

Metro Railway has published Tender For Engineering, Design And Construction Of Viaduct Length 38.40 Kms (Including 4.33 Kms Of Double Decker 4 Lane Flyover Cum Metro Viaduct) 01 Nos. Underground Metro Station And 32 Nos Elevated Metro Stations, Etc. All As Specified On EPC Basis For. Submission Date for this Tender is 17-09-2025. Bridge Work Tenders in Vijayawada Andhra Pradesh. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
Click here to download tender document | Tender Documents | 0 KB |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail