3 Part Differential Cell Counter Able To Print All 18 Parameters And Plt, Rbc & Wbc With Histograms Is Necessary And Included. Must Be A Open Tube, Double Chamber With Minimum Throughput Of 60 Samples Per Hour.Should Be Able To Give Special And Useful Fl
Tender Overview
Project Description
3 Part Differential Cell Counter Able To Print All 18 Parameters And Plt, Rbc & Wbc With Histograms Is Necessary And Included. Must Be A Open Tube, Double Chamber With Minimum Throughput Of 60 Samples Per Hour.Should Be Able To Give Special And Useful Flags E.G. Microcytes, Schizocytes, Eosinophillia Nrbcs Etc.Sample Volume Should Be Less Than 50 Ul For All 18 Parameters Including Pediatric Samples (20 ?Ml For Capillary Blood) Single Button Start Up And Shut Down. Automatic Cleaning Of Samples Probe (Internal & External) Multiple Counting Of Samples Without Extra Cost. Should Have Special Provision To Avoid Sample Carry Over. Must Have Led & Cyanide Free Reagents For Hb Estimation.There Must Not Be A Card System For Reagents Management.Should Be Based On Pressure And Syringe/ Srv Technology.Must Have In Built Thermal Printer.Preferable Be Able To Report Platelet Concentration.Must Have Extensive In Built Qc Programme. The Firm Must Have Their Own Quality Controls And Calibratorsshould Have Built In Microprocessor Controller With Auto Calibration, Self Diagnostic Check Error Codes Display With Auto Alarm.Basic Common Necessities:Two Copies Of Service Manual And Technical Data With All Necessary Passwords Without Any Obligations At The Time Of Installation, Training And Demonstration.Ups Preferably Sine Wave Based With Maintenance Free Batteries With Duration Of Two Hour. Ups Is Necessary And Included.Two Year Technical Support From Manufactures Is Mandatory. Cost Per Test Should Be Given. Cost Of Reagents Should Be Quoted And These Should Be Frozen For Two Years.Cmc For Eight Years.The Quoting Firm Must Have Installed 200 Hematology Instruments All Over Maharashtra And Installed 1500 Hematology Analyzers All Over India. It Should Be Ce & Us Fda Approved Product .
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed