20 to 30KVAR bank. e Control feeder for 30 to 50KVAR bank. B Servicing of main programmable logic controller injector module, ZCS module, by correcting dry solder, calibrations of three phase voltage, currents, all parameters, power supplies, tightening all connections, adjusting preset values to maintain unity power factor, checking transformer voltages, current ratios, checking of panel & cleaning of panel complete. 2 Servicing and overhauling of soft starters. Servicing of contactor by changing provided contact kits, coil, terminations, control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches, servicing of analog card, digital card, display card, correcting dry solder, calibrations of three phase voltage, currents, all parameters, power supplies, adjusting preset values, checking transformer voltages, current ratios, termination of incoming outgoing cables as required. Also tightening of connections, cleaning of panel complete. a 70 to 90HP. b 90 to 120HP. c 120 to 150HP. d 150 to 215HP. e 215 to 300HP. f 300 to 1000HP 3 Servicing and overhauling of starters. Servicing of contactor by changing provided contact kits, coil, terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, push buttons, voltmeter, ammeter, selector switches checking oil level and top up, auto transformer links, termination of incoming outgoing cables as required. Also tightening of connections, setting of timers and cleaning of panel complete. a 3 to 7.5HP. b 7.5 to 12.5HP. c 12.5 to 20HP. d 20 to 30HP. e 30 to 50HP. f 50 to 70HP. g 70 to 90HP. h 90 to 120HP. i 120 to 150HP. j 150 to 215HP. k 215 to 300HP. 4 Servicing and overhauling of distribution panels. Servicing ,repairing of distribution panels by checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, provided indicators, voltmeter, ammeter, selector switches termination of incoming outgoing cables as required. Cleaning of panel, tightening of all connections of feeders of following capacity. a Up to 32A b 32A to 63A c 63A to 100A d 100A to 150A e 150A to 200A f 200A to 250A g 250A to 400A h 400A to 630A i 630A to 800A j 800A to 1000A k 1000A to 1250A l 1250A to 1600A 5 OCB to MCCB conversion. Dismantling output starter’s cable terminated to OCB, dismantling incoming and outgoing bus bar of OCB to main LT panel, dismantling OCB from main LT panel properly. Making iron frame for fitting of MCCB. Fitting of MCCB in main LT panel with proper hardware, covering the front open portion with 16SWG MS sheet with adjusting slot for MCCB handle. Terminating the R Y B connection of MCCB with main LT panel’s bus bar using appropriate rating of copper flexible cable and proper copper lugs. Reconnect the output’s starter cable to MCCB, taping all power connections, checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches. Replacing indicators and other parts as required. Cleaning of panel, tightening of all connections. 6 Servicing and overhauling of actuator electrical control module. Servicing of actuator electrical control module by servicing of contactor by changing provided contact kits, coil, checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches termination of incoming outgoing cables as required. Replacing blown fuses, fuse base, indicators and other parts as required. Cleaning of panel, tightening of all connections. 7 Callibrating all presets/sensor for gate/screen with open/close and electronic indication system. Checking control wiring for remote and local operation, adjusting limit switches with proper close and open, giving satisfactory test and trials of remote and local system etc complete. 8 Servicing and overhauling of alum mixer control module. Servicing of alum mixer module by servicing of SFU, servicing contactor by changing provided contact kits, coil, checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches termination of incoming outgoing cables as required. Replacing blown fuses, fuse base, indicators and other parts as required. Cleaning of panel, tightening of all connections. 9 Servicing and overhauling of chlorine plant control module. Servicing of chlorine plant module by servicing of SFU, servicing contactor by changing provided contact kits, coil, checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches termination of incoming outgoing cables as required. Replacing blown fuses, fuse base, indicators and other parts as required. Cleaning of panel, tightening of all connections. 10 Servicing and overhauling of clarifier control module. Servicing of clarifier module by servicing of breaker, servicing contactor by changing provided contact kits, coil, checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches termination of incoming outgoing cables as required. Replacing blown fuses, fuse base, indicators and other parts as required. Cleaning of panel, tightening of all connections. 11 Servicing and overhauling of HT substation. a Servicing and overhauling of 4 pole structure, servicing air break switch by polishing contacts, applying jelly to contacts, alignment of AB switch, servicing and overhauling of D.O. set by polishing hansa and punja, applying jelly to all hansa and punja, changing fuse link tightening of connections, changing hardware, changing ACSR jumper links by properly lugging and binding using alkathene pipe. HT taping of connections, checking of insulators, insulation test of total installation and earth test of earthing pits. b Cleaning of substation area, painting of 4 pole structure , fencing and gate using aluminium paint and scraping old paint. Painting of transformers using AD gray paint and scraping old paint. 12 Servicing and overhauling of 33KV H.T. Substation at Gangapur Dam pumping station. a Servicing of air break switch by polishing contacts, applying jelly to contacts, alignment of AB switch, tightening connections, changing hardware, etc complete. b Painting of gantry structure for air break switch by cleaning all poles channels using aluminium paint 3 coats. c Servicing of D.O. set by polishing hansa and punja, applying jelly to hansa and punja, tightening connection, changing hardware and fuse wire, etc complete. d Painting of gantry structure for D.O set by cleaning all poles channels using aluminium paint 3 coats. e Servicing of PT by checking, lugging, tightening HT and earthing connections, checking, tightening secondary connections, measuring voltages at out put for main bus, bus-1 and bus-2. f Painting of gantry structure for main bus PT by cleaning all poles channels using aluminium paint 3 coats. g Painting of gantry structure for PT bus-1 and bus-2 by cleaning all poles channels using aluminium paint 3 coats. h Painting of PT for main bus, bus-1, bus-2 and MSEDCL by cleaning them and using smoke gray paint 3 coats. i Servicing of VCB by checking operating mechanism, alignment, applying jelly to various parts, control wiring, remote local operation, spring charging, insulation tests for main bus, bus-1 and bus-2. j Repairing servicing of control feeder panel for VCB/VC by checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, termination of incoming outgoing cables as required. Cleaning of panel, tightening of all connections etc complete. k Servicing of CT by checking, lugging, tightening HT and earthing connections, checking, tightening secondary connections, measuring currents at out put for main bus, bus-1, bus-2. l Painting of gantry structure for VCB and CT for main bus, bus-1 and bus2 by cleaning all poles channels using aluminium paint 3 coats. m Painting of VCB for main bus, bus-1 and bus-2 by cleaning them and using smoke gray paint 3 coats. n Painting of CT for main bus, bus-1, bus-2 and MSEDCL by cleaning them and using smoke gray paint 3 coats. o Painting of gantry structure for MSEDCL CTPT structure by cleaning all poles channels using aluminium paint 3 coats. p Painting of gantry structure for cut point by cleaning all poles channels using aluminium paint 3 coats. 16 Repairing of analog input module AI 2xI, 4-wire transmitter (+/-20 mA /13 bits+sign, 4 mA to mA/13 bits), standard 17 Repairing of analog input module AI 4xI, 2wire- MU(4..20mA), standard 18 Repairing of digital output module DO 8xDC24V/0.5A, supports isochrone mode 19 Repairing of power module PM-E for electronic modules, 24 VDC, with diagnostics 20 Repairing of digital input module DI 8xDC24V, supports isochrone mode 21 Repairing of IM151-8PN/DP central processing unit work memory 192KB; 0.06ms/1000 instructions; PROFINET connection; S7 communication (loadable FBs/FCs); PROFINET IO-Controller; supports RT/IRT; PROFINET interface and 3 ports; MRP; PROFINET CBA; PROFINET CBA-Proxy; transport protocol TCP/IP, 22 Repairing of Communication module with a serial interface (RS232, RS422 or RS485) and Modbus master log with 8 byte I/O interface 23 Repairing of Communication module with a serial interface (RS232, RS422 or RS485) and Modbus slave log with 8 byte I/O interface 24 Repairing of Programmable logic controller 1769 TW Digital input module 32 point. 25 Repairing of Programmable logic controller 1769 Analog input module 8C 0-10V 0-20 26 Repairing of Programmable logic controller 1769 Digital output module 32 point. 27 Repairing of Programmable logic controller 1769 Power unit. 28 Repairing of Programmable logic controller 1769 Compact I/O to DSl module. 29 Repairing of Programmable logic controller 1769CMPAC Logix processor ethernet 2MB 30 Repairing of Programmable logic controller 1969 Endcap right. 31 Inhouse Programmable logic controller software devlopment charges. 32 On site commissioning of hardware, testing the complete system, terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, termination of control cables as required. Cleaning of panel, tightening of all connections, etc complete. 33 Servicing and overhauling of programmable logic controller panels complete system. Servicing ,repairing of programmable logic controller panels by checking software routine, debugging software, analysing the ladder diagrams, checking hardware and relay module, terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, termination of control cables as required. Cleaning of panel, tightening of all connections, etc complete. 34 Repairing, servicing of electromagnetic flow meter a P/F main kit PCB b P/F single card c Panel weather proof including internal wiring and components d Service charges e Setting and callibration of flow meter 35 Reparing of On line UPS pure sine wave by dismanteling, trasportation and reinstalling after repairing complete. a 1KVA b 2KVA c 3KVA d 6KVA e 10KVA 36 Servicing of DG control panel by servicing of EPU unit, battery charger, setting of timer, making control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware procured from material list like voltmeter, ammeter, selector switches, connector, MCB, indicators, push buttons. Also tightening of connections and cleaning of panel complete. 37 Servicing and overhauling of battery charger panel Servicing and overhaulling of battery charger panel by checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, provided indicators, voltmeter, ammeter, selector switches termination of incoming outgoing cables as required. Cleaning of panel, tightening of all connections, cleaning of battery terminals, checking battery voltages, battery cable lugs, etc complete 38 Servicing of RO/UV/UF water purifier by changing/cleaning of carbon filter, pre filter, sedement filter candles, cleaning of water purifier etc complete. 39 Repairing in point wiring wiring for light fan instrument with ISI mark 2-1sq.mm, copper wire PVC insulated 1.1KV grade with necessary accessories as required complete. 40 Repairing in power point wiring with ISI mark 2-1.5 sq.mm, copper wire PVC insulated 1.1KV grade with necessary accessories as required complete. 41 Repairing of board with necessary accessories as required complete. 42 Installation of transformer with loading, unloading, transportation 43 Carrying out necessary tests before and after charging transformer upto full load to satisfaction by connecting earthing, incomming and outgoing cables etc complete. 44 Providing minor repairs to existing plumbing system. 45 Providing major repairs to existing plumbing system. 46 Tracing out fault in cable/cable kit/cubical, removing the connection of cable, taking insulation test. After fixing new cable/cable kit, making termination of the cable again taking insulation test and giving satisfactory test and trials, etc complete. 47 Dismantalling temporary hangging wires accessories, etc complete. 48 Chiselling of wall for laying cable / mains, clamping it properly and refilling the broken wall by using POP etc complete. 49 Repairing, servicing of synchronization panel by servicing of contactor by changing provided contact kits, coil, servicing of electronic controller, control relays terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, push buttons, voltmeter, ammeter, selector switches, termination of incoming outgoing cables as required. Also tightening of connections and cleaning of panel complete. 50 Annual Maintenance Contract for Power Genset includes routine check-up visits with following scope of work and all breakdown visits including spares and major repairs throughout the year. A 82.5KVA Gangapur Dam Pumping Station B 140KVA Shivaji Nagar WTP. C 250KVA Dwarka Pumping Station D 250KVA Gopalnagar Pumping Station E 400KVA Chehedi Pumping Station F 400KVA Nasikroad WTP. G 400KVA Gandhinagar WTP. H 400KVA Nilgiribag WTP. I 600KVA Panchavati WTP Scope of worka B check kit (oil filter set, fuel filter set) shall be changed as required. b Engine oil 15W40 suitable for genset shall be changed as required. c Air cleaner element shall be changed as required. d Coolant shall be filled and top up as required. e Checking temperature, removing leakages, checking battery voltage, battery charging voltage, output voltage, frequency, AVR, tappet setting for good performance of genset. f Routine checkup visits should be done monthly. g Apart from above scope of work all major works to be carried out including all spares of generator excluding panel, batteries as and when required through out the year except total engine failure, natural disaster like flood etc. 51 Transformer oil filtration 52 Making trench in soft soil for laying provided cable 53 Breaking bituminous/ concreate road by JCB/Tractor breaker complete. 54 Providing and casting in situ cement concrete M-15 / 1:2:4 of trap / granite / quartzite / gneiss metal, moulded or chamfered as per drawing or as directed for coping to plinth or parapet, including centering, form work, compacting, covering newly laid concrete by gunny bag, plastic or tarpaulin, roughening them if special finish is to be provided and curing and finishing if required etc. complete. (The cement mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Wooden planks / shuttering will not be allowed) 55 Providing and laying jointless a highly flexible elastometric coating for RCC / cementitious surface for terrace waterproofing on B.B. Coba / R.C.C, on perfectly clean surface (free from loose dust and foreign matter) application of 1st coat of Polydee- LM @ 700 gms/Square Metre and applying 2nd coat of Polydee-LM @ 700 gms/Square Metre and finishing complete. 56 Repairing, servicing of crane panel by servicing forward/reverse contactor. Checking control wiring, adjusting limit switches, giving satisfactory test and trials of control systems etc complete. 57 Dismantling, disconnecting connections of all cables of ATS starters as fer following details. a Up to 80 HP. b 80HP to 200HP c 200HP to 300HP. 58 Erection of ATS starter panel at desired place including loading unloading and transportation and grouting it properly, etc complete as fer following details a Up to 200 HP. b 200HP to 300HP. 59 Annual Electrical inspection, compliance, test reports of earthing, insulation test etc complete for substation. 60 Annual Maintenance Contract for surge arrestor includes routine checkup visits with following scope of work and all breakdown visits including all spares and major repairs throughout the year etc complete. a Checking of surge arrestor pnumatic system by checking valve, pressure gauge, level gauge, solenoid valve, servicing of surge arrestor tank component, giving test and trials of automatic functioning of magnetic level sensors, checking all pressure etc complete. b Checking of compressor piston ring, gasket, shaft, filter, oil seal, oil ring, discharge valve, inlet valve, oil filling/top up and giving satisfactory test & trials of compressor. i Compressor No-1 ii Compressor No-2 c Checking of control panel for surge arrestor unit by checking terminations, power and control wiring, lugs, tie, saddle, ferrules, bus bars, hardware insulator, gasket, indicators, voltmeter, ammeter, selector switches. Cleaning of panel, tightening of all connections etc complete. 61 Repairing servicing of VCB/VC by checking operating mechanism, alignment of contacts, applying jelly to various parts, tightening all connections, polishing contacts, checking auxiliary contacts, closing coils, terminal strips, VCB/VC operation, insulation tests and giving satisfactory test and trial complete. 62 Repairing servicing of control feeder panel for VCB/VC by checking terminations, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, bus bars, changing hardware insulator, gasket, indicators, termination of incoming outgoing cables as required. Cleaning of panel, tightening of all connections etc complete. 63 Repairing servicing and attending breakdown of CG Lucy unit by checking operating mechanism, alignment of contacts, applying jelly to various parts, tightening all connections, polishing contacts, checking fuses, top up oil level, oil BDV test, CG Lucy operation, insulation tests and giving satisfactory test and trial complete. 64 Servicing of OLTC by checking operating mechanism, alignment, applying jelly to various parts, checking of control panel operations and replacement of provided indicators, switches, control fuses, hardware, insulator, gasket, polishing contacts, power and control wiring using appropriate wire, lugs, tie, saddle, ferrules, termination of incoming outgoing cables as required. Cleaning of panel, tightening of all connections etc complete.