| 1 | Cost for supply, installation,commisioning & trial run of Steam Boiler(750 Kg/hr capacity)inclusive of all cost for petty civil works,transportation,etc. complete including GST. |
| 2 | Supply, Installation, Commissioning & getting IBR approval of Wood/Briquette fired Boiler with In built Water Pre heater , inclusive of Chimney , Flue gas ducting Feed water tank, Steam , water and related piping , required valves and fittings , as per the scope of supply and technical specification as given .Capacity :750 Kg/Hr (F & A 100oC),Category:IBR,Safety Valve Lift Pressure:10.54 Kg/cm2,Fue:Wood Logs/Briquette (Technical specifications are enclosed in the Tender documents. Tender should be submitted only after verifying the techical specifications) |
| 3 | INSTALLATION OF IBR 750KG/HR BOILER WITH PIPING |
| 4 | ERECTION - Unloading , Leading , Positioning and Alignment of Boilerand its accessories, such as boiler , IDfan Pump , FD Fan ect. On Foundation |
| 5 | DUCTING - Supply, installation and erection of a new squareduct system with appropriate bends, reductions, and flanged connections, fabricated from 3 mm thick MS sheet, The duct shall be supported using C-channels and angles as required for structural stability Ductwith be painted with one coat synchromate premièring (Aproximately 12 meter length) |
| 6 | Feed Water Tank –2000 LT Supply, installation and erection of a Feed Water tankmade from 5 mm thick MS sheet, 450 square man holewith required Nozzles , level glasscock and glass with guard, The tank will be painted with 2 coats system Approximate Tank Size – 1.5Mt Lx 1.5Mt W x 1Mt H |
| 7 | Feed Water tank Structure- supporting structurefor Water tanksupport – 5Mt Ht withworking platform in 3 mm thk checker plate,ladders, etc. structurecleaning and one coat synchromate premiering |
| 8 | IBR STEAM PIPING – PROCESS PIPING Fabrication ,supply and Erection IBR Steam Pipe Sch – 40 , Grade A 106TATA/JINDALwith required fittings such as 150 # flanges, Seamless Elbows, gas cut, nut and bolt etc., a. 50 NB Pipe ,SCH 40, Grade A 106 – IBR – 48 mt – Approx b. 40 NB Pipe ,SCH 40, Grade A 106 – IBR – 24 mt – approx. c. 25 NB Pipe ,SCH 40, Grade A 106 – IBR – 42 mt – Approx d. 20NB / 15NB PIPE,SCH 40, Grade A 106 – IBR- 42 mt – approx. |
| 9 | IBR HEADER - IBR header Pipe ,SCH 40, Grade A 106 150 NB,x2 meter, Fabrication, supply, erectionwith 4 nos nozzle(40 NB 2 Nos ,50 NB 2 Nos ) |
| 10 | Supply and Installation ofIBR Valves-a. 40NBC S GLOBE VALVE – 150# - IBR- 2 nos b. 25NB C S GLOBE VALVE – 150# - IBR – 4 nos c. 20NB/15NB C S GLOBE VALVE – 150# - IBR – 8 nos d. Pressure Gauge – 3 nos |
| 11 | Non IBR PipeFabrication supply and Erection NON -IBR M.S.C Class PipeTATA/JINDALwith required fittings such as 150# flanges, Elbows, gascut, nut and bolt – Boiler Room a. 50NB NON -IBR M.S.C Class Pipe – 18 mt – Approxb. 40NB NON -IBR M.S.C Class Pipe - 12 mt – Approxc. 25 NB NON -IBR M.S.C Class Pipe – 18 mt – Approxd. 15 NBNON -IBR M.S.C Class Pipe- 18 mt – Approx |
| 12 | Non IBR Valvea. 50NB Ball ValveFlanged – 3 nos b. 50 NB Strainer Flanged- 2 nos c. 25NB Ball valveflanged – 3 nos |
| 13 | Trap Assembly System a. 15NB TD Trap Assembly Assembly Includes - 15NB Globe Valve – 2 nos - 15NB Trap – 1 nos - Required pipe and Fittings |
| 14 | STRUCTUARL SUPPORTS Fabrication ,supply and erection of Structural supports for Piping Structure, and supplyof suitable Removable Table MS structure , for Boiler tube cleaning,painted with one coat synchromate premiering |
| 15 | Preparation of IBR Drawing ,Arranging the Hydro test and etc |
| 16 | PRESSURE REDUCING STATION -PRS – 10.54 BAR TO 6 BAR , 750 Kg/Hr steam Flow PRESSURE REDUCING STATION CS , FLANGE # 150 COMPRISING OF 1.Pressure-reducing valve – 2.Moisture separator 3.Drain trap model with valves 15 nb 4. Strainer 5. Inlet isolation valve6. Outlet isolation valve 7.Bypass isolation valve 8.Pressure gauge-2 nos 9. Isolationvalve for the guages – 2 nos 10. SS – syphon for the guages 11.Safety valve full lift 12. Bypass line 13. Interconnecting piping 14. Matching flanges 15. Nuts & bolts |
| 17 | SUPPLYAND ERECTION OF CHIMNEYFabrication supply and Erection of Chimney in the following details- Diameter –400mm - Height – 15M - Material – 5mm M S PLATE - Foundation Bolt - Ladder - 12M - Lighting Arrestor with G I Strip – 1 SET – 25 x 3mm thick - Painting – Two Coat of Heat Resistant outside – 600 degree range - Sample point and working platform with ladder.. |
| 18 | INSULATION AND CLADDINGSupply of insulation- Rockwool covered withmesh and cladding with alumminium sheet of 24 swg with insulation thickness of 50 mm for Steampiping 50 NB Pipe – 54 mt – Approx40 NB Pipe – 24 mt – approx.25 NB Pipe– 48 mt – Approx20NB / 15NB PIPE - 48 mt – approx. |
| 19 | ELECTRICAL WORKSupply and laying of Electrical control and power cabling from the panel board to boiler system -1lotNote: Suppliers willing to Participate in the tender has to make site visit prior to tender submission date, inspect & Evaluate the existing Boiler House, at their own expense, & submit the tender accordingly, as per site conditions & dimensions.The supplier/Manufacturer of the Boiler should have Local after sales support, with spares, within Kerala, Address of local offices with contact details to be given along with Tender.Period of completion of Work: Boiler to be Delivered at site within 45 days of date of execution of agreement. Boiler to be commissioned & Handed over within 45 days of Delivery of the boiler at site. Boiler to be installed in the existing Boiler House KERALA AGRO FRUIT PRODUCTS ,PUNALUR Will Provide the following for supply /Works , for Installation & commissioning of the Boiler at site such as 1) Electrical Cabling up to the control panel of the boiler 2) Boiler feed water chemicals required for regular operation of the Boiler 3) Feed water for regular operation of the boiler ( Approximately 1000 Ltr/Hr ) , as per the water quality mentioned in the tech spec4) Statutory fee at Actual for obtaining IBR Approvalof the Boiler will be paid byKERALA AGRO FRUIT PRODUCTS5) Boiler operator ( IBR Licensed) will be arranged byKERALA AGRO FRUIT PRODUCTS during commissioning and regular operation of the boiler6) Free supply of Electricity ( Power ) & water to the contractor for carrying out the installation work |