Mla Lad Fund (Deposit Works). Construction Of Side Drains And Providing And Laying Rmc In Cross Gali No.1, Virender Colony Near Aqua Garden Banquet Hall In Burari Ac-02- 1 Hiring & running charges of JCB machine on hourly basis including all operations i.e. to and fro, carriage, crawling of machine, operator and fueletc. complete. 2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. 3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) 4 Brick work with common burnt clay F.P.S. (non modular) bricks ofclass designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) 5 12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand) with Neat cement punning. 6 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate 7 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone III) : 4 graded stone aggregate 20 mm nominal size) 8 Centering and shuttering including strutting, propping etc. and removalof form for : Foundations, footings, bases of columns, etc. for mass concrete 9 Supply and filling building rubbish in trenches, plinth, road in layers not exceeding 20cmM depth,with power roller of minimum 8 tonne consolidating each deposited layer by ramming and watering, with all lead and lifts. 10 Supply ofC&D waste / screen soil and carriage up to site of work by mechanical transport including loading, unloadingand banking the same in layers not exceeding 20 cm in depth, rolling each layer with ½ tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling in ground depressions. 11 Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing,admixtures in recommended proportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.” Note : Excess/less cement used than specified in this item is payable/ recoverable separately. All works upto plinth level :M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) 12 Providing and laying RMC of M-30 grade By using minimum 400kg of cement(43 grade, OPC) per cum of concrete in roads / streets manufactured in automatic RMC plant using coarse sand and graded stone aggregate of 20mm nominal size in appropriate proportion as per approved design criteria including transportation to site in transit mixer, including cost of admixture in recommended proportion as per IS9103 to accelerate/ retard setting of concrete to improve workability with out impairing strength and durability as per specification including spreading and compacting mechanically by using needle and surface vibratos, leveling to required slope & camber, finishing by floating & brooming with wire brushes etc. and curing including making provision for contraction / expansion, construction of cross / longitudinal joints of size 10mm wide 50mm deep by groove cutting machine, providing and filling joints with approved joint filler and sealants, etc. complete, as per direction of Engineer in-charge. (Cost of joint filler & sealants shall be paid for separately under relevant items).Note:- Cement content considered in M-30 is @ 400kg/cum. Less cement used as per design mix is recoverable separately.M-30 RMC by using minimum cement @400 kg/cum. Cement concrete manufactured in automatic batching plant (RMC plant) including transportation to site in transit mixer. 13 Providing and laying in position bitumen hot sealing compound for expansion joints etc.Using grade A sealing compound. 14 Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 15 Lettering with black Japan paint of approved brand and manufacture 16 Painting with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade .Two or more coats on new work over an under coat of Two or more coats on new work over an under coat of manufacture.