Providing New Pumpset Veeranvilai, Parambikulam And Kokkaneri Villages In T. Village Panchayat, Valliyoor Panchyat Union , Supply And Delivery Of 15 Hp Submersible Motor Pump Set (Three Phase) With Duty Condition Of 1000Lpm Against 60M Head Etc., Complete. , Supply And Delivery Of Panel Board (Three Phase) For 15 Hp Submersible Motor Pump Set , Supply And Deliveryof 3Core 6Mm2 Flat Submersible Cable , Supply And Deliveryof 75Mm Dia Hdpe Pipe , Charges For Erecting Submersible Motor Pump Set With Proper Cable, Eb Service, Trial Run & Clamping Etc., Complete. , Supply And Fixing Of Tneb Meter Board Suitable For 32A Single Phase Service Connection With 32A Fuse Unit (500V) 32A Neutral Link And Earth Link (1 X 1/8 Copper Flat) On Tw Plank Of Size 375Mm X 300Mm X 19Mm With Supporting Tw Reepers Of 1 Thick An Either Side With Painting With Suitable Bolt And Nuts For Fixing The Tw Plank On Wall With Earth Connection And Inter Connection With 7/20 Pvc Insulated Copper Wire From Eb Meter To Fuse Unit.Sd-125 , Supply And Fixing Of 32 Amps Dp Switch Of 500 V With Matal Clad With Fuse And Neutral (Side Handle) On Suitable Tw Board With Earth Connection Only.Sd-144 , Supply And Run Of 2 Of 4 Sq.Mm (56/0.3) Pvc Insulated Sc Unsheathed Cu.Conductor Of 1100V On 7/20 Gi Bearer Wire For Service Connection Mains Sd 64 , Supply And Fixing Of Service Wire With 25Mm Dia Gi Pipe Including Cost And Conveyance All Labour Charges Etc Complete. , Supply And Delivery Of 90Mm Dia 6 Ksc Pvcpipe , Supply And Delivery Of 80Mm Gi Pipe , Earth Work Excavation With An Initial Lead And Lift In Hard Stiff Clay, Black Cotton, Hard Red Earth, Sub Murram Gravel, Stone And Earth Mixed Bouldersas Per Ss20b. , Refilling Excavated Earth Including All Cost , Laying Of Pvc Rigid Pipes With Lead Of 200M Lowering Into Trench, Laying In Proper Grade, Alignment, Jointing Pvc Coupler With Specials And Tested To The Required Pressure Including Conveyance Of Water Upto 1Km Lead During The Testing. , Laying And Jointing The 80Mm Gi Pipe , Supply And Delivery Of 10 Hp Submersible Motor Pump Set (Three Phase) With Duty Condition Of 300Lpm Against 100 Head Etc., Complete. , Supply And Delivery Of Panel Board (Three Phase) For 10 Hp Submersible Motor Pump Set , Supply And Deliveryof 3Core 4Mm2 Flat Submersible Cable , Supply And Deliveryof 50Mm Dia Gi Pipe , Charges For Erecting Submersible Motor Pump Set With Proper Cable, Eb Service, Trial Run & Clamping Etc., Complete. , Supply And Fixing Of Tneb Meter Board Suitable For 32A Single Phase Service Connection With 32A Fuse Unit (500V) 32A Neutral Link And Earth Link (1 X 1/8 Copper Flat) On Tw Plank Of Size 375Mm X 300Mm X 19Mm With Supporting Tw Reepers Of 1 Thick An Either Side With Painting With Suitable Bolt And Nuts For Fixing The Tw Plank On Wall With Earth Connection And Inter Connection With 7/20 Pvc Insulated Copper Wire From Eb Meter To Fuse Unit.Sd-125 , Supply And Fixing Of 32 Amps Dp Switch Of 500 V With Matal Clad With Fuse And Neutral (Side Handle) On Suitable Tw Board With Earth Connection Only.Sd-144 , Supply And Run Of 2 Of 4 Sq.Mm (56/0.3) Pvc Insulated Sc Unsheathed Cu.Conductor Of 1100V On 7/20 Gi Bearer Wire For Service Connection Mains Sd 64 , Supply And Fixing Of Service Wire With 25Mm Dia Gi Pipe Including Cost And Conveyance All Labour Charges Etc Complete. , Earthwork Excavation For Foundation In All Soils And Sub Soils And To Full Depth As May Be Directed Except In Rock Requiring Blasting But Inclusive Of Shoring, Strutting And Baling Out Water Wherever Necessary And Refilling The Sides Of Foundation With Excavated Earth In Layers Of Not More Than 15Cm Thick, Well Rammed And Consolidated And Depositing The Surplus Earth Within The Compound In Places Shown By The Departmental Officers With Initial Lead And Lift Etc.,Including Levelling The Sites Complete Complying With Standard Specifications And As Directed. (Hard Soil) , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing,Laying And Curing Etc Complete , Cement Concrete 1:2:4 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing,Laying And Curing Etc Complete , Cement Concrete 1:3:6 Mix Using 40Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete , Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Complete , Refillingthe Basement With Excavated Earth Including All Labour Charges For Filling As Per Standard Specifications , Supplying And Erecting Centeringshuttering Includingnecessary Supportsforplane Etc., Complete. , Supplying And Fixing Of 0.47Mm Thick Galvalume Sheet On Side Cladding With Necessary Framing Supports With Neat Alignment And Necessary Rubber Beading Etc All Complete As Directed By The Departmental Officers , Making New Truss Using New Mateials Of L Angle Of Size 35X35x6mm Including Cutting The Angle To The Required Length Drilling Holes Wherever Necessary For Fixing The Pipe Purlins, Rafters And Fixing The Post Etc., Complete. , Earth Work Excavation In All Clauses Of Soils With Initial Lead And Lift Except Hard Rock Requiring Blasting Etc., Complete For Foundation As Per Ss 20B For Foundation , Cement Concrete 1:4:8 Mix Using 40M Iss Size Hbg Metal Including All Cost And Conveyance And All Labour Charges Etc., Complete. , Refilling The Basement With Excavated Earthother Than Sand And All Labour Charges Such As Watering And Ramming Etc., Complete As Per Standard Specification. , Random Rubble Measonry In Cm 1:5 Mix Using Required Bond Stone With Simulataneous Pointing Including All Cost And Conveyance And All Labour Charges Etc., Complete. , Brick Work In Cm 1:5 Mix Using Country Bricks Including All Cost And Conveyance And All Labour Charges Etc., Complete. , Centering Charges For All Concrete Works Including All Cost And Conveyance And All Labour Charges Etc., Complete. , Supplying And Fabrication Of Steel Including All Cost And Conveyance And All Labour Charges For Cutting, Bending, Tieing And Placeing In Position Etc., Complete. , Rcc 1:1.5:3 Mix Using 20Mm Iss Hbg Metal Including All Cost And Conveyance And All Labour Charges Etc., Complete Excluding Cost Of Steel Without Centering. , Fixing In Position Of Steel Door , Finishing The Top Of Roof With One Course Of Pressed Tiles Of Size 20 Cm X 20 Cm X 2 Cm Laid In Cement Mortar 1:3 (One Cement And Three Sand) 12Mm Thick Mixed With Water Proofing Compound Conforming To I.S. At 2% By Weight. , Plastering With Cm 1:3 Mix Using To 10Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete , Plastering With Cm 1:5 Mix Using To 12Mm Thick Including All Cost And Conveyance Of All Materials And All Labour Charges Etc., Complete , Distempering Two Coats Using Best Quality And Approved Colour Of Oil Bound Distemper Over One Coat Of Cement Paint Primer Including All Cost And Conveyance Of Materials, Labour Charges Etc., Complete. , Exterior Emulsion Painting Two Coats With Best Approved Quality And Colour Emulsion Paint Over One Coat Of Base Coat Including Cost And Convyance Of All Materials To Work Site And Labour Charges Etc., Complete. , Providing Granolethic Floor Finish In Cement Concrete 1:2:4 Mix Using 10-12Mm Iss Metal To 25Mm Thick Including All Cost And Conveyance And All Labour Charges Etc., Complete. , Painting Two Coats Over New Iron Works Using Ready Mixed Enamel Paint Including Cost And Conveyance Of Paint And All Labour Charges Etc., Complete.