Tender For Annual Maintenance Work For Water Supplyscheme,`Operation And Maintenance A /Mtc Scheme For 8 Month I.E. Pumping Machinery, Leakages Of Pipe Line And Consumable Etc. In Village Nayagaon And All Other Works Contingent Thereto.
Tender Overview
Project Description
Annual maintenance Work for Water SupplyScheme,`Operation and maintenance A /mtc scheme for 8 Month i.e. Pumping Machinery, Leakages of Pipe line and consumable etc. in village Nayagaon and all other works contingent thereto.--- 1 All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months) 2 Comprehensive Maintenance and repair of existing distribution as well as head work pipelines of all types (DI/CI/AC/PVC) removal and relaying IPB, including IPB block if required, demolising C/C by Mechnical /Manualand all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional Water supply connections. Work includes excavation on any surface, bailing out, refilling i.e. Soil etc.material and labour cost, machine/equipment hire Including cost and repair/replacement of newSluice valves components of all sizes (M.S. spindle, G.M. chuck nut and CI special, nut bolts, rubber jain, glain dori, grease, etc.). Includes opening/fitting, carriage charges from site toworkshop and back at site and all repair related works as per Engineer-in-Charge`s direction, complete in all respects. (August 2025 to March 2026 = Total 8 Months) 3 Provision for Consumeables Items i.e. Bush , cotton, Glain Dori, Grease, Lubricant oil, Mobil oil, Nut and Bolt, Rubber Sheet, Transformer Oil etc.(August 2025 to March 2026 = Total 8 Months)
BOQ
| Sl. No. | Item Description |
| 1 | All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months) |
| 2 | Comprehensive Maintenance and repair of existing distribution as well as head work pipelines of all types (DI/CI/AC/PVC) removal and relaying IPB, including IPB block if required, demolising C/C by Mechnical /Manualand all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional Water supply connections. Work includes excavation on any surface, bailing out, refilling i.e. Soil etc.material and labour cost, machine/equipment hire Including cost and repair/replacement of newSluice valves components of all sizes (M.S. spindle, G.M. chuck nut and CI special, nut bolts, rubber jain, glain dori, grease, etc.). Includes opening/fitting, carriage charges from site toworkshop and back at site and all repair related works as per Engineer-in-Charge`s direction, complete in all respects. (August 2025 to March 2026 = Total 8 Months) |
| 3 | Provision for Consumeables Items i.e. Bush , cotton, Glain Dori, Grease, Lubricant oil, Mobil oil, Nut and Bolt, Rubber Sheet, Transformer Oil etc.(August 2025 to March 2026 = Total 8 Months) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender