Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Window Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Breakdown Or Deficie.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 By 2 Ton Split Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Breakdown Or Deficienci.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1X5 Ton By 2X5 Ton By 1X5 Point 5 Ton Package Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months, Attending Breakdo.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 40 And 80 And 150 Litres Water Coolers Monthly Tank Cleaning Of Water Coolers Routine Service Once In Two Months Attending Breakdown Or Deficiencies Be.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Deep Freezers And Bottle Cooler And Vertical Freezers Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Def.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 165 And 230 And 300 Litre Refrigerators Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Deficiencies Being .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 11Tr Pacs In Switchyard Control Room Condition Monitoring On Daily Basis, Attending Breakdown Or Deficiencies Being Reported As And When Required Mainte.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Aqua Guard Water Filters Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Deficiencies Being 1 Reported As And.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Hydrogen Coolers 1 Point 5 Ton Capacity Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Deficiencies Being .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 3 Point 0 Ton Cassettes By Duct Able Model Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Bre.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Desert Coolers Breakdown Maintenance As And When Required And Maintenance Of Desert Coolers Once In A Year Including Painting Of Desert Cooler Body Ins.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Cellulose Pad Desert Coolers Breakdown Maintenance As And When Required And Maintenance Of Cellulose Pad Desert Coolers Once In A Year Including Painti.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement Of Cellulose Pad Replacement Of Pad For Cellulose Pad Desert Coolers Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement Of Canvas Joint In Cellulose Pad Desert Coolers Replacement Of Canvas Joint In Cellulose Pad Desert Coolers Detailed Scope Of Work Is Menti.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement Of High Quality Copper Tubing 1 By 4 And 1 By 2 And 3 By 4 And 5 By 8 In 1 Point 5 And 2 Point 0 Air Conditioners As And When Required Dur.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement And Supply Of Complete Cellulose Pad Desert Cooler Body Size Of 1169 Mm H X 915 Mm W X 940 Mm L Any Deviation May Be Plus Minus 20 Mm And.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement And Supply Of Desert Cooler Complete Body Size 902 Mm H X 673 Mm W X 673 Mm L Any Deviation May Be Plus Minus 20 Mm 20 Gauge Body Mate.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Supply And Replacement Of Compressor For 3 Point 5 Ton Cassettes Air Conditioner Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Supply And Replacement Of Compressor For 5 Point 0 Ton Pac Air Conditioner Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached Total.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Window Air Conditioners Removal And Shifting Of Window Type Air Conditioners From One Location To Other At Raps Site Its Installatio.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Split Air Conditions Removal And Shifting Of Split Air Conditioners From One Location To Others At Raps Site Including Installation.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 40 And 80 And 150 Litres Water Coolers Removal And Shifting Of Water Coolers From One Location To Other And Their Installation And Commissioning And Te.. , Repair, Maintenance, And Installation Of Plant/ 2 Total Quantity : Replacement Of Cellulose Pad Replacement Of Pad For Cellulose Pad Desert Coolers Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached Total Quantity 1 Is Equal To 25 For Two Years Total Quantity :