Tender For Strengthening At Km 2/500-4/4 Of Keelakalkandarkottai Road (Try-01); 1 Road Work 2 Picking the existing BT surface upto 5 cm to 10 cm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete as per standard specifications. as per MoRTH Rev-5 specification 3 km 2/500-4/4 4 Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers usingmotor grader in Sub Base/ Base course on well prepared surface and compacting withvibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 5 km 2/500-4/4 6 Providing and laying Prime Coat overWMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, spraying with pressure distributor including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 7 km 2/500-4/4 8 Providing and laying Tack Coat overWMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it spraying with pressure distributor including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as as per Clause 503 of MORTH Rev-5 9 km 2/500-4/4 10 Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it spraying with pressure distributor including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 11 km 2/500-4/4 12 DBM (Grade-II) 50mm Thick Using VG30DBM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 13 km 2/500-4/4 14 BC 30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 15 km 2/500-4/4 16 Calculation of SubTotal, GST and Total Amount carried out by system automatically 17 Basic cost of value put to tender as per estimate 18 Add GST at 18% 19 Total Value put to Tender 20 Quoted Percentage 21 Quoted Value 22 Add GST at 18% of Final Quoted Value 23 Total Value of Contract Including 18% of GST 24 Basic cost of value put to tender as per Estimate 25 Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) 26 Quoted Rate in Words