Tender For Providing Paver Block Road And Construction Of Compound Wall At Athanur Briyal Ground At Peravurani Town Panchayat.; 1 Boring, providing and installing Bored cast-in-situ reinforced cement Concrete pile of specified diametre and length below the pile cap in cement concrete 1 :1.5:3 ( 1 cement, 1 .5 Coarse sand,& 3 graded stone aggregate of 20 mm nominal size) to than specified excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour charges etc., complete. as per standard specification. 300mm Dia TNBP No. 23, & 30 2 Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24).- 1 M3 3 Supplying and Fillingin foundation and basement with Filling STONE DUST in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25). 4 PlainCement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers (TNBP No.28). 5 Vibrated Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) - Foundation and basement 6 Above basement 7 Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 - Without Strutting 8 Column 9 Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complyingwith standard specifications and as directed by the deparmental engineers. TNBP No:30 10 Plain Cement Concrete 1:3:6 (one cement, threeM Sand, six aggregate) using 40mm gauge handbroken granite stone jellyincluding laying to the required thickness and finising the top smooth etc., complete 11 Providing and laying of Rubberized Paver block 80 mm thick High Strength type of interlocking pavement block in required size of minimum comperesive strength of 40 N/mm2 in Uniform Shape at approved make to be laid in curring bone pattern with approved non sticking surface in top and the rate including leveling the base preparation of subbase with the Stone Dust cushion 100 mm thick laying out the cut pieces to fit the edge vibrating the paver sweeping transporting loading , un loadingand laying the Paver block etc Completed. as per Standard Specification. 12 Brick Work in CM 1:5 (One part of cement & five parts of M-sand) mix using Third Class Country Brick Kiln Burnt bricks 8 ¾ x 4 ¼ x 2 ¾ including cost and conveyance of materialsto work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers –TNBP No:31 - Aove basement 13 Plastering with CM 1:5(One part of cement & five parts of P-sand) mix for 12mm thick including cost and conveyance of all materialsto work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:56&57 14 Painting two coats with ready mixed Plastic Emulsion Paint S.I.358 Plastic emulison paint ofapproved quality and colour over a priming coat, including thoroughscraping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:66-A.