Tender For Yearly Rate Contract For Pipe Line Leakage Repairing Under City Sub Division X Pushkar Ajmer - Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 2 In all type Soil AC/PVC/HDPE pipe 3 50/63/75mm 4 80/90mm 5 100/110mm 6 125/140mm 7 150/160/180mm 8 200/225mm 9 For BT Road 10 50/63/75mm 11 80/90mm 12 100/110mm 13 125/140mm 14 150/160/180mm 15 200/225mm 16 FocCC road 17 50/63/75mm 18 80/90mm 19 100/110mm 20 125/140mm 21 150/160/180mm 22 200/225mm 23 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineabove 1.5 mtr and up to 3 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)In all type Soil AC/PVC/HDPE pipe 24 50/63/75mm 25 80/90mm 26 100/110mm 27 125/140mm 28 150/160/180mm 29 200/225mm 30 FOR BT ROAD 31 50/63/75mm 32 80/90mm 33 100/110mm 34 125/140mm 35 150/160/180mm 36 200/225mm 37 FOR CC ROAD 38 50/63/75mm 39 80/90mm 40 100/110mm 41 125/140mm 42 150/160/180mm 43 200/225mm 44 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)In all type Soil 45 80mm 46 100mm 47 150mm 48 200mm 49 250mm 50 FOR BT ROAD 51 80mm 52 100mm 53 150mm 54 200mm 55 250mm 56 FOR CC ROAD 57 80mm 58 100mm 59 150mm 60 200mm 61 250mm 62 Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line above 1.5 mtr and up to 3.0 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)In all type Soil 63 80mm 64 100mm 65 150mm 66 200mm 67 250mm 68 FOR BT ROAD 69 80mm 70 100mm 71 150mm 72 200mm 73 250mm 74 300mm 75 FOR CC ROAD 76 80mm 77 100mm 78 150mm 79 200mm 80 250mm 81 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtrdepth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil 82 50/63/75mm 83 80/90mm 84 100/110mm 85 125/140mm 86 150/160/180mm 87 200/225mm 88 250/280mm 89 FOR BT ROAD 90 50/63/75mm 91 80/90mm 92 100/110mm 93 150/160/180mm 94 200/225mm 95 250/280mm 96 For CC Road 97 50/63/75mm 98 80/90mm 99 100/110mm 100 125/140mm 101 150/160/180mm 102 200/225mm 103 250/280mm 104 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line above 1.5 mtrand up to 3.0 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil 105 50/63/75mm 106 80/90mm 107 100/110mm 108 125/140mm 109 150/160/180mm 110 200/225mm 111 250/280mm 112 For BT Road 113 50/63/75mm 114 80/90mm 115 100/110mm 116 150/160/180mm 117 200/225mm 118 250/280mm 119 300/315mm 120 400mm 121 For CC Road 122 50/63/75mm 123 80/90mm 124 100/110mm 125 125/140mm 126 150/160/180mm 127 200/225mm 128 250/280mm 129 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil 130 80 mm 131 100 mm 132 150 mm 133 200 mm 134 For BT Road 135 80 mm 136 100 mm 137 150 mm 138 200 mm 139 For CC Road 140 80 mm 141 100 mm 142 150 mm 143 200 mm 144 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line above 1.5 mtr and up to 3 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil 145 80 mm 146 100 mm 147 150 mm 148 200 mm 149 250 mm 150 For BT Road 151 80 mm 152 100 mm 153 150 mm 154 200 mm 155 300 mm 156 For CC Road 157 80 mm 158 100 mm 159 150 mm 160 200 mm 161 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type soil 162 75 mm 163 90/80 mm 164 110/100 mm 165 180/160/150 mm 166 225/200 mm 167 For BT Road 168 75 mm 169 90/80 mm 170 110/100 mm 171 180/160/150 mm 172 225/200 mm 173 For CC Road 174 75 mm 175 90/80 mm 176 110/100 mm 177 180/160/150 mm 178 225/200 mm 179 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line above 1.5 mtr and up to 3.0 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil 180 75 mm 181 90/80 mm 182 110/100 mm 183 180/160/150 mm 184 225/200 mm 185 For BT Road 186 75 mm 187 90/80 mm 188 110/100 mm 189 180/160/150 mm 190 225/200 mm 191 For CC Road 192 75 mm 193 90/80 mm 194 110/100 mm 195 180/160/150 mm 196 225/200 mm 197 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil 198 80 mm 199 100 mm 200 150 mm 201 225/200 mm 202 For BT Road 203 80 mm 204 100 mm 205 150 mm 206 225/200 mm 207 For CC Road 208 80 mm 209 100 mm 210 150 mm 211 225/200 mm 212 Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line above 1.5 mtr and up to 3.0 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil 213 80 mm 214 100 mm 215 150 mm 216 225/200 mm 217 For BT Road 218 80 mm 219 100 mm 220 150 mm 221 225/200 mm 222 For CC Road 223 80 mm 224 100 mm 225 150 mm 226 225/200 mm 227 Disconnection of water connection or Illigal connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. 228 For BT Road 229 For CC Road 230 Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil 231 80 mm dia pipe to 100mm 232 125 mm dia pipe to 150mm 233 200 mm dia pipe to 250mm 234 For BT Road 235 80 mm dia pipe to 100mm 236 125 mm dia pipe to 150mm 237 200 mm dia pipe to 250mm 238 For CC Road 239 80 mm dia pipe to 100mm 240 125 mm dia pipe to 150mm 241 200 mm dia pipe to 250mm 242 Removal of sluice valve in existing pipe line above 1.5 mtr & up to 3.0 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil 243 80 mm dia pipe to 100mm 244 125 mm dia pipe to 150mm 245 200 mm dia pipe to 250mm 246 For BT Road 247 80 mm dia pipe to 100mm 248 125 mm dia pipe to 150mm 249 200 mm dia pipe to 250mm 250 For CC Road 251 80 mm dia pipe to 100mm 252 125 mm dia pipe to 150mm 253 200 mm dia pipe to 250mm 254 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtrdepth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type soil 255 80 mm to 110 mm 256 125 mm to 165 mm 257 For BT Road 258 80 mm to 110 mm 259 125 mm to 165 mm 260 For CC Road 261 80 mm to 110 mm 262 125 mm to 165 mm 263 Work of Inter Connection in AC/PVC/HDPE pipe line above 1.5 mtr and up to 3.0 depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil 264 80 mm to 110 mm 265 125 mm to 165 mm 266 For BT Road 267 80 mm to 110 mm 268 125 mm to 165 mm 269 For CC Road 270 80 mm to 110 mm 271 125 mm to 165 mm 272 200 mm to 300 mm 273 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil 274 80 mm to 100 mm 275 125 mm to 150 mm 276 For BT Road 277 80 mm to 100 mm 278 125 mm to 150 mm 279 For CC Road 280 80 mm to 100 mm 281 125 mm to 150 mm 282 200 mm to 300 mm 283 Work of Inter Connection in CI/DI/MS pipe line above 1.5 mtr and up to 3.0 depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil 284 80 mm to 100 mm 285 125 mm to 150 mm 286 For BT Road 287 80 mm to 100 mm 288 125 mm to 150 mm 289 For CC Road 290 80 mm to 100 mm 291 125 mm to 150 mm 292 Labour charges for removal of complaint of polluted water supply to the consumers 293 Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours 294 Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 295 50 to 75 mm 296 80-110 mm 297 125 to 165 mm 298 For BT Road 299 50 to 75 mm 300 80-110 mm 301 125 to 165 mm 302 For CC Road 303 50 to 75 mm 304 80-110 mm 305 125 to 165 mm 306 Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesabove 1.5 mtr and up to 3.0 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 307 50 to 75 mm 308 80-110 mm 309 125 to 165 mm 310 For BT Road 311 50 to 75 mm 312 80-110 mm 313 125 to 165 mm 314 For CC Road 315 50 to 75 mm 316 80-110 mm 317 125 to 165 mm 318 Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 319 80-100 mm 320 125 to 150 mm 321 For BT Road 322 80-100 mm 323 125 to 150 mm 324 For CC Road 325 80-100 mm 326 125 to 150 mm 327 Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesabove 1.5 mtr and up to 3.0 depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 328 80-100 mm 329 125 to 150 mm 330 For BT Road 331 80-100 mm 332 125 to 150 mm 333 For CC Road 334 80-100 mm 335 125 to 150 mm 336 Restoration of bitumen road by patch work of WBM using crushed/broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of Engineer in charge. the rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. 337 Restoration of CC road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete (M-20) minimum thickness 200 mm up to the satisfaction of Engineer in charge. the rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.