

The Andhra Pradesh Metro Rail Corporation Limited has published Engineering, Design And Construction Of Viaduct Length 46.23 Kms (3 Corridors) (Including 20.16 Kms Of Double Decker 4 Lane Flyover Cum Metro Viaduct) And 42 Nos. Elevated Metro Stations, Etc., All As Specified On Epc Basis For Phase-1 Of Visakhapatnam Me. Submission Date for this Tender is 12-09-2025. Bridge Work Tenders in Visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
Click here to download tender document | Tender Documents | 0 KB |
Click here to download tender document | Tender Documents | 0 KB |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail