| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. By Manual Means |
| 2 | Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average cutting and filling with earth up to 150 mm average thickness finished with outward cross grade of 1 in 30 (Extra quantity of earth for filling shall be obtained from road side borrow pits.) cutting and filling with earth up to 150 mm average thickness finished with outward cross grade of 1 in 30 (Extra quantity of earth for filling shall be obtained from road side borrow pits.) |
| 3 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement)(ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) |
| 4 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator atOMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 ofSpecifications for Road & Bridge Works of MoRT&H (5th Revision) (iv) For Construction of Sub Base by compacting river bed materials.Add cost at site of 1.28 m³ of materials to arrive at the complete rate |
| 5 | Providing and laying Design Mix concrete for plain/ reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork &reinforcement works |
| 6 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. |
| 7 | Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) |
| 8 | Add GST 18% |
| 9 | Add Cess 1 % |