| 1 | Earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (SS 20 B) etc., complete as per standard specification - 1m3 For Drainage |
| 2 | Plain Cement Concrete 1:4:8 (One Part of cement, Four Part of sand, andEight Part of Aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete.as per standard specification 28 V,VI S25 |
| 3 | Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side wallsincluding cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete.asper standard specification 86K, 86A |
| 4 | Supplying and fillingwith approved quality of well Gravel in layers of 15cm thick well rammed and consolidated as per standard specification. |
| 5 | Vibrated Plain Cement Concrete 1:2:4 (One Part of cement, TwoPart ofsand, Four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete.as per standard specification 28 V,VI S25 |
| 6 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. |
| 7 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. |
| 8 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications.(Using Vibrator)TNDSS NO: 30 V, VI (S3), VII-3. |
| 9 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best countryBricks of size 8 ¾”x 4 ¼”x 2 ¾”from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. |
| 10 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers56 & 57 |
| 11 | PlasteringinC.M. 1 : 5 (onecement fivesand)to12 mmthickincludingallcostandconveyanceofallmaterials tositeincludingcostofcementwhichwillbepurchasedlocallybythecontractor and conveyanceofthesametotheactualworksiteandcostformworkincludingwatering curingandallleadsofgoodpotablewaterandallother. 56 & 57 |
| 12 | Painting the new plastered walls with two coats of Exterior emulsion paint (weather proof ) first class quality and of approved colour over a priming coat including thorough scrapping clean removal of dirt etc. complete and including necessary plaster paris putty etc. wherever required.as per (ISI STD) (It mustprovide excellent resistance against the growth of algae and fungi on the walls. And it must offer excellent protection against alkali and UV degradation and the durability period should be 5 years. 61 V, VI (S4) 3. |
| 13 | Floor Finishing First Quality Design Ceramic tiles of All colours of sizes 305mm x 305mm x 6mm. laid in cm 1:3 mix 10mm thick and pointing with white cement using 0.4kg/sqm including finishing the joint and pointing flush with tiles surface etc complete |
| 14 | Supplying and fixing of M.S grill of approved design for doors, windows and ventilators using necessary mild steel flats for inner and outer memebers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. |
| 15 | Dadooing the walls with glazed tiles of 30 c.m x 20 c.m 6mm size laid in cement mortor 1:2 mix 10mm thick and pointing with 0.40 kg white cement per m2 etc. |
| 16 | Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm \"P\" or \"S\" trap connecting with CI pipe of 100mm dia / PVC pipe of 110mm dia, double flapped rigid PVC black seat and seat cover with CP brass hinges including cost of white cement, cement for packing, spun yarn, teak wood plugs, brass screws, etc., including supplying and fixing 10 litres capacity PVC / 12.5 litres capacity porcelin low level flushing tank with a pair of CI brackets, etc., complete with all fittings such as 15mm brass ball valve with polythene float with brass handle, union, coupling connected by means of 40mm white PVC flush hand using Indian adopter joint including all internal fittings..... |
| 17 | Supplying and fixing in positon Indian Water Closet (Oriya type) of size 580 x 440mm white glazed earthern ware of approved quality and brand with \"P\" or \"S\" trap conforming to BIS with sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and finishing the top to the required slope and including giving necessary connection to PVC pipes (including the cost of 110mm dia CI pipe for a length of 600mm) by dismantling brick masonry wall / reinforced cement concrete roof / floor slab and making good the dismantled portion to the original condition with leakages etc., complete complying with standard specifications and as directed by the departmental officers.(The water closet should be got approved by the Executive Engineer before use on works). |
| 18 | Painting Two coats over the new iron work using ready mixed enamel paint including cost of all materials to site and all labour charges for mixing applying etc., Complete as per Standard Specifications |
| 19 | Supply and delivery ofFollowing UPVC pipes and Specials from Borewell to HDPE tanklaying below ground level and above Ground level and HDPE tank to Toilet . 32mm PVC.Pipe |
| 20 | 20mm PVC.Pipe |
| 21 | Brass chromium plated screw down tape heavy type 15mm |
| 22 | 110mm Pvc Pipe |
| 23 | Wiring with 2x1.5 sq.mm p v c insulated SC.Cu. Conductor of 1100V grade in suiotable p v c rigd pipe on wall and ceilingwith p v c accessories with TW switch box in flush painting of suitable colour for open p v c light point (SD-17) |
| 24 | Wiring with 2 x 1.5 sqmm (22 /0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 x 100 x 113 mm TW switch box with 3mm hylum sheet cover for5A 3 pin non inter locking CS plug with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point.etc, complete as per standard specificationsSD 36 |
| 25 | Supply and fixing of 30W LED Street Light Fitting with LED street light fitting with all acessories etc..complete |
| 26 | supply and fixing of 20W 4 Feet LED Fitting with LED with all acessories etc..complete |