Complete Mechanical Maintenance, Electrical Maintenance, Housekeeping Activities Of Conveyor Streams And Equipments In Cpp-3 And Csp-3 Of Cob-5.; 1 510011252 SHIFT RUNNING MECHANICAL MAINTENANCE OF CPP-3 2,190.000 SH 4,273.00 9,357,870.00 2 510011253 STORE COLLECTION, UPKEEP AND DOCUMENTATION PERTAINING TO MECHANICAL MAINTENANCE OF CPP-3 24.000 MON 53,297.70 1,279,144.80 3 510011254 ARS ASSISTANCE PERTAINING TO MECHANICAL MAINTENANCE OF CPP-3 24.000 MON 51,780.18 1,242,724.32 4 510010230 PPM & INSPECTION - CPP-3 MECHANICAL 24.000 MON 106,619.48 2,558,867.52 5 510010231 RECLAIMING STREAM-1- CPP-3 MECHANICAL 24.000 MON 133,778.33 3,210,679.92 6 510010232 RECLAIMING STREAM-2 - CPP-3 MECHANICAL 24.000 MON 106,619.48 2,558,867.52 7 510010233 FEEDING STREAM-1- CPP-3 MECHANICAL 24.000 MON 82,547.34 1,981,136.16 8 510010234 FEEDING STREAM-2 - CPP-3 MECHANICAL 24.000 MON 106,619.48 2,558,867.52 9 510010235 COAL TOWER STREAMS - CPP-3 MECHANICAL 24.000 MON 165,094.67 3,962,272.08 10 510011255 SHIFT RUNNING MECHANICAL MAINTENANCE OF CSP-3 2,190.000 SH 4,273.00 9,357,870.00 11 510011256 STORE COLLECTION ,UPKEEP AND DOCUMENTATION PERTAINING TO MECHNICAL MAINENANCE OF CSP-3 24.000 SH 53,297.70 1,279,144.80 12 510011257 ARS ASSISTANCE PERTAINING TO MECHNICAL MAINENANCE OF CSP-3 24.000 MON 51,780.18 1,242,724.32 13 510010242 PPM & INSPECTION -CSP-3 MECHANICAL 24.000 MON 165,094.67 3,962,272.08 14 510010243 PATH - A - CSP-3 MECHANICAL 24.000 MON 271,714.15 6,521,139.60 15 510010244 PATH - B - CSP-3 MECHANICAL 24.000 MON 240,397.81 5,769,547.44 16 510010245 COMMON CONVEYORS-CSP-3 MECHANICAL 24.000 MON 216,325.67 5,191,816.08 17 510011258 RUNNING ELECTRICAL MAINTENANCE OF EQUIPMENT IN CPP-3 IN A,B,C SHIFT AS PER THE SCOPE OF WORK. 2,190.000 SH 4,333.10 9,489,489.00 18 510010250 PREVENTIVE MAINTENANCE OF ALL THE ELECTRICAL SYSTEM OF CPP-3 AS PER SCHEDULE & CHECK LIST. 24.000 MON 60,212.07 1,445,089.68 19 510010251 INSPECTION AND CONDITION MONITORING OF ELECTRICAL EQUIPMENT / SYSTEM IN CPP-3. 24.000 MON 60,212.07 1,445,089.68 20 510010252 LIGHTING OF ALL BUILDINGS, CONVEYOR GALLARIES AND PERPHERIAL AREA IN CPP-3. 24.000 MON 84,999.24 2,039,981.76 21 510010253 COMPLETE ELECTRICAL REPAIR & MAINTENANCE OF CPP-3 CONVEYOR STREAMS AND ITS ASSOCIATED MECHANISAM AS PER THE SCOPE OF WORK. 24.000 MON 84,999.24 2,039,981.76 22 510011260 UP-KEEPING OF ELECTRIAL INSTALLATIONS IN CPP-3 AS PER THE SCHEDULE. 24.000 MON 48,964.80 1,175,155.20 23 510011261 RECORD KEEPING PLANNING ACTIVITIES MAINTENANCE SYSTEM etc IN CPP-3 ELECTRICAL. 24.000 MON 27,297.78 655,146.72 24 510011262 UPKEEP OF STORES , ARS AND STORES COLLECTION FOR CPP-3 ELECTRICAL 24.000 MON 48,964.80 1,175,155.20 25 510011259 RUNNING ELECTRICAL MAINTENANCE OF EQUIPMENT IN CSP-3 IN A,B,C SHIFT AS PER THE SCOPE OF WORK. 2,190.000 SH 4,333.10 9,489,489.00 26 510010261 PREVENTIVE MAINTENANCE OF ALL THE ELECTRICAL SYSTEM OF CSP-3 AS PER SCHEDULE & CHECK LIST. 24.000 MON 60,212.07 1,445,089.68 27 510010262 INSPECTION AND CONDITION MONITORING OF ELECTRICAL EQUIPMENT / SYSTEM IN CSP-3. 24.000 MON 60,212.07 1,445,089.68 28 510010263 LIGHTING OF ALL BUILDINGS, CONVEYOR GALLRIES AND PERPHERIAL AREA IN CSP-3. 24.000 MON 84,999.24 2,039,981.76 29 510010264 COMPLETE ELECTRICAL REPAIR & MAINTENANCE OF CSP-3 CONVEYOR STREAMS AND ITS ASSOCIATED MECHANISAM AS PER SCOPE OF WORK. 24.000 MON 84,999.24 2,039,981.76 30 510011263 UP-KEEPING OF ELECTRIAL INSTALLATIONS IN CSP-3 AS PER THE SCHEDULE. 24.000 MON 48,964.80 1,175,155.20 31 510011264 RECORD KEEPING PLANNING ACTIVITIES MAINTENANCE SYSTEM etc IN CSP-3 ELECTRICAL. 24.000 MON 27,297.78 655,146.72 32 510011265 UPKEEP OF STORES , ARS AND STORES COLLECTION FOR CSP-3 ELECTRICAL 24.000 MON 48,964.80 1,175,155.20 33 510011266 GENERAL SHIFT ASSISTANCE IN CPP-3 OPERATION. 24.000 MON 28,815.30 691,567.20 34 510011267 SHIFT ASSISTANCE IN CPP-3 OPERATION. 24.000 MON 353,904.00 8,493,696.00 35 510011268 HOUSE KEEPING OF CPP-3 GROUP-1 JH-C-212 TO C-214. 24.000 MON 97,929.60 2,350,310.40 36 510011269 HOUSE KEEPING OF CPP-3 GROUP-2 JH-C-215 TO C-218 & JH-5 TO JH C-218. 24.000 MON 146,894.40 3,525,465.60 37 510011270 HOUSE KEEPING OF CPP-3 GROUP-3 JH-C-219 TO JH C-220. 24.000 MON 48,964.80 1,175,155.20 38 510011271 SHIFT ASSISTANCE IN CSP-3 OPERATION. 2,190.000 SH 4,509.97 9,876,834.30 39 510011272 HOUSE KEEPING OF GROUP 1 CSP-3 CONVEYORS, CONVEYORS GALLERIES, EQUIPMENTS, BUILDINGS AND ITS PERPHERIAL AREA. 24.000 MON 97,929.60 2,350,310.40 40 510011273 HOUSE KEEPING OF GROUP 2 CSP-3 CONVEYORS, CONVEYORS GALLERIES, EQUIPMENTS, BUILDINGS AND ITS PERPHERIAL AREA. 24.000 MON 122,412.00 2,937,888.00 41 510011274 HOUSE KEEPING OF GROUP 3 CSP-3 CONVEYORS, CONVEYORS GALLERIES, EQUIPMENTS, BUILDINGS AND ITS PERPHERIAL AREA. 24.000 MON 73,447.20 1,762,732.80 42 510011275 HOUSE KEEPING OF GROUP 4 CSP-3 CONVEYORS, CONVEYORS GALLERIES, EQUIPMENTS, BUILDINGS AND ITS PERPHERIAL AREA. 24.000 MON 97,929.60 2,350,310.40 43 510010279 PLANNED PREVENTIVE MAINTENANCE OF DRY DUST EXTRACT SYSTEM & DUST PNEUMATIC TRANSPORT SYSTEMS. 264.000 NO 1,491.16 393,666.24 44 510010280 MAINTENANCE OF DRY DUST EXTRACT SYSTEM & DPT SYSTEM AND ITS AVAILABILITY & PERFORMANCE. 264.000 NO 12,423.17 3,279,716.88 45 510010281 INSPECTION OF DRY DE SYSTEMS AND DPT SYSTEM. 264.000 NO 2,193.61 579,113.04 46 510010282 REPAIR AND LAYING LOW PRESSURE WATER LINES / 200.000 M 544.89 108,978.00 AIR LINES ABOVE DN 100 TO DN 150. 47 510010283 REPAIR AND LAYING LOW PRESSURE WATER LINES / AIR LINES ABOVE DN 60 TO DN 100. 250.000 M 234.99 58,747.50 48 510010284 REPAIR AND LAYING LOW PRESSURE WATER LINES / AIR LINES ABOVE DN 50 TO DN 60. 250.000 M 184.43 46,107.50 49 510010285 REPAIR AND LAYING LOW PRESSURE WATER LINES / AIR LINES UP TO DN 50. 300.000 M 108.31 32,493.00 50 510010286 REPAIR AND LAYING LOW PRESSURE WATER LINES / AIR LINES ABOVE DN 150 TO DN 350. 15.000 TO 12,786.22 191,793.30 51 510010287 DUCT WORK IN CSP-3 DE SYSTEM. 40.000 TO 11,105.74 444,229.60 52 510010288 STRUCTURAL WORK IN CSP-3 DE SYSTEM. 25.000 TO 10,058.06 251,451.50 53 510011276 TECHNOLOGOCAL ASSISTANCE FOR PUMP HOUSE, COMPRESSOR HOUSE AND MONITORING OF DUST UNLOADING IN DE SYSTEM OF COB-5 AND 2T & 3T BUNKERS OF CDCP-5 24.000 MON 150,288.00 3,606,912.00