Name of Work: मुजफ्फरनगर में जानसठ रोड़ पर स्थित कैनरा बैक से सहावली नाले तक आर0सी0सी0 नाले का निर्माण कार्य ।
Sl. No.
Item Description
1
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 M lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 M from the foundation trenches. (S.I. No. 251a) /2022
2
Cartage of Ballast, Kankar, Coal, Grit or Sand etc. including loading & unloading but excluding stackings on pucca roads (SI No. 231a/2022) up to 2 km Distance
3
Concrete with 4cm. gauge brick ballast, coarse sand of 2.20 F.M and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion of the work.(SI.No.281/2022)
4
RCC work with cement, approved Coarse sand and 40mm stone grit in proportion of 1:1.5:3 in raft and foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire. (S.I. No. 287a/2022)
5
R.C.C. work with cement approved corsand & 2 cm gauge stone grit in proportion of 1:1.5:3 in slab Excluding supply of reinforcement and its bending, but including its fixing and binding the same waith 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (S.I. No. 284(a)/2022)
6
M.S (Tor steel or plain) work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire (S.I. No. 504/2022) A.R.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.