Tender For Watershed Development Work Tanka 30 Cum. (25 No), Tanka 50 Cum. (03 No), Farm Pond (15 No), Recharge Shaft (02 No) Total 45 Work. - 1 Part-A2 Clearing of forest including cutting of general vegetation and bushes. #rdpr2025-26 @1913 Excavation work of soil by JCB machine/tractor with scraper, breaking of clods, sorting of grass & pebbles and maintaining section/profile of bund (in cut area) including lifting and lowering of the bund upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from 01/02/2017) Unit 1 cubic metre #rdpr2024 @196(a)4 15 cm Dressing of land surface by cutting average soil upto 1.5 m and removing vegetation and small plants and lifting of debris and rubble upto 1.5 m and spreading it upto 50 m distance. #rdpr2025-26 @1(a)5 providing and fixing of 500 micron HDPEPlastic Geomembrane as waterfroofing layerand texured in both side (lining fabric black) . Testing of HDPE Geo membrane should be done as per specifications of GRIGM 13 from independent approved lab.6 Labour charges for laying & spreading of LDPE / HDPE film of 500 micron on bed and sides including jointing etc. complete as per specifications excluding cost of LDPE film and including cost of overlapping and cost of adhesive tape etc. with transportation charges upto work site complete.#WRD BSR#chapter ix itom 417 Excavation of soil upto 1.5 depth in foundation, trench, drain, tamping the bottom, pouring water, dressing the sides, removing excavated soil, filling up the empty spaces with soil again after filling the foundation and disposal of the remaining soil upto a distance of 50 meters # RDPR BSR2025-26#2a8 Foundation and plinth first class brick masonry in cement-gravel 1:6 or 1:8 mixture including closing the side cracks and tamping. Cement mortar 1:6 #rdpr2025-26 @20(a)9 Fencing of 150cm height with iron post 35X35X5mm at 3m distance and 30cm deep in ground Cement concrete 1:3:6 (.30X.30X.60m) corners and every 10th post supported by 35X35X5mm iron post along with black barbed wire in 4 lines, 2 posts including tying and fitting with GI staple wire. Analysis 27 m Length upto fencing, including earthwork (concrete 0.54 mtr) #rdpr2025-26 @195(b)10 Display board ms sheet with angle frame (3x2.5 feet) with paint11 Part-B12 Excavation of soil upto 1.5 mtr in foundation, trench, drain, tamping the bottom, pouring water, beautifying the sides, taking out excavated soil, filling the empty spaces with soil again after filling the foundation and disposal of the remaining soil upto a distance of 50 mtr In normal/soft soil #rdpr2025-26#2a13 0 to 1.5 mtr14 1.5 to 3 mtr15 Above 3 mtr16 Foundation and plinth first class brick masonry in cement-gravel 1:6 or 1:8 mortar Including closing of side cracks and leveling. Cement mortar 1:6 #rdpr2025-26 @20(a)17 50mm thickness cement concrete 1:2:4 mixture consisting of 1 cement 2 gravel 4 stone or brick aggregates of 12 m. including pouring, ramming, compaction and leveling etc. Stone aggregate #14(a)18 Supply of stone lintel and fixing it in the mortar used in masonry. 75 to 100 mm thickness #36(A)19 Laying of stone strips on ground floor, filling of cement 1:6 in joints of parapet and on both sides of strips and 100 mm thick brick grating in cement mixture 1:6 and on top of it waterproof cement concrete with ballast and roof plaster for up to 1.5 m span. In case of grating being done in less thickness than the prescribed thickness, 10% amount of total cost should be deducted for every inch less thickness. RDPR BSR2025-26#59(A)20 Laying of over baked bricks with cement gravel mortar 1:6 in any void, camber and grade and filling joints with cement mortar 1:6 and spreading over bricks. RDPR BSR2025-26#150(B)21 Providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg of VG-40 (30/40) grade and 0.30 Kg/Sqm. Of VG-10 (80/100)grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge.As per Pwd BSR22 Cement plaster on wall in the ratio of 1:4 cement - gravel mixed and after scraping joints and regular watering for 14 days. 20mm think RDPR BSR2025-26#76(b)23 Cement plaster on wall in the ratio of 1:6 cement - gravel mixed and after scraping joints and after regular watering for 14 days. 12mm think #RDPR BSR2025-26#77(c)24 providing and fixing of pvc pipe (2.5kg/cm^2)25 uke iysV] QksVks] fdokM+ o tkyh yxkusgSUMiEi dk dk;Z26 Part-C27 Construction of Tube -well upto 100 meter depth to accommodate housing and assembly pipe in all type of alluvium strata unconsolidated formatin such as pebbles, boulders etc. by percussion/rottary drilling methodas per IS:2800 part 1:1991 and IS 2800 part2 1979(both amended upto date) and technical specification for removal of overburden. The work includes cost of lowering of casing pipe but exclude cost of casing pipe.250mm dia nominal bore.2.2.2as per phed bsr 2022-23/1868-1978/2.8.202228 supply of ERW M.S.black casting pipe ISI marked (IS:4270/2001) or amended upto date of grade Fe 410 of following sizes at site of work.2.10.200mm dia nominal bore.(thinkness of pipe 5.4mm&mass of tube 28.46kg/m) 29 Excavation of soil upto 1.5 depth in foundation, trench, drain, ramming bottom, watering, dressing sides, removing excavated soil, filling up of empty spaces with soil again after filling of foundation and disposal of remaining soil upto a distance of 50 meter In ordinary/soft soil #rdpr2025-26#2a 30 0 to 1.5 mtr 31 1.5 to 3 mtr 32 Foundation and plinth First class brick masonry Cement -gravel 1:6 or 1:8 mortar including closing of side slots and leveling. Cement mortar 1:6 #rdpr2025-26 @20(a) 33 Providing & laying cement concrete circular ring 90cm dia. all complete as per direction of Engineer-in-charge.As per Pwd BSR 34 Cement plaster on wall with cement - gravel mixture in 1:6 ratio including ramming of joints and regular watering for 14 days. 12mm think #RDPR BSR2025-26#77(c) 35 Cement concrete Pouring and supply of reinforced cement concrete of 1:2:4/1:1.5:3 mixture, pressing of roof slabs, eaves, beams, lintels etc., watering and leveling of surface with 1:3 cement mortar etc. including scaffolding but cost of steel and shuttering separately. Ratio 1:1.5:3 RDPR BSR2025-26#13(b) 36 Laying of roof with top quality stone slabs, cement mortar in 1:4 ratio with stone arch in joints at top and bottom Filling of concrete upto 1.5 m span + laying of bolders concrete on top of strip roof with 10 cm high stone pieces of pointed shape in lime-gravel 1:3 mortar or 1:6 cement-gravel mortar and supplying slope in desired direction (3 cm thick mortar). RDPR BSR2025-26#145(a)+46(B)+53(a) 37 providing and fixing of pvc pipe (2.5kg/cm^2) 38 Cutting of galvanized iron pipe fittings, including slotting and fixing of slots! 39 providing and laying bolders concrete 40 uke iysV] QksVks] fdokM+dk dk;Z