|
| 1 | Maintenance Work |
| 2 | Maintenance of PNG Domestic Connection in Multi Storied Apartments (Lateral Piping only Excluding riser)Covers coordination with customer & society, Testing (pneumatic), leakage identification & rectification and paint touchup of GI/ Cu piping. Installation of clamps (where ever required), Emergency no marking, inspection of rubber tube, checking of Meter working in gas flow condition, PVC sleeve installation, restoration with white cement, taking photo of installation, verification and updation of Consumer Number-Address-Contact details-Meter no,Checking of unauthorized tapping & checking of meter and regulator O-ring adaptors, checking of alignment, checking and rectification of leakage from all joints. Painting of plate marker & associated fittings and Supply of any material like pipe fitting (elbow, tee, etc) or valves shall be paid seprately under different SOR item covered in SOR part B or C as applicable with approval of EIC. |
| 3 | Maintenance of PNG Domestic Connection in Individual Row Houses Covers coordination with customer, society. Testing (pneumatic), leakage identification & rectification and paint touchup of GI/ Cu piping. Installation of clamps (where ever required), Emergency no marking, inspection of rubber tube,checking of Meter working in gas flow condition, PVC sleeve installation, restoration with white cement, taking photo of installation, verification and updation of Consumer Number-Address-Contact details-Meter no, Checking of unauthorized tapping & checking of meter and regulator O-ring adaptors, checking of alignment, checking and rectification of leakage from all joints. Painting of plate marker & associated fittings and Supply of any material like pipe fitting (elbow, tee, etc) or valves shall be paid seprately under different SOR item covered in SOR part B or C as applicable with approval of EIC. |
| 4 | Maintenance of GI Pipeline (Risers) All Dia (Multi storied apartments)Covers coordination with society, customers, Testing (pneumatic), leakage identification & rectification, Paint touch up, clamping, riser number Riser marking, data verification, taking site photos etc. Painting of plate marker & associated fittings and Supply of any material like pipe fitting (elbow, tee, etc) or valves shall be paid seprately under different SOR item covered in SOR part B or C as applicable with approval of EIC. |
| 5 | Replacement of Regulator all sizes & typesRegulators shall be provided by BGCL as free issue. |
| 6 | Domestic Meter replacement/ Reconnection, without alteration includes replacement of faulty Meter with new one or Installation of Meter without alteration in GI or Cu Piping. |
| 7 | Temporary Disconnection of Domestic PNG Connection Include coordination with customer, schedule the activity, complete the job within timeline etc. Contractor will be required to remove regulator as per EIC instruction. Proper blind plugging is to be done after removal of regulator, checking for leakages if any from TF or Regulator piece upto isolation valve and handing over all the material to customer/BGCL as per site requirement for safe custody. |
| 8 | Permanent Dissconnection of Domestic PNG Connection (without TF removal)Include coordination with customer, schedule the activity, complete the job within timeline etc. Contractor will be required to remove regulator and meter, Copper pipe/GI pipe, isolation valve, restore the hole etc. by isolating and end plugging/blinding and safe taking over all the asset from customer tohanding over to BGCL store (including transpotation) with safety and as per satisfaction of EIC.Removal of GI pipe shallbe paid seprately under SOR No. 11 with approval of EIC and as per satisfaction of EIC. |
| 9 | Permanent Dissconnection of Domestic PNG Connection (withTF removal) Include coordination with customer, schedule the activity, complete the job within timeline etc. Contractor will be required to remove regulator and meter, Copper pipe/GI pipe, isolation valve, restore the hole etc. Removal of Transition Fitting by isolating and end plugging/blinding the PE Pipe, restoring the pits as per earlier condition and safe taking over all the asset from customer tohanding over to BGCL store (including transpotation) with safety and as per satisfaction of EIC.Removal of GI pipe, Excavation for TF removal, restoration of pit shall be paid seprately under SOR No. 11 &13 respectively with approval of EIC and as per satisfaction of EIC. |
| 10 | Excavation& Backfilling of pipelineFor all type of soil conditions and topography the trench shall be excavated and finished to the dimensions for all kind of soil sand mild rocks for a width of D+500 mm on each side of pipe and exposing the pipeline from top up to 500 mm below the bottom of Pipeline including the stacking of excavated earth, leadup to 50 m, stacked earth to be leveled and neatly dressed as per directions of EIC. Backfilling excavated earth (excluding rock) in trenches in layers not exceeding 20 cm in depth, consolidating each Deposited layer by ramming, compacting and watering, as per the directions of EIC. |
| 11 | Breaking and Restoration (any surface) |
| 12 | Removal of GI Pipe (Threaded or Welded) all sizeIncludes coordination, Isolation of Pipeline, decommissioning, removal, cutting, dismantling, trasportation, dismantling survey, installation of MCV-II with isolation & plug of MCV-I etc. handling over to customer/BGCL as per site requirement for safe custody. |
| 13 | Construction of TF Pedestal with sand filling etc.It includes construction of new Pedastal, GI Sleeve, marking, sand filling etc. as per satisfaction and approval of EIC. |
| 14 | Sand filling of TF PedestalIt includes minor repair of pedestal with sand filling, as per satisfaction and instruction of EIC. |
| 15 | Monitoring, health check and repair of SR foundation with sand filling etc. It includes the rectification during routine monitoring or Emergency work etc. by repairing the SR foundation, GI/ HDPE Sleeve installation, Painting, sand filling, marking of SR No, Emergency NO etc. as per satisfaction and approval of EIC |
| 16 | Supply & laying Plain Cement Concrete PCC (1:4:8) |
| 17 | Supply & laying Reinforced Cement Concrete RCC (1:1.5:3) including reinforcement |
| 18 | Refitting, Rerouting, Modification of Domestic PNG connection (GI 1/2\")It includes the reconnection with alteration, modification, replacement, GI extension-modification, copper extension-modification . Relocation of meter etc. Supply of any material shall be paid seprately i.e SOR part C with approval of EIC. |
| 19 | Modification / Alteration refitting GI Piping 1\"\" or 3/4\"as per scope of SOR -17 (supply of GI pipe shall be paid under SOR part C with approval of EIC) |
| 20 | Conversion of Domestic BurnerConversion of all types of LPG kitchen appliances to NG based appliances, supply & changing of nozzles, rubber hose of Type 4, jets and associated controls for domestic / commercial customers & imported appliances with proper tools & tackles.Cleaningand performing minor maintenance, greasing etc of appliance, testing/ showing performance to the customer, signing of joint meter records (JMR) and instructing customer on use & safety norms, complete as per specifications & to satisfaction of Owner/ EIC. Conversion: 3 days from the date of award of front after RFC |
| 21 | Maintenance of Industrial &Commercial ConnectionCoordination with authority, customers, testing, leakage identification & rectification, checking of internal piping route, Paint touchup of BGCL Piping,Filter cleaning of MRS/ meter inlet,Oil filling,etc.as per satisfaction of EIC. Supply of material (if any) is applicable from SOR part Bwith approval of EIC. (Oil for meter required shall be provided by BGCL) |
| 22 | Re-connection / Re-routing of industrial & Commercial Connection. Re-connection with same Meter / Meter Sizewith or without Rerouting / Modification in GI Piping, . De-commissioning, testing & purging of Pipeline, commissioning, Marking of Gas flow direction, Customer identification with supply of all fittings, consumables, Meter support, clamp etc.,cleaning of MRS, filter cleaning, oil filling (if required). Additional GI pipe (all size) if required shall be paid under SOR Part B. |
| 23 | Replacement of Meter RPD / Diaphragm including transporation |
| 24 | Replacement of MRS ( Skid, Meter, EVC & NRV and associated works) including transportation to & from BGCL stores. (Rates include all nut bolts, washers, fittings gaskets etc)Meter, EVC, Junction Box, Battery box, NRV etc |
| 25 | Replacement of MRS ( Skid, Meter, EVC & NRV and associated works) including transportation to & from BGCL stores. (Rates include all nut bolts, washers, fittings gaskets etc)Skid |
| 26 | Abandon UG PE supply line (any size)Scope includes isolation,venting, inertization, excavation, removal, backfilling and restoration of affected area and hiring charges of required eqipments and manpower. |
| 27 | MDPE pipeline Laying, jointing, testing and commissioning in all kind of surfaces (normal, unprepared, built-up, hard surface of any kind like asphalted, concrete, tiled, paved, brick lined, etc.) by any method (open cut/molling/directional drilling, etc confirming to statutory permissions) in all type of soil strata. Only MDPE pipes & PE valves shall be provided by BGCL. (All EF fittings shall be in Contractor\"s scope)- 20mm |
| 28 | MDPE pipeline Laying, jointing, testing and commissioning in all kind of surfaces (normal, unprepared, built-up, hard surface of any kind like asphalted, concrete, tiled, paved, brick lined, etc.) by any method (open cut/molling/directional drilling, etc confirming to statutory permissions) in all type of soil strata. Only MDPE pipes & PE valves shall be provided by BGCL. (All EF fittings shall be in Contractor\"s scope)- 32mm |
| 29 | MDPE pipeline Laying, jointing, testing and commissioning in all kind of surfaces (normal, unprepared, built-up, hard surface of any kind like asphalted, concrete, tiled, paved, brick lined, etc.) by any method (open cut/molling/directional drilling, etc confirming to statutory permissions) in all type of soil strata. Only MDPE pipes & PE valves shall be provided by BGCL. (All EF fittings shall be in Contractor\"s scope)- 63mm |
| 30 | MDPE pipeline Laying, jointing, testing and commissioning in all kind of surfaces (normal, unprepared, built-up, hard surface of any kind like asphalted, concrete, tiled, paved, brick lined, etc.) by any method (open cut/molling/directional drilling, etc confirming to statutory permissions) in all type of soil strata. Only MDPE pipes & PE valves shall be provided by BGCL. (All EF fittings shall be in Contractor\"s scope)-90mm |
| 31 | MDPE pipeline Laying, jointing, testing and commissioning in all kind of surfaces (normal, unprepared, built-up, hard surface of any kind like asphalted, concrete, tiled, paved, brick lined, etc.) by any method (open cut/molling/directional drilling, etc confirming to statutory permissions) in all type of soil strata. Only MDPE pipes & PE valves shall be provided by BGCL. (All EF fittings shall be in Contractor\"s scope)-125mm |
| 32 | Construction of new MDPE valve chamber with pre-cast cover(1m*1m*1.50m as per attached drawing) |
| 33 | Pre Cast cover of existing MDPE line valve chamberwith painting and stencilling as per BGCL standard |
| 34 | Refurbishment & revamping of old MDPE valve chamber with painting, cleaning & sand filling as per specification defined in scope of work. This includes repairs to plaster work, minor brick work or concreting as required, fixing the collar frame for top cover (if reqd), so as to make the valve chamber fully operational |
| 35 | Cleaning, White washing of Valve chamber including Stencilling on top cover and sand filling as BGCL standard |
| 36 | Sand filling in valve chamber |
| 37 | Supply & installation charges of RCC route marker as per drawing |
| 38 | Supply & installation charges of pole marker as per drawing |
| 39 | Cleaning, Repainting and stencilling of pole marker as per BGCL standard |
| 40 | Supply & installation charges of Plate marker as per drawing |
| 41 | Cleaning, Repainting and stencilling of Plate marker as per BGCL standard |
| 42 | Hiring of JCB for excavation or other works includes cost of fuel, driver/operator fuel etc. for excavation in all types of soil during pipeline repair / restoration works, other maintenance jobs etc.Operating time of Earth Moving Equipment (JCB) shall be considered from the time of deployment at site. |
| 43 | Supply, Fabrication & erection all kind of steel works (including all associates fittings, labour welding etc) (all kinds of angles, I beams, channels etc for Valve chamber frames, shades, trench covers etc) |