Fixation Of Rates For On-Site And Workshop-Based In Batote And Banihal Repair Of Damaged Distribution Transformers Of Various Capacities Installed Across The Jurisdiction Of Electric Division, Jpdcl Batote For The Year 2025-26- 1 25 KVA Distribution Transformer (AluminiumWound) 2 Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. 3 Labour Charges fordragging of damagedtransformers from stacing site to work site for detanking/ de-assemblingto acertain the extent of damage. 4 Labour Charges for cleaning of transformer tank, radiators top covers etc. 5 Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any 6 Re-Winding of LV Coil (Aluminium). 7 Winding of LV Leg Coil (Aluminium). 8 Winding of HV Leg Coil (Aluminium). 9 Rewinding of HV leg Coil (Aluminium) 10 Refitting/ Replacement of Bushing only HV/LV 11 Refitting/ Replacement of Bush rod only HV/LV 12 Labour charges for filtration of fresh/old transformer oil 13 Heat Treatment of Transformer HV/LV Coils 14 Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . 15 Labour Charges for testing of transformer 16 Labour Charges for Loading of transformer 17 Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. 18 Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. 19 Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc 20 50/63 KVA Distribution Transformer (AluminiumWound) 21 Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. 22 Labour Charges fordragging of damagedtransformers from stacing site to work site for detanking/ de-assemblingto acertain the extent of damage. 23 Labour Charges for cleaning of transformer tank, radiators top covers etc. 24 Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any 25 Re-Winding of LV Coil (Aluminium). 26 Winding of LV Leg Coil (Aluminium). 27 Winding of HV Leg Coil (Aluminium). 28 Rewinding of HV leg Coil (Aluminium) 29 Refitting/ Replacement of Bushing only HV/LV 30 Refitting/ Replacement of Bush rod only HV/LV 31 Labour charges for filtration of fresh/old transformer oil 32 Heat Treatment of Transformer HV/LV Coils 33 Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . 34 Labour Charges for testing of transformer 35 Labour Charges for Loading of transformer 36 Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. 37 Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. 38 Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc 39 100 KVA Distribution Transformer (AluminiumWound) 40 Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. 41 Labour Charges fordragging of damagedtransformers from stacing site to work site for detanking/ de-assemblingto acertain the extent of damage. 42 Labour Charges for cleaning of transformer tank, radiators top covers etc. 43 Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any 44 Re-Winding of LV Coil (Aluminium). 45 Winding of LV Leg Coil (Aluminium). 46 Winding of HV Leg Coil (Aluminium). 47 Rewinding of HV leg Coil (Aluminium) 48 Refitting/ Replacement of Bushing only HV/LV 49 Refitting/ Replacement of Bush rod only HV/LV 50 Labour charges for filtration of fresh/old transformer oil 51 Heat Treatment of Transformer HV/LV Coils 52 Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . 53 Labour Charges for testing of transformer 54 Labour Charges for Loading of transformer 55 Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. 56 Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. 57 Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc 58 200/250 KVA Distribution Transformer (AluminiumWound/Copper Wound) 59 Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. 60 Labour Charges fordragging of damagedtransformers from stacing site to work site for detanking/ de-assemblingto acertain the extent of damage. 61 Labour Charges for cleaning of transformer tank, radiators top covers etc. 62 Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any 63 Re-Winding of LV Coil (Aluminium/Copper). 64 Winding of LV Leg Coil (Aluminium/copper). 65 Winding of HV Leg Coil (Aluminium/copper). 66 Rewinding of HV leg Coil (Aluminium/Copper) 67 Refitting/ Replacement of Bushing only HV/LV 68 Refitting/ Replacement of Bush rod only HV/LV 69 Labour charges for filtration of fresh/old transformer oil 70 Heat Treatment of Transformer HV/LV Coils 71 Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . 72 Labour Charges for testing of transformer 73 Labour Charges for Loading of transformer 74 Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. 75 Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. 76 Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc 77 400 KVA Distribution Transformer (CopperWound) 78 Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. 79 Labour Charges fordragging of damagedtransformers from stacing site to work site for detanking/ de-assemblingto acertain the extent of damage. 80 Labour Charges for cleaning of transformer tank, radiators top covers etc. 81 Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any 82 Re-Winding of LV Coil (Aluminium/Copper). 83 Winding of LV Leg Coil (Aluminium/copper). 84 Winding of HV Leg Coil (Aluminium/copper). 85 Rewinding of HV leg Coil (Aluminium/Copper) 86 Refitting/ Replacement of Bushing only HV/LV 87 Refitting/ Replacement of Bush rod only HV/LV 88 Labour charges for filtration of fresh/old transformer oil 89 Heat Treatment of Transformer HV/LV Coils 90 Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer . 91 Labour Charges for testing of transformer 92 Labour Charges for Loading of transformer 93 Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc. 94 Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site. 95 Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc 96 Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 25 KVA DTR at site. 97 Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers 98 Dismantling and re-fixing of LV cable circuit of transformer 99 Dismounting of defective transformer from bed 100 Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs 101 Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core 102 Topping with transformer oil after Filtration/ Reconditioning 103 Reconditioning of HV coil (aluminium) 104 Reconditioning of LV coil (aluminium) 105 Winding of HV coil (Aluminium) 106 Winding of LV coil (Aluminium) 107 Replacement of HT/LT Bushing 108 Replacement of HT/LT Bush Rod 109 Mounting of repaired transformer on bed 110 Transportation of material from Divisional workshop Batote to the respective site for first 10 kms 111 Transportation of material for every additional 10 km 112 Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 50/63 KVA DTR at site. 113 Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers 114 Dismantling and re-fixing of LV cable circuit of transformer 115 Dismounting of defective transformer from bed 116 Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs 117 Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core 118 Topping with transformer oil after Filtration/ Reconditioning 119 Reconditioning of HV coil (aluminium) 120 Reconditioning of LV coil (aluminium) 121 Winding of HV coil (Aluminium) 122 Winding of LV coil (Aluminium) 123 Replacement of HT/LT Bushing 124 Replacement of HT/LT Bush Rod 125 Mounting of repaired transformer on bed 126 Transportation of material from Divisional workshop Batote to the respective site for first 10 kms 127 Transportation of material for every additional 10 km 128 Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 100 KVA DTR at site. 129 Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers 130 Dismantling and re-fixing of LV cable circuit of transformer 131 Dismounting of defective transformer from bed 132 Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs 133 Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core 134 Topping with transformer oil after Filtration/ Reconditioning 135 Reconditioning of HV coil (aluminium) 136 Reconditioning of LV coil (aluminium) 137 Winding of HV coil (Aluminium) 138 Winding of LV coil (Aluminium) 139 Replacement of HT/LT Bushing 140 Replacement of HT/LT Bush Rod 141 Mounting of repaired transformer on bed 142 Transportation of material from Divisional workshop Batote to the respective site for first 10 kms 143 Transportation of material for every additional 10 km 144 Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 200/250 KVA DTR at site. 145 Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers 146 Dismantling and re-fixing of LV cable circuit of transformer 147 Dismounting of defective transformer from bed 148 Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs 149 Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core 150 Topping with transformer oil after Filtration/ Reconditioning 151 Reconditioning of HV coil (aluminium) 152 Reconditioning of LV coil (aluminium) 153 Winding of HV coil (Aluminium) 154 Winding of LV coil (Aluminium) 155 Replacement of HT/LT Bushing 156 Replacement of HT/LT Bush Rod 157 Mounting of repaired transformer on bed 158 Transportation of material from Divisional workshop Batote to the respective site for first 10 kms 159 Transportation of material for every additional 10 km 160 Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 400/500/630 KVA DTR at site if required. 161 Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers 162 Dismantling and re-fixing of LV cable circuit of transformer 163 Dismounting of defective transformer from bed 164 Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs 165 Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core 166 Topping with transformer oil after Filtration/ Reconditioning 167 Reconditioning of HV coil (aluminium) 168 Reconditioning of LV coil (aluminium) 169 Winding of HV coil (Aluminium) 170 Winding of LV coil (Aluminium) 171 Replacing of HT/LT damaged Copper Strip with new copper strip 172 Replacement of HT/LT Bushing 173 Replacement of HT/LT Bush Rod 174 Mounting of repaired transformer on bed 175 Transportation of material from Divisional workshop Batote to the respective site for first 10 kms 176 Transportation of material for every additional 10 km