renovation Of Inlet Valves In Filter House And Scour System Of Clarifiers Of 2Nd 40Mgd Plant At Wazirabad Water Works. (Re-Invite) , Dismantling Of Inlet Gate With Its Related Mechanical Parts Like Guider Of Side, Flap, Spindle, And Other Items After Cutting Of All Rusted Nut Bolts With The Help Of Gas Cutter And Take Out The Gate With The Help Of Manual Labour And Material Handling Equipments. , Removing Of Old G.M. Ring And Making Of Seat For Fixing Of New G.M. Ring. The Job Includes Fitting Of New Ring And Machining For Polishing Cut. , Casting / Machining Of G.M. Ring As Per Sample. , Fabrication / Supply Of S.S. Spindle Of Size 50Mm Round Dia. And 900 Mm Long Alongwith G.M Nut. , Fabrication / Supply Of M.S. Coupler Of Size 80Mm Outer Dia And Making The Bore On Both Sides As Per Size Of Spindle. Making Holes Of Size 16Mm On Both Side Of Coupler For Fixing Of Pin. This Includes Machining Charge, Drilling And Grinding Charge. , Fabrication/Supply Of M.S. Housing Of En31 Material Of Size 175Mm Outer Dia., 75Mm Inner Dia. And About 600Mm Long. Making Of Seat For Fixing Of G.M. Bush At Both Side In Housing As Per Outer Dia. Of G.M. Bush. The Job Includes Casting / Machining Of G.M. Bush, Machining Charge, Fixing Of Pinion Shaft With 2 Nos. Bush. , Fabrication / Fixing Of Bevel Gear, Pinion Gear And Shaft By Casting And Machining And Making Bush Seat On Both Side Of The Shaft As Per Inner Dia Of Bush And Making The Key Way For Fixing Of Pinion Gear. , Repairing Of Both Guiders By Machining For Polishing Cut. The Job Includes Making Seat Of Guiders With Proper Alignment By Safer Machine And Grinding Machine. , Supply Of Nut Bolts As Per Site Requirement. , Supply Of Gm Square Bar Of Size 2.5X2 & 3X4Of Length 1 Meter Each For Gm Nut Making. , Supply Of Gun Metal Washer Of Good Quality As Per Direction Of Engineer Incharge. , Fixing Of Gate With Guiders And Its Other Related Dismantling Parts And Fabricated New Parts With The Help Of Necessary Tools & Tackles And Heavy Manual Labour And Material Handling Equipments. This Includes The Charge Of Miner Civil Work With Required Material.Also, Painting Of The Inlet Gate With Required Shade. , Transport Charges Of Repairable Materials And Fabricated New Parts, Tools & Tackles To & Fro. , Testing & Commissioning Of Inlet Gate For Any Leakages On Full Flow Of Water. , A: - Renovation Of Telescope Scouring Systemdismantling Of Upper Stand Of Telescope Scouring System Of Clarifier After Cutting/Opening Of Foundation Of Stand & Removing Of Bearing System From Top Taking Out Wheel From The Spindle Etc. , Safety Equipments Have To Be Arranged For The Workers As The Work Has To Be Done In The Telescope Scour Chamber. The Same Includes Loading, Unloading & Cartage Charges Etc. , Dismantling Of Existing Transmission System Responsible For Upward & Downward Movement Of Upper M.S Pipe Over The Ms Cup Shaped Pipe For Replacing Of Its Damaged Parts From The Telescope Scour Chamber By Going Down In The Telescope Scour Chamber With All Safety Measures. , Fabrication Of New M.S Pipe Of Approx. Size 1050Mm Long, 300Mm Dia & 8 Mm Thick. The Job Includes Making Provision For Smooth Flow Of Water From The Top Of Telescopic Pipe By Welding Of U-Channel On Top Of Pipe As Per Site Requirement. , Fabrication Of New Hanging Support Made Out From Ms Flat As Per Existing Design & Shape. , Making Fabrication Of New Threaded Spindle Made Out Of Ss304. The Size Of Spindle Is 1575Mm Long, 25Mm Dia Duly Threaded And Cutting Of Groove For Locking System In The Bracket For Free Movement Of Driving Wheel. , Making Fabrication Of M.S/C.I Wheel Along With G.M Nut Duly Threaded As Per Spindle Thread & Fixed In The Wheel For Smooth Functioning Of Telescopic Spindle. , Replacement Of Existing Damaged Angle/Channel From The Top Of Telescopic System Including Breaking Of Side Walls For Taking Out Existing One And Grouting Of New One For Tightening Of Holding Bracket Of Telescopic Spindle. , Making Fabrication Of Holding Arrangement For Operating Wheel & Spindle For Fixing On Top Of Telescopic System. , Replacement Of M.S/C.I Flange From The Top Of Existing Fixed Pipe Of Telescopic System Along With Rubber Sheet & Nut Bolts To Avoid Leakage From Inside The Pipe. , Making Fabrication Of New Ms Jall On The Top Of Telescope Chamber. The Dimension Of Jall Is 1050Mm X 2100Mm, Size Of Angle Across The Border 2” X 2” X 6Mm, Size Of Size Of M.S.Flat Is 40Mm X6 Mm. The Gap Between Two Consecutive M.S.Flat Should Not Be More Than 40Mm. The New Ms Jall Will Have A Provision For Flexible Window, Using Angle Of 2” X2 ” X 6Mm To Be Welded With Its Border.The Job Includes Required Minor Civil Work For Repairing Of Damaged Wall Of Telescope Chamber & Fixing Of Ms Jall Etc Includes Painting The Whole Jall With Black Enamel Paint. , Assembling & Fixing Charges Of All The Items Of Telescopic System Including Rectified Transmission System Responsible For Upward & Downward Movement Of Ms Pipe, Fixing Of Top Stand Of The Regulating System With Holding Bracket & Wheel Complete In All Respect. , B: - Renovation Of Scour Valve Regulating System Dismantling Of Upper Cone Of Sluice Valves Spindle After Removing Of Wheel From The Extended Spindle & Cutting Of Foundation Bolts Of C.I Taper Cone/ Brackets. , Working Platform Arrangement At Site Of Work This Includes Such As Plates, Balli, Jacks, Chain Block, Chains Etc To & Fro And Its Loading & Unloading Complete & Its Dismantling After Completion Of Work. , Going Down In The Scour Valve Chamber & Dismantling Of Existing Holding Systems Of Extended Shafts Removing Of Couplers From The Shaft, Removing Of Existing Brackets From The Shafts By Cutting Of Nut Bolts With The Help Of Gas Cutter Etc. , Cutting The Nut Bolts Of All The Flanges In Scour Chamber & Taking Out Complete Sluice Valve, Pipe & Other Specials With The Help Of Tri Pod Chain Block Arrangement & Heavy Labour Manual Arrangement For Taking Out All The Accessories From The Deep Scour Chamber. , Cutting The Nut Bolts Of All The Flanges Of Telescopic Pipe By Going Down In Telescopic Chamber & Taking Out Complete Pipe Line From The Chamber With The Help Of Tri Pod Chain Block Arrangement & Heavy Labour Manual Arrangement. , Cutting Of Bifurcation Wall Deep Inside The Scour & Telescopic Chamber For Taking Out The Damaged Bend Which Is Fixed In Between The Wall. Cutting Of Wall With The Help Of Electric Hammer & Manual Labour Arrangement. Taking Out The Waste & Damaged Bend From The Chamber. , Repairing Of Double Flange Non Rising Spindle Sluice Valve Of Size 250Mm. , Supply Of M.S.Pipe Of Size 250Mm Dia. 8Mm Thick. Make - Jindal/Tata , Supply Of M.S. Long Bend Of Size 250Mm Dia C-Class. , Supply Of M.S. Tee Of Size 250Mm C-Class. , Supply Of M.S.Flange For 250Mm Dia Pipe. , Repairing Of Double Flange Non Rising Spindle Sluice Valve Of Size 100Mm. , Supply Of M.S.Pipe Of Size 100Mm Dia C-Class. Make - Jindal/Tata , Supply Of M.S.Bend Of Size 100Mm Dia C-Class. , Supply Of M.S.Flange For 100Mm Dia Pipe. , Fabrication Charges Of M.S.Pipe Gap Pieces Of Different Sizes As Per Site Requirement By Welding Of Flanges In The Pipe For Fixing Of Sluice Valves & Other Specials In The Pipe Line Etc. , Fixing Charges Of M.S.Pipe & Specials In The Deep Scour Chamber By Fixing Of New Nut Bolts & Rubber Packing Sheet After Taking Down Sluice Valves & Other Accessories In The Deep Scour Chamber. , Fixing Charges Of Existing Telescopic Pipe Line After Fixing Of New Bend In The Telescopic Pipe Line In Place Of Damaged One. , Primer & Painting On Complete Pipe Line Includes New & Existing With Synthetic Enamel Paint.Make-Asian/Berger/Nerolac. , Making Fabrication Of Extended Spindle Of Size 6Mtr Long 40Mm Dia. , Making Fabrication Of Coupler For Joining Of Extended Spindle With Sluice Valve Spindle. , Making Fabrication Of Bracket Holders For Giving Support To The Extended Spindles. The Job Includes Fixing Of Brackets On The Scour Wall With The Help Of Heavy-Duty Fasteners. Fixing Of Ms Angle Support With The Wall For Holding Of Bracket For Free Movement Of Extended Spindle. , Required Civil Work For Repairing Of Broken Wall After Fixing Of Complete Pipe Line, Bend & Specials. The Job Includes Waterproofing The Same With Chemicals Etc. , Testing Of Complete System On Load. Job Also Includes To & Fro Transportation Of Tools & Tackles.