}

Bids Are Invited For Visit Charges To Attend Fault Of Dea Set - Visit Charges To Attend Fault Of Dea Set On Call Basis / Complaint Basison Behalf Of Written Job Order From Sde(E) Concerned For Different Te / Bts Sites Under Jurisidication Including A, Jaipur-Rajasthan

Department Of Telecommunications has published Bids Are Invited For Visit Charges To Attend Fault Of Dea Set - Visit Charges To Attend Fault Of Dea Set On Call Basis / Complaint Basison Behalf Of Written Job Order From Sde(E) Concerned For Different Te / Bts Sites Under Jurisidication Including A. Submission Date for this Tender is 29-08-2025. Diesel Generators Tenders in Jaipur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

50556112
Bids Are Invited For Visit Charges To Attend Fault Of Dea Set - Visit Charges To Attend Fault Of Dea Set On Call Basis / Complaint Basison Behalf Of Written Job Order From Sde(E) Concerned For Different Te / Bts Sites Under Jurisidication Including A
Tender
Indian
Rajasthan
Jaipur
29-08-2025

Tender Documents

Tender Details

Bids Are Invited For Visit Charges To Attend Fault Of Dea Set - Visit Charges To Attend Fault Of Dea Set On Call Basis / Complaint Basison Behalf Of Written Job Order From Sde(E) Concerned For Different Te / Bts Sites Under Jurisidication Including Attending The Minor Faults Involving Nomaterial And Submit Detailed Report For Major Faultto The Engineering -In-Charge I/C Fare Charges To Visit The Site From Hq Etc Complete As Reqd. , General Servicing Of The Up To 20 Kva Dea Sets - Pdg & Makingof General Servicing Of The Up To 20 Kva Dea Sets Of Different Make And Model Installed At Te/Bts Sites Comprising Of Following Jobs I/C Fare And Labour Chargei/C Complete Checking Of E/A Set After Servicingand Replacement Of Consumables For Proper Working As Per Manufacturer Recommendations Etc. Complete As Reqd. , General Servicing Of More Than 20 Kva And Upto 32.5 Kva Dea Sets - Pdg & Makingof General Servicing Of The More Than 20 Kva & Upto 32.5 Kva Dea Sets Of Different Make And Model Installed At Te/Bts Sites Comprising Of Following Jobs I/C Fare And Labour Chargei/C Complete Checking Of E/A Set After Servicingand Replacement Of Consumables For Proper Working As Per Manufacturer Recommendations Etc. Complete As Reqd. , General Servicing Of More Than 32.5 Kva And Up To 55 Kva Dea Sets - Pdg & Makingof General Servicing Of The More Than 32.5 Kva & Up To 55 Kva Dea Sets Of Different Make And Model Installed At Te/Bts Sites Comprising Of Following Jobs I/C Fare And Labour Chargei/C Complete Checking Of E/A Set After Servicingand Replacement Of Consumables For Proper Working As Per Manufacturer Recommendations Etc. Complete As Reqd. , Replacement Of Diesel Filter Element Set1 Ltr - Replacement Of Diesel Filter Element Set ( 1 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Oil Filter Element 1 By 2 Ltr - Replacement Of Oil Filter Element ( 1/2 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Oil Filter Element1 Ltr - Replacement Of Oil Filter Element ( 1 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Diesel Filter Element Set1 By 2 Ltr - Replacement Of Oil Filter Element ( 1 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Oil Filter Set Suitable For Ea Set Of 50 To 55 Kva - Replacement Of Oil Filter Set Suitable For E/A Set Of 50/55 Kvain Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Lubricating Oil Multi Grade20w40 - Replacement Of Lubricating Oil Multi Grade ( 20W40) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Steel Wire Braided Fuel Pipe Line - Replacement Of Steel Wire Braided Fuel Pipe Line In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Stop Solenoid12 Volt - Replacement Of Stop Solenoid12 Volt In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Starting Key With Switch - Replacement Of Starting Key With Switch In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Mechanical Type Rpm Cum Hr Meter - Replacement Of Mechanical Type Rpm Cum Hr Meter In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Mechanical Type Rpm Cum Hr Meter Chain - Replacement Of Mechanical Type Rpm Cum Hr Meter Chain In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Battery Leads Red And Black - Replacement Of Battery Leads Red & Black Standard Length & Size I/C Terminals In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Coolant For Radiator Of Superior Quality - Replacement Of Coolant For Radiator Of Superior Quality Or As Recommended By Manufacturer In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of V Belt - Replacement Of V-Belt In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Hose Pipe Setwith Clips - Replacement Of Hose Pipe Setwith Clips In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Techo Drive Unit - Replacement Of Techo Drive Unit In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Fuel Feed Pump Assembly - Replacement Of Fuel Feed Pump Assembly In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Solid State Smps Or Scrbased Battery Chargers - Replacement Of Solid State Smps Or Scrbased Battery Chargers In Existing Different Capacity And Make E/A Set Amf / Manual Controlpanelsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation) , Replacement Of Push Button Switch For Start Or Stop Or Reset - Replacement Of Push Button Switch For Start/ Stop/Reset In Existing Different Capacity And Make E/A Set Amf / Manual Controlpanelsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation) , Replacement Of 12 V Dc Or 220 V Achr Meter Counter Type - Replacement Of 12 V Dc / 220 V Achr Meter Counter Typein Existing Different Capacity And Make E/A Set Amf / Manual Controlpanelsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd.( Note- Make And Model As Per Manufacturer Recommendation) , Supply And Fixing Of 12 Volt Battery Operated Self Starter - Supplying & Fixing Of 12 Volt Battery Operated Self Starter Suitable For Starting Of Enginei/C Fixing The Same On The Dg Set Making Connections Testing Etc. Complete As Reqd. ( Make- Autolek Or Similar Superior Make) , Supplying And Fixing Of 12 Volt Battery Charging Alternator - Supplying & Fixing Of 12 Volt Battery Charging Alternator On The Existing Dg Set I/C Making Connections Testing Etc. Complete As Reqd. ( Make -Autolek Or Similar Superior Make) , Repairingof 12 Volt Battery Chargingalternator - Repairing And Servicing Of The 12 Volt Battery Charging Alternator For Dg Seti/Cgreasing, Oiling, Making Connections Testing Etc. Complete As Reqd. , Repairing And General Servicing Of The Existing Faulty Radiator Up To 55 Kva - Repairing & General Servicing Of The Existing Faulty Radiator Up To 55 Kva Diesel Engine Alternator Set By Repairing Of Leakage And Cleaning Of Copper Tubes With Help Of Cleaning Agents, Dismentling Of Radiatorassemblyincluding Transportation, Brazing And Testing For Leakage And Re-Installation After Repairing The Same Etc. Reqd. , Pdg General Servicing And Repairing Of 12 Volts Engine Starting Self - Pdg General Servicing And Repairing Of 12 Volts Engine Starting Self That I/C Dismentalling Of Equipments, Greasing And Oiling Of Bearing And Other Parts , Cleaning Of Self With Petrol , Replacement Of Carbon Brush ,Housing Etc.Complete Checking Of Self And Testing And Fixing With Proper Alignment With Gears Etc Complete As Reqd. , Dismentalling Of Existing Up To 20 Kva Dea Sets - Dismentalling Of Existing Up To 20 Kva Dea Sets In Sound Proof Canopy Along With All Existing Accessories Including Disconnection Of Cabling, Earthing Strips Etc.Set From Existing Position Of Te / Bts Site Under Ed Jaipuretc. And Reparing Of Any Damage During Dismentling By Making Good The Same Etc. Complete As Reqd. , Dismentalling Of Existing More Than 20 Kva And Upto 55 Kva Dea Sets - Dismentalling Of Existing More Than 20 Kva & Upto 55 Kva Dea Sets In Sound Proof Canopy Along With All Existing Accessories Including Disconnection Of Cabling, Earthing Strips Etc.Set From Existing Position Of Te / Bts Site Under Ed Jaipuretc. And Reparing Of Any Damage During Dismentling By Making Good The Same Etc. Complete As Reqd. , Extra For Shifting Of Existing Dea Set Up To 20 Kva - Extra For Shifting Of Existing Dea Set Up To 20 Kva Capacity From Rooftop Of The Building To Ground Floor / Loading Vehiclewith The Help Of Chain Pulley / Crane By Ensuring Safety To The Existing Construction At Site And Reparing Of Any Damage During Shifting / Dismentling By Making Good The Same Etc. Complete As Reqd. , Loadingof Existing Up To 20 Kva Dea Sets - Loadingof Existing Up To 20 Kva Dea Sets From Ground Floor To Loading Vehicle With The Help Of Chain Pulley / Crane / Man Power Etc. Complete As Reqd. , Loadingof Existing More Than 20 Kva And Upto 55 Kva Dea Sets - Loadingof Existing More Than 20 Kva & Upto 55 Kva Dea Sets From Ground Floor To Loading Vehicle With The Help Of Chain Pulley / Crane / Man Power Etc. Complete As Reqd. , Transportation Ofup To 20 Kva Dea Sets - Transportation Ofup To 20 Kva Dea Sets Along With All Accessories Etcfrom Te / Bts Site Of Ssa Under Ed Jaipur To Store / Any Place In Same Ssa As Directed By Engg. In Charge Bytransport By Truck / Loading Vehicle Etc. Complete As Reqd. , Transportation Ofmore Than 20 Kva And Upto 55 Kva Dea Sets - Transportation Ofmore Than 20 Kva & Upto 55 Kva Dea Sets Along With All Accessories Etcfrom Te / Bts Site Of Ssa Under Ed Jaipur To Store / Any Place In Same Ssa As Directed By Engg. In Charge Bytransport By Truck / Loading Vehicle Etc. Complete As Reqd. , Unloadingup To 20 Kva Dea Sets - Unloadingofexisting Dea Sets Of Up To 20 Kva Dea Sets From Loading Vehicle To Place Of Shifting / Store Along With All Accessories Etc As Directed By Engg. In Charge With The Help Of Chain Pulley / Crane / Man Power Etc. Complete As Reqd. , Unloadingmore Than 20 Kva And Upto 55 Kva Dea - Unloadingofexisting Dea Sets Of More Than 20 Kva & Upto 55 Kva Dea From Loading Vehicle To Place Of Shifting / Store Along With All Accessories Etc As Directed By Engg. In Charge With The Help Of Chain Pulley / Crane / Man Power Etc. Complete As Reqd. , Itc Of Up To 20 Kva Dea Sets On Existing Foundation - Installation, Testing And Commissioningofexisting Dea Sets Of Up To 20 Kva Dea Sets On Existing Foundation / Floor At Site Along With Canopy & All Other Accessories I/C Making Connections,Power And Control Cable, Earthing Connections Etc. Complete As Per Requirement At Site. , Itc Of More Than 20 Kva And Upto 55 Kva Dea - Installation, Testing And Commissioningofexisting Dea Sets Of More Than 20 Kva & Upto 55 Kva Dea On Existing Foundation / Floor At Site Along With Canopy & All Other Accessories I/C Making Connections,Power And Control Cable, Earthing Connections Etc. Complete As Per Requirement At Site. , Labour Charges Fortop Overhauling Of Existingdea Setsup To 20 Kva - Labour Charges For Top Overhauling Of Existing Dea Sets Up To 20 Kva Capacity I/C Dismentalling Of All Parts, Radiator Cleaning, Replacement Of Engine Oil Coolant, Replacement Of Belts Safties, Meters If Reqd And Calibration Of Engine As Per Manufaturer Reccommendations. , Replacement Of The Liner Assembly With Rubber Ringdea Sets Up To 20 Kva - Replacement Of The Liner Assembly With Rubber Ring In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts, Testing Etc As Reqd. , Replacement Of The Piston Setwithout Piston Ring Set Dea Sets Up To 20 Kva - Replacement Of The Piston Setwithout Piston Ring Set In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Piston Ring Set Dea Sets Up To 20 Kva - Replacement Of Thepiston Ring Set In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Set Ofgasket Including Head Gasket Dea Sets Up To 20 Kva - Replacement Of The Set Ofgasket I/C Head Gasket In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The O Ring Set Dea Sets Up To 20 Kva - Replacement Of The O Ring Set In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Cr Bearing Dea Sets Up To 20 Kva - Replacement Of Thecr Bearing In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Main Bearing Dea Sets Up To 20 Kva - Replacement Of The Main Bearing In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Oil Pressure Guage Dea Sets Up To 20 Kva - Replacement Of The Oil Pressure Guage In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Front Oil Seal Of Crank Shaft Dea Sets Up To 20 Kva - Replacement Of The Front Oil Seal ( Crank Shaft ) In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Back Oil Seal Of Crank Shaft Dea Sets Up To 20 Kva - Replacement Of The Back Oil Seal ( Crank Shaft ) In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Labour Charges Fortop Overhauling Of More Than 20 Kva And Upto 55 Kva - Labour Charges For Top Overhauling Of Existing Dea Setsmore Than 20 Kva And Upto 55 Kva Capacityi/C Dismentalling Of All Parts, Radiator Cleaning, Replacement Of Engine Oil Coolant, Replacement Of Belts Safties, Meters If Reqd And Calibration Of Engine As Per Manufaturer Reccommendations. , Replacement Of The Liner Assembly With Rubber Ringdea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The Liner Assembly With Rubber Ringin Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Piston Setwithout Piston Ring Set Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The Piston Setwithout Piston Ring Set In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Piston Ring Set Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of Thepiston Ring Set In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Set Of Gasket And Head Gasket Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The Set Ofgasket I/C Head Gasket In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The O Ring Set Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The O Ring Set In Existing Dea Sets More Than 20 Kva & Upto 55 Kvacapacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Cr Bearing Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of Thecr Bearing In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Main Bearing Dea Setsmore Than 20 Kva And Upto 55 Kva - Replacement Of The Main Bearing In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Oil Pressure Guage Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The Oil Pressure Guage In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Front Oil Seal Of Crank Shaft Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The Front Oil Seal ( Crank Shaft ) In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Back Oil Seal Of Crank Shaft Dea Sets More Than 20 Kva And Upto 55 Kva - Replacement Of The Back Oil Seal ( Crank Shaft ) In Existing Dea Sets More Than 20 Kva & Upto 55 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendationsi/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Repairing Of Cylinder Head - Repairing Of Cylinder Head ( One Job For Each Head ) With Replacement Of Valve Seat, Valve Guide,Valves Andstamp Seali/C Grinding , Lapping Of Valves I/C Turning, Grinding Of Head Etc Complete As Reqd. , Repairing Of Up To 20 Kva Dea Sets Crank Shaft - Repairing Of Up To 20 Kva Dea Sets Crank Shaft I/C Grinding, Lapping, Bushing, Allignement Etc Complete As Reqd. , Repairing Of More Than 20 Kva And Upto 55 Kva Dea Sets Crank Shaft - Repairing Of More Than 20 Kva & Upto 55 Kva Dea Sets Crank Shaft I/C Grinding, Lapping, Bushing, Allignement Etc Complete As Reqd. , Transportation Charges Up To 50 Km For Alternator Up To 55 Kva - Transportation Charges Up To 50 Km For Alternator Ofvarious Capacity Up To 55 Kva From Site To The Nearest Workshop & Back After Repairing I/C Dismentling, Loading, Unloading, Transportation, Safe Handling & I/C Reinstallation Etc. And Testing On Existing Load For At Least One Hour After Commissioning Of The Alternator Etc. Complete As Reqd. , Transportation Charges More Than 51 To 100 Km For Alternator Up To 55 Kva - Transportation Charges More Than 51 To 100 Km For Alternator Ofvarious Capacity Up To 55 Kva From Site To The Nearest Workshop & Back After Repairing I/C Dismentling, Loading, Unloading, Transportation, Safe Handling & I/C Reinstallation Etc. And Testing On Existing Load For At Least One Hour After Commissioning Of The Alternator Etc. Complete As Reqd. , Rewinding Of Main Stator Winding Of Alternator Up To 20 Kva - Rewinding Of Main Stator Winding Of Alternator Capacity Up To 20 Kva Of Existingfaulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Rewinding Of Main Rotor Winding Of Alternator Up To 20Kva - Rewinding Of Main Rotor Winding Of Alternator Capacity Up To 20 Kva Of Existingfaulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Rewinding Of Main Stator Winding Of Alternator More Than 20 Kva And Upto 55 Kva - Rewinding Of Main Stator Winding Of Alternator Capacity More Than 20 Kva & Upto 55 Kva Of Existingfaulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Rewinding Of Main Rotor Winding Of Alternator More Than 20 Kva And Upto 55 Kva - Rewinding Of Main Rotor Winding Of Alternator Capacity More Than 20 Kva & Upto 55 Kva Of Existingfaulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Exciter Stator Winding Of Alternator Up To 55 Kva - Rewinding Of Exciter Stator Winding Of Alternator Capacity Up To 55 Kva Of Existingfaulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Exciter Rotor Winding Of Alternator Up To 55 Kva - Rewinding Of Exciter Rotor Winding Of Alternator Capacity Up To 55 Kva Of Existingfaulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Replacement Or Repairing Of Avr - Replacement / Repairing Of Avr Make National Or S.S. For Existing Faulty Alteranatorupto 55 Kva Capacityi/C Dismentling The Faulty Item, Replacement By New One I/C Fixing, Testing, Commissioning Etc. Complete As Reqd. , Replacement Or Repairing Of Power Diode For Rotating Rectifier Assembly - Replacement / Repairing Of Power Diode For Rotating Rectifier Assembly For Existing Faulty Alteranatorupto 55 Kva Capacityi/C Dismentling The Faulty Item, Replacement By New One I/C Fixing, Testing, Commissioning Etc. Complete As Reqd. , Replacement Or Repairing Of Bearing Suitable For Above 20 Kva Alternator - Replacement / Repairing Of Bearing Suitable For Above 20 Kva Alternator For Existing Faulty Alteranatorupto 55 Kva Capacityi/C Dismentling The Faulty Item, Replacement By New One I/C Fixing, Testing, Commissioning Etc. Complete As Reqd. , Providing Of 2 Core 16 Sqmm - Providing Of 2 Core 16 Sqmm Pvc Insulated And Pvc Sheathed Aluminium Conductor Armoured Cable Of 1.1 Kv Grade Confirming To Relevent Is-Specification Complete As Reqd. ( Note - Cable Shall Be Provided At Site / Handed Over To Ssa Authority As Per Direction Of Engg. In Charge ) , Providing Of 4 Core 16 Sqmm - Providing Of 4 Core 16 Sqmm Pvc Insulated And Pvc Sheathed Aluminium Conductor Armoured Cable Of 1.1 Kv Grade Confirming To Relevent Is-Specification Complete As Reqd. ( Note - Cable Shall Be Provided At Site / Handed Over To Ssa Authority As Per Direction Of Engg. In Charge ) , Layingofonenumber Upto 35 Sq. Mm On Wall Surface - Layingandfixingofonenumber Upto 35 Sq. Mm (Clamped With 1Mm Thick Saddle) Pvcinsulatedandpvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Wall Surface As Required. , Layingofonenumber Upto 35 Sq. Mm Direct In Ground - Laying Of One Number Upto 35 Sq. Mm Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size Direct In Ground Including Excavation, Sand Cushioning, Protective Covering And Refilling The Trench Etc. As Required. , Laying Ofonenumber Upto 35 Sq. Mmin The Existing Rcc Or Hume Or Metal Pipe - Laying Of One Number Upto 35 Sq. Mm Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size In The Existing Rcc/ Hume/ Metal Pipe As Required. , Supply And Making End Termination For 2 X 10 Sq. Mm 19 Mm - Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For 2 X 10 Sq. Mm (19 Mm) For Pvc Insulated And Pvc Sheathed/Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required. , Supply And Making End Termination For 4 X 16 Sq. Mm 28Mm - Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For 4 X 16 Sq. Mm (28Mm) For Pvc Insulated And Pvc Sheathed/Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required. , Providing And Fixing 6 Swg Dia G.I. Wire - Providing And Fixing 6 Swg Dia G.I. Wire On Surface Or In Recess For Loop Earthing Along With Existing Surface/ Recessed Conduit/Submain Wiring/ Cable As Required. , Sitc Of32 Amps Four Poleonload Side Handle Operated Change Over Switch - Sitc Of32 Amps Four Poleonload Side Handle Operated Change Over Switchinsteel Enclosure Capable Ofworking 415/500 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. , Sitc Of63 Amps 2 Pole On Load Side Handle Operated Change Over Switch - Sitc Of63 Amps 2 Pole On Load Side Handle Operated Change Over Switchinsteel Enclosure Capable Ofworking 240 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. , Sitc Of63 Amps Four Pole Onload Side Handle Operated Change Over Switch - Sitc Of63 Amps Four Pole Onload Side Handle Operated Change Over Switchinsteel Enclosure Capable Ofworking 415/500 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. , Providing And Fixing 63 Amp Tpn Disconnector Fuse Switch Unit - Providing And Fixing 63 A Tpn Disconnector Fuse Switch Unit In Sheetsteel Enclosurea/Whrc Fuses Capable Ofworking 415/500 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. Total Quantity : 5339

Key Value

Document Fees
Refer document
EMD
INR 57275.0 /-
Tender Value
INR 28.63 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail