

The Andhra Pradesh Metro Rail Corporation Limited has published Engineering, Design And Construction Of Viaduct Length 38.40 Kms (Including 4.33 Kms Of Double Decker 4 Lane Flyover Cum Metro Viaduct) 01Nos. Underground Metro Station And 32 Nos Elevated Metro Stations, Etc. All As Specified On Epc Basis For Phase-1 Of. Submission Date for this Tender is 17-09-2025. Bridge Work Tenders in Vijayawada Andhra Pradesh. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
Click here to download tender document | Tender Documents | 0 KB |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail