| 1 | Part 01 : Construction of Waitingshed, Culvert and Providing Paverblock Pavement at Keelmathinipatty burialground in Sriramapuram panchayatEstimate Amount Rs.15.00 Lakhs |
| 2 | Waiting shed |
| 3 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 5 | Refilling the excavated earth including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 6 | Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. |
| 7 | Supply & erection of centering for sides & soffits of all R.C.C. worksincluding cost & conveyance of all materials to site and all labour charges etc., complete. |
| 8 | Below GL |
| 9 | Above GL |
| 10 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. |
| 11 | RCC 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete |
| 12 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing.The Surface shall then be allowed to dry for atleast 48 hours.It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface.Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete].The Putty shoule be got approved by the Executive Engineer before use on work. |
| 13 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete. |
| 14 | Cement Concrete 1:2:4 mix using 20mm ISS HBG Metal including cost & conveyance of all materials to site and all labour charges etc., complete. |
| 15 | Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete. |
| 16 | Construction of Culvert |
| 17 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. |
| 18 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 19 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Below sill |
| 20 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Above sill |
| 21 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Above sill |
| 22 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Above sill |
| 23 | Supply & erection of centering for sides & soffits of all R.C.C. worksincluding cost & conveyance of all materials to site and all labour charges etc., complete. |
| 24 | Below Sill |
| 25 | Above Sill |
| 26 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. |
| 27 | Supplying and Filling of Gravel including cost & conveyance of steel as per std. Specification etc., complete. |
| 28 | Providing Paver Block Pavement |
| 29 | Earthwork excavation for foundation in all clauses of soils and subsoils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, struting and bailing out water wherever neccessary and refilling the sides of foundation |
| 30 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 31 | Supplying and erecting centering for sides & soffits including supports and strutting up to 3.29m height for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cm x 60cm and 10 gauge stiffened welded with mild steel angl |
| 32 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 33 | Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and |
| 34 | Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec |
| 35 | Provision forName Board |
| 36 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |