Defence Statutory Bodies & Commissions/Committees Closing in 3 days TDR #50486901

Tender For Addn/Altn And Up Gradation Of Sewage System At Base Hospital Under Ge East Delhi Cantt10 Para 35 Work.

Issued by Statutory Bodies & Commissions/Committees · delhi, Delhi
Tender Value
2.67 Crore
Estimated cost
Bid Submission
11 Jul 2026
3 days left
EMD
3.42 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
delhi → Delhi
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Addn/Altn And Up Gradation Of Sewage System At Base Hospital Under Ge East Delhi Cantt10 Para 35 Work.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 28-Nov-2025 Amendment No. 08 Date 20-Dec-2025
2 15-Nov-2025 Amendment No 7 Date 06-Dec-2025
3 27-Dec-2025 Amendment No 10 Date 17-Jan-2026
4 01-Nov-2025 Amendment No 6 Date 22-Nov-2025
5 13-Dec-2025 Amendment No 9 Date 03-Jan-2026
6 17-Oct-2025 Amendment No 5 Date 08-Nov-2025
7 10-Jan-2026 Amendment No 11 Date 17-Feb-2026
8 19-Sep-2025 Amendment No 3 Date 11-Oct-2025
9 03-Oct-2025 Amendment No 4 Date 25-Oct-2025
10 04-Sep-2025 Amendment No 2 Date 27-Sep-2025
11 21-Aug-2025 Amendment No 1 Date 13-Sep-2025
12 23-Mar-2026 Amendment No 15 Date 06-Apr-2026
13 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
14 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
15 10-Jan-2026 Amendment No 11 Date 17-Feb-2026
16 27-Dec-2025 Amendment No 10 Date 17-Jan-2026
17 13-Dec-2025 Amendment No 9 Date 03-Jan-2026
18 28-Nov-2025 Amendment No. 08 Date 20-Dec-2025
19 15-Nov-2025 Amendment No 7 Date 06-Dec-2025
20 01-Nov-2025 Amendment No 6 Date 22-Nov-2025
21 17-Oct-2025 Amendment No 5 Date 08-Nov-2025
22 03-Oct-2025 Amendment No 4 Date 25-Oct-2025
23 19-Sep-2025 Amendment No 3 Date 11-Oct-2025
24 04-Sep-2025 Amendment No 2 Date 27-Sep-2025
25 21-Aug-2025 Amendment No 1 Date 13-Sep-2025
26 10-Mar-2026 Amendment No 14 Date 30-Mar-2026
27 10-Mar-2026 Amendment No 14 Date 30-Mar-2026
28 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
29 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
30 01-Nov-2025 Amendment No 6 Date 22-Nov-2025
31 17-Oct-2025 Amendment No 5 Date 08-Nov-2025
32 03-Oct-2025 Amendment No 4 Date 25-Oct-2025
33 19-Sep-2025 Amendment No 3 Date 11-Oct-2025
34 04-Sep-2025 Amendment No 2 Date 27-Sep-2025
35 21-Aug-2025 Amendment No 1 Date 13-Sep-2025
36 10-Jan-2026 Amendment No 11 Date 17-Feb-2026
37 27-Dec-2025 Amendment No 10 Date 17-Jan-2026
38 13-Dec-2025 Amendment No 9 Date 03-Jan-2026
39 28-Nov-2025 Amendment No. 08 Date 20-Dec-2025
40 15-Nov-2025 Amendment No 7 Date 06-Dec-2025
41 10-Mar-2026 Amendment No 14 Date 30-Mar-2026
42 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
43 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
44 06-Apr-2026 Amendment No 17 Date 27-Apr-2026
45 30-Mar-2026 Amendment No 16 Date 13-Apr-2026
46 10-Jan-2026 Amendment No 11 Date 17-Feb-2026
47 27-Dec-2025 Amendment No 10 Date 17-Jan-2026
48 13-Dec-2025 Amendment No 9 Date 03-Jan-2026
49 28-Nov-2025 Amendment No. 08 Date 20-Dec-2025
50 15-Nov-2025 Amendment No 7 Date 06-Dec-2025
51 01-Nov-2025 Amendment No 6 Date 22-Nov-2025
52 17-Oct-2025 Amendment No 5 Date 08-Nov-2025
53 03-Oct-2025 Amendment No 4 Date 25-Oct-2025
54 04-Sep-2025 Amendment No 2 Date 27-Sep-2025
55 21-Aug-2025 Amendment No 1 Date 13-Sep-2025
56 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
57 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
58 10-Mar-2026 Amendment No 14 Date 30-Mar-2026
59 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
60 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
61 10-Jan-2026 Amendment No 11 Date 17-Feb-2026
62 27-Dec-2025 Amendment No 10 Date 17-Jan-2026
63 13-Dec-2025 Amendment No 9 Date 03-Jan-2026
64 28-Nov-2025 Amendment No. 08 Date 20-Dec-2025
65 15-Nov-2025 Amendment No 7 Date 06-Dec-2025
66 01-Nov-2025 Amendment No 6 Date 22-Nov-2025
67 17-Oct-2025 Amendment No 5 Date 08-Nov-2025
68 03-Oct-2025 Amendment No 4 Date 25-Oct-2025
69 19-Sep-2025 Amendment No 3 Date 11-Oct-2025
70 04-Sep-2025 Amendment No 2 Date 27-Sep-2025
71 21-Aug-2025 Amendment No 1 Date 13-Sep-2025
72 30-Mar-2026 Amendment No 16 Date 13-Apr-2026
73 23-Mar-2026 Amendment No 15 Date 06-Apr-2026
74 20-Apr-2026 Amendment No 18 Date 04-May-2026
75 06-Apr-2026 Amendment No 17 Date 27-Apr-2026
76 30-Mar-2026 Amendment No 16 Date 13-Apr-2026
77 23-Mar-2026 Amendment No 15 Date 06-Apr-2026
78 10-Mar-2026 Amendment No 14 Date 30-Mar-2026
79 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
80 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
81 10-Jan-2026 Amendment No 11 Date 17-Feb-2026
82 27-Dec-2025 Amendment No 10 Date 17-Jan-2026
83 13-Dec-2025 Amendment No 9 Date 03-Jan-2026
84 28-Nov-2025 Amendment No. 08 Date 20-Dec-2025
85 15-Nov-2025 Amendment No 7 Date 06-Dec-2025
86 01-Nov-2025 Amendment No 6 Date 22-Nov-2025
87 17-Oct-2025 Amendment No 5 Date 08-Nov-2025
88 03-Oct-2025 Amendment No 4 Date 25-Oct-2025
89 19-Sep-2025 Amendment No 3 Date 11-Oct-2025
90 04-Sep-2025 Amendment No 2 Date 27-Sep-2025
91 21-Aug-2025 Amendment No 1 Date 13-Sep-2025
92 27-Apr-2026 Amendment No 19 Date 11-May-2026
93 06-Apr-2026 Amendment No 17 Date 27-Apr-2026
94 30-Mar-2026 Amendment No 16 Date 13-Apr-2026
95 23-Mar-2026 Amendment No 15 Date 06-Apr-2026
96 10-Mar-2026 Amendment No 14 Date 30-Mar-2026
97 20-Apr-2026 Amendment No 18 Date 04-May-2026
98 23-Feb-2026 Amendment No 13 Date 17-Mar-2026
99 10-Feb-2026 Amendment No 12 Date 03-Mar-2026
100 10-Jan-2026 Amendment No 11 Date 17-Feb-2026

BOQ

NAME OF WORK : ADDN/ALTN AND UPGRADATION OF SEWAGE SYSTEM AT BASE HOSPITAL UNDER GE (EAST) DELHI CANTT-10 (PARA 35 WORK)
Sl. No. Item Description
1Excavation in trenches not exc. 1.5m wide and not exc. 1.5m in depth; for foundation etc. orfor shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan in soft/loose soil and getting out,complete all as specified & directed.
2Excavation in trenches not exc. 1.5m wide and exc. 1.5m in depth but n exc 3.0m in depth; for foundation etc. orfor shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan in soft/loose soil and getting out,complete all as specified & directed.
3Excavation in trenches not exc. 1.5m wide and exc. 3.0m in depth but n exc 4.5m in depth; for foundation etc. orfor shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan in soft/loose soil and getting out,complete all as specified & directed.
4Returning, filling in (soil), including spreading, leveling, watering and well ramming in layers not exc. 25cm, complete all as specifed & directed.
5Removing excavated material to a distance exceeding. 250m but n exceeding 500m and depositing where directed at a level not exc. 1.5m above the starting point, complete all as specified & directed.
6Demolition and breaking up drain pipes (Salt glazed stoneware, AC or Reinforced concrete) set in cement mortar, internal dia of pipe 150mm, complete all as specifed & directed.
7Demolition and breaking up drain pipes (Salt glazed stoneware, AC or Reinforced concrete) set in cement mortar, internal dia of pipe 200mm, complete all as specifed & directed.
8Demolition and breaking up drain pipes (Salt glazed stoneware, AC or Reinforced concrete) set in cement mortar, internal dia of pipe 300mm, complete all as specifed & directed.
9Demolition of brickwork or stone/boulder masonry built in cement mortar including all quoins, arches, pillars etc., but excluding ashlar facing, dressed stone work and precast concrete articles, complete all as specified & directed.
10Supply and fixing/laying class SN-8, dia of pipe 150mm & thickness of pipe as specified in IS 16098 (Part-2) : 2013, clause 6.3.1 table no 5 structured wall polythelene piping system (pipe with online/offline coupler and elastomeric sealing ring) with non smooth external anular corrugated and smooth internal surface (double wall) for non pressure underground sewerage & drainage application polythylene piping fitted with help of coupler attached with one end of pipes, sliding over the elastomeric sealing rubber ring placed on the specified valley of the corrugation at the spigot end, lowering the same into the trench, laying at prescribed gradient, depth and alignment, testing the water tightness of the joint, ensuring the continuity tests of the specified pipe segments etc including all necessary fittings (cost of fittings, rubber rings, gaskets etc includded), complete all as specified and directed.
11All as per Srl item No. 10 above but dia of pipe 200mm.
12All as per Srl item No. 10 above but dia of pipe 300mm.
13M&L for Reinforced concrete pipes, class NP2, laid & jointed complete with collars, bore of pipe 450mm, complete all as specified & directed.
14M&L for concrete bed to 150mm bore drain pipes including packing under, and haunching against the sides of pipes after they are laid in cement concret 1:4:8 (Nominal mix) type D-2 using 40mm graded crushed stone aggregate, and tested, complete all as specified & directed.
15M&L for concrete bed to 200mm bore drain pipes including packing under, and haunching against the sides of pipes after they are laid in cement concret 1:4:8 (Nominal mix) type D-2 using 40mm graded crushed stone aggregate, and tested, complete all as specified & directed.
16M&L for concrete bed to 300mm bore drain pipes including packing under, and haunching against the sides of pipes after they are laid in cement concret 1:4:8 (Nominal mix) type D-2 using 40mm graded crushed stone aggregate, and tested, complete all as specified & directed.
17M&L for concrete bed to 450mm bore drain pipes including packing under, and haunching against the sides of pipes after they are laid in cement concret 1:4:8 (Nominal mix) type D-2 using 40mm graded crushed stone aggregate, and tested, complete all as specified & directed.
18M&L for construction of brick manhole of internal size 0.60 x 0.75 x 0.80 (MH1) including RCC man hole cover, earthwork, PCC 1:4:8 type D2 for bedding, PCC 1:2:4 type B1 for benching, 15mm thick rendering in cement mortar 1:4 intenally and externally above ground floor, back filling etc complete all as specified, directed and shown on drawing.
19S&F Precast RCC (M-40) Manhole with RCC man hole cover including earthwork, PCC 1:4:8 type D2 for bedding, PCC 1:2:4 type B1 for benching , RCC walls/floors with reinforcement, necessary formwork, plastering, backfilland use ofsealant, groutsand mastic as required for connection of pipe of any size, complete all as per ASTM C478 of following sizes :-
20S&F Precast RCC (M-30) CIRCULAR MANHOLE of 900 mm internal dia for depth exceeding 800mm but not exceeding 1500mm (MH2), complete all as specified, directed and shown on drawing
21S&F Precast RCC (M-30) CIRCULAR MANHOLE of 1200 mm internal dia for depth exceeding 1500mm but not exceeding 2050mm (MH3), complete all as specified, directed and shown on drawing.
22S&F Precast RCC(M-30) CIRCULAR MANHOLE of 1500 mm internal dia for depth exceeding 2050mm but not exceeding 3000mm (MH4), complete all as specified, directed and shown on drawing.
23S&F Precast RCC (M-30) CIRCULAR MANHOLE of 1800 mm internal dia for depth exceeding 3000mm but not exceeding 4500mm (MH5), complete all as specified, directed and shown on drawing.
24M&L for cutting into existing manholes for connecting new drains, making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1 smooth finished and reforming benching, internal dia of pipe 150mm, complete all as specified & directed.
25All same as per Srl item No 20 above but 200mm dia of pipe.
26All same as per Srl item No 20 above but 300mm dia of pipe.
27M&L for cleaning of sewage well of 5.00M dia or more andany depth by Manually/ Mechanicaly or hydraulic operated high pressure suction sewer cleaning machine having suitable tank capincluding skilled driver operator & labour and removal of sludge/ silt/ liquid/ mud in foul position and disposing the sameout side MD premises, complete all as specified and directed.
28Dismantling wrought iron or mild steel work of any description not otherwise provided for, complete all as specified & directed.
29S&F Mild steel framed work as in grills, gratings, etc. with ends of bars shouldered and or reveted, or forged into spikes, framed guard bars, barred iron doors, ladders, framed balusters, walk ways, railings, framework of water tanks and similar work conforming to Fe-290 grade-E-165, complete all as specified & directed.
30M&L for preparation of new or previously untreated steel surfaces of any description over 10cm width or girth and applying two coats ofsynthetic enamel paint over a coat of red oxide zinc chrome primer, complete all as specified & directed.
31M&L for providing temporary soakpits of size 1.2 x 1.2 x 2.0m with necessary SWR of 150mm dia pipe line and removing sewage / sullage in regular intervals and keep servicing upto the completion of work / upto servicing of new sewage lines, complete all as specified and directed.
32Boring of holes in any type of soil for 150mm bore, under road/ pavement/ hardstanding by trenchless technology using ultra sound technique and necessary machine, complete all as specified and directed. Notes :-(i) The contractor will be responsible for taking permission from appropriate authority i.e. NHAI / IGL or other Units , if needed, for above said work. (ii) Depth of trench less shall not less than 2 mtr from ground level unless other wise specifed due to site requirement and contractor has to maintain the depth of trenchless up to 4 mts from ground level if required as per site conditionsall rates quoted shall be demeed to be included to maintain the Trench less depts as directed during exection to avoid damages to the existing services(iii) The cost quoted is deemed to be included for repair/ rectification for damages done to the existing water supply system/ sewage system/ electrical system during execution of work
33All as per Srl item No. 28 above but for 200mm dia bore.
34All as per Srl item No. 28 here-in-before but for exc 200mm bore n.exc 450mm bore,
35M&L for brickwork with sub-class ‘B’ bricks (old size), straight or curved on plan exc. 6m in mean radius, built in cement mortar 1:4, complete all as specified & directed.
36M&L for 15mm thick rendering in cement mortar1:4 onfair faces of brick surfaces or concrete surfaces, surface finished even and smooth without using extra cement, complete all as specified & directed.
37M&L for preparation of new plastered or concrete surfaces of wallsand applying two coats of cement base paint of any tint over a coat of alkali resistant primer, complete all as specified & directed.
38Dismantling of stone slabs and tiles of any description or thickness laid bedded and pointed in any type of mortar in floor, aprons etc and including disposal of all debris to a distanceexc 1.5 KM but not exc 5 Km, complete all as specified & directed.
39Demolition of cement concrete (un-reinforced) in ground floors and paving not exceeding 15cm thickness (below or above ground level), complete all as specified & directed.
40M&L for 100mmthick PCC 1:4:8 type D-2 using 40 mm graded crushed stone aggregate as in sub base and like, complete all as specified and directed.
41M&L for 60mm thick factory made chamfered edge cement concrete paver block of M-30 grade with approved colour, design & pattern as in footpath, parks, lawns, drive ways or light traffic parking etc., of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 50mm thick compacted bed of coarse sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver block as per required size and pattern, finishing and sweeping extra sand, complete all as specified and directed.
42M&L for 25mm thick cement concrete 1:2:4 type B-0 using 12.5mm graded crushed stone aggregate as in levelling courses, complete all as specified and directed.
43M&L for heavy duty coloured (approved colour) fully vitrified paving tiles of size 400mm x 400mm x 11 to 12mm thick, set and jointed in neat cement slurry and pointed in coloured or white cement to match the shade of tiles over and including 15 mm thick screed bed in cement mortar 1:6, complete all as specified and directed.
44M&L for rubber moulded cement concrete chequered tiles of size 300x300x25mm thick with grey cement & pigment, set & jointed in cement slurryincluding 15 mm thick screed bed in cement mortar 1:6, complete all as specified and directed. Make : Ultra, Unistone, Duracrete
45M&L for 18-20 mmthick of approved shade granite stone Z Black (superior quality) slab, (table rubbed and polished) as in floors, jambs, steps, cooking platform and the like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with shade of granite, two strip of line make on (tread of stair case) granite over & including 15mm thick screed bed in cement mortar 1:4, complete all as specified & directed.
46Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required, complete all as specified & directed.
47M&L forprepration of previously untreated/new concrete surface of concrete walls/ kerb stone and applying two coats of plastic emulsion paint over one coat of priming paint, complete all as specified and directed.
48M&L for cutting into existing road surfaces by picking, sweeping etcfor laying of new drains pipes andgetting out, complete all as specified and directed.
49M&L for broken stone or bouldersof gaugeexc 63mm but n exc 100mmdeposited, spread and levelled in layers n exc 15cm thick, watered and rammed to a true surface, complete all as specified & directed.
50M&L for 150mmthick PCC 1:3:6 type C-2 using 40 mm graded crushed stone aggregate as in sub base, complete all as specified and directed.
51M&L for 100mm thick cement concrete 1:2:4 type B-0 using 12.5mm graded crushed stone aggregate as in levelling courses, complete all as specified and directed.
52Dismantling posts or structs (wood, steel or RCC) any section, including taking out embedded portion and making good disturbed ground, posts embedded in natural ground, complete all as specified & directed.
53Dismantling of fencing wire mesh of any type & description from TMT Bar/ Fencing post, complete all as specified & directed.
54Excavation in post holes (or similar holes) each not exc. 0.50 cum, in soft/loose soil and getting out, returning filling in and ramming earth or broken rubble mixed with earth around in layers not exc. 25cm, watering and removal of excavated materials to a distance n. exc. 50m and making good surfaces, complete all as specified & directed.
55S&F for rolled mild steel work in posts & struts and similar work usingangle iron, fixed independently without connecting plates, etc. (cut to ordinary length i.e. within 20mm of the length indicated),conforming to Fe-290 grade-E-165 including cutting tops to shape, drilled holes, notching for wire,all necessary drilling, bolting or riveting, etc., , complete all as specified & directed.Note : Unit rate is also includedlocking holes after fixing of barbed wire and welding to bent up portion as directed.
56M&L for PCC 1:3:6 type C-1 using 40 mm graded crushed stone aggregate as in foundation filling and mass concrete, complete all as specified and directed.
57S&F Mild steel screw bolts (machine made) with hexagonal or square heads at one ends and screwed the other ends, or screwed both ends, each screwed ends to be fitted with washers and one hexagonal or square nut exc 5cm long, diametre of shank 10mm dia and over, complete all as specified & directed.
58S&F Mild steel Round bars10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips confirming to Fe-410-W 432 (Part I) (Gde.E-250) Part- I quality-A or Fe 290 (Gde - E-165), complete all as specified and directed.
59M&L for preparation of new or previously untreated steel surfaces of any description, width or girth not exceeding 10cmand applying two coats ofsynthetic enamel paint over a coat of red oxide zinc chrome primer, complete all as specified & directed.
60Supply only chain link fencing of galvanised steel wire, weight not exc 4.00 Kg/Sqm, conforming to IS:2721:2003 including line wires, straining bolts,binding wire etc, complete all as specifed & directed.
61Fixing only chain link fencing including line wires, any mesh, size and type to any type of standards, rails, straining bolts, etc., including provission of binding wire, complete all as specified & directed.

AI Tender Summary

OUR REF NO 50486901
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 2.67 Crore
LAST DATE 11-07-2026
Authority
Authority Name Military Engineer Services
Work Description Tender For Addn/Altn And Up Gradation Of Sewage System At Base Hospital Under Ge East Delhi Cantt10 Para 35 Work.
Basic Detail
Tender No CEDZ/TOKEN-29 OF 2025
Bidding Type Tender
Location
City delhi
State Delhi
Key Dates
Publish Date 04 Jul 2026
Submission Date 11 Jul 2026
Open Date 14 Jul 2026
Finance
Tender Value 2.67 Crore
Tender Fee 2000
EMD 3.42 Lakhs
Exemption Available
Document List
08401ede-a62b-469c-8249-d709e93982a4.html
BOQ_810644.xls
Tendernotice_1.pdf
uploadtender83180.rar

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 04, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 20, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 06, 2025
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 17, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 22, 2025
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 03, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2025
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 11, 2025
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 25, 2025
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 27, 2025
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 13, 2025
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 17, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 03, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 20, 2025
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 06, 2025
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 22, 2025
18:00 IST

Corrigendum-20 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2025
18:00 IST

Corrigendum-21 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 25, 2025
18:00 IST

Corrigendum-22 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 11, 2025
18:00 IST

Corrigendum-23 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 27, 2025
18:00 IST

Corrigendum-24 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 13, 2025
18:00 IST

Corrigendum-25 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-26 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-27 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-28 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-29 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 22, 2025
18:00 IST

Corrigendum-30 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2025
18:00 IST

Corrigendum-31 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 25, 2025
18:00 IST

Corrigendum-32 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 11, 2025
18:00 IST

Corrigendum-33 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 27, 2025
18:00 IST

Corrigendum-34 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 13, 2025
18:00 IST

Corrigendum-35 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-36 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 17, 2026
18:00 IST

Corrigendum-37 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 03, 2026
18:00 IST

Corrigendum-38 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 20, 2025
18:00 IST

Corrigendum-39 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 06, 2025
18:00 IST

Corrigendum-40 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-41 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-42 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-43 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 27, 2026
18:00 IST

Corrigendum-44 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-45 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-46 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 17, 2026
18:00 IST

Corrigendum-47 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 03, 2026
18:00 IST

Corrigendum-48 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 20, 2025
18:00 IST

Corrigendum-49 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 06, 2025
18:00 IST

Corrigendum-50 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 22, 2025
18:00 IST

Corrigendum-51 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2025
18:00 IST

Corrigendum-52 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 25, 2025
18:00 IST

Corrigendum-53 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 27, 2025
18:00 IST

Corrigendum-54 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 13, 2025
18:00 IST

Corrigendum-55 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-56 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-57 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-58 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-59 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-60 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-61 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 17, 2026
18:00 IST

Corrigendum-62 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 03, 2026
18:00 IST

Corrigendum-63 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 20, 2025
18:00 IST

Corrigendum-64 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 06, 2025
18:00 IST

Corrigendum-65 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 22, 2025
18:00 IST

Corrigendum-66 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2025
18:00 IST

Corrigendum-67 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 25, 2025
18:00 IST

Corrigendum-68 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 11, 2025
18:00 IST

Corrigendum-69 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 27, 2025
18:00 IST

Corrigendum-70 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 13, 2025
18:00 IST

Corrigendum-71 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-72 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-73 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 04, 2026
18:00 IST

Corrigendum-74 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 27, 2026
18:00 IST

Corrigendum-75 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-76 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-77 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-78 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-79 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-80 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-81 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 17, 2026
18:00 IST

Corrigendum-82 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 03, 2026
18:00 IST

Corrigendum-83 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 20, 2025
18:00 IST

Corrigendum-84 Issued

Clarifications on tender conditions and amendments issued.

Completed
Dec 06, 2025
18:00 IST

Corrigendum-85 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 22, 2025
18:00 IST

Corrigendum-86 Issued

Clarifications on tender conditions and amendments issued.

Completed
Nov 08, 2025
18:00 IST

Corrigendum-87 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 25, 2025
18:00 IST

Corrigendum-88 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 11, 2025
18:00 IST

Corrigendum-89 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 27, 2025
18:00 IST

Corrigendum-90 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 13, 2025
18:00 IST

Corrigendum-91 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 11, 2026
18:00 IST

Corrigendum-92 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 27, 2026
18:00 IST

Corrigendum-93 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-94 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-95 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-96 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 04, 2026
18:00 IST

Corrigendum-97 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-98 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 03, 2026
18:00 IST

Corrigendum-99 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 17, 2026
18:00 IST

Corrigendum-100 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 11, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Jul 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

08401ede-a62b-469c-8249-d709e93982a4.html

xls

BOQ_810644.xls

pdf

Tendernotice_1.pdf

rar

uploadtender83180.rar

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders