CONSTRUCTION OF GLR AT JEGATHALA IN JEGATHALA TOWN PANCHAYAT- 1 Earthwork excavating for open cuttingand depositing on Bank within initial lead of 10mt and lift of 2m in Hard stiff clay , stiff black cotton , hard red earth, shales ,murram, gravel , stoney earth and earth mixed with small size boulders etc., complete complying with standard specification. 2 Earthwork excavating for foundation and depositing on Bank within initial lead of 10mt and lift of 2m in Hard stiff clay , stiff black cotton , hard red earth, shales ,murram, gravel , stoney earth and earth mixed with small size boulders etc., complete complying with standard specification. 3 Cement concrete in 1:4:8 using40 mm size ISS grade machine crushed chips including the cost of mixinglaying curing etc., complete complying with standard specification. 4 Supplying and Erecting Steel Centering for sides andsoffits including supports and struttingplanesurfaces such as RCC Slabs, Rectangular Beams, TEE or ELL Beams, Lintels, Bed blocks, Staircase waist and Landing slabs, Landing Beams, canopyetc., with all cross brasingsusing mild steelsheets of size 90cmx60cm and 10 gauge stiffenedwithwelded MS anglesof size 25mmx25mmx3mm for boardinglaid over silver oak (CW) joists of size 10cmx6.5 cm spaced at about90cm c/c and supported by causrina props of 10cm to 13cm dia spaced at 75cm c/cetc., complete complying with standard specification and as Directed .a. For Plain centering 5 b.For Plain centering 6 Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or Ribbed tor steel rods, for all RCC worksas per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per SS. 7 Reinforced cement concrete in 1:11/2:3[one cement and one and half sand and fourtheaggregate ] using 20 mm size IRC grade machine crushed chips and excludingcost of reinforcement and centering works and including the cost of mixing,laying , curing ,and etc.,complete complying with standard specification . 8 Supply and fixing of Mild steel door using L angles , M.S patta , and M.S sheet of reqiured size and gauge including priming coat the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification 9 Plain Cement concrete 1 : 2 : 4 (one cement, two sand and fouraggregates) using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compactingand curing etc, complete as per SS 10 Plastering in cement mortar 1:3 mix 10mm thick using clean screened sand and including cost of curing for fifteen days from the completion of thework and surface should free from undulationsand including the cost of preparing the surface for plastering and protecting for plastering for plastering and protecting from other damages till setting of mortaretc.complete complying with standard specification- 11 Plastering in cement mortar 1:3 mix 12mm thick using clean screened sand and including cost of curing for fifteen days from the completion of thework and surface should free from undulationsand including the cost of preparing the surface for plastering and protecting for plastering for plastering and protecting from other damages till setting of mortaretc.complete complying with standard specification 12 Painting Two coats using best quality oil bound distember and the colour should be get approved before applying and etc complete complying with standard specification. 13 Supplying and delivery of following dia B class GI Pipe , with standard weight and brand and the rate including all cost and conveyance of all materials to site and Labour charges etc complete complying with standard specification. 50mm dia pipes 14 Laying and jointing G.I pipes and G.I specials to proper gradient and alighnment and testing the pipe with water and the rate including cost and conveyance of all charges etc., complete.50mm dia pipes 15 Labour charges for cutting and threading G.I pipes and the rate including cost and conveyance of all charges etc., complete.Cutting 16 Threading