

The Andhra Pradesh Metro Rail Corporation Limited has published Engineering, Design And Construction Of Viaduct Length 46.23 Kms (3 Corridors) (Including 20.16 Kms Of Double Decker 4 Lane Flyover Cum Metro Viaduct) And 42 Nos. Elevated Metro Stations, Etc., All As Specified On Epc Basis For Phase-1 Of Visakhapatnam Me. Submission Date for this Tender is 10-10-2025. Bridge Work Tenders in Visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrigendum | CorrigendumType | NewSubmissionDate |
1 | 01-09-2025 | Corrigendum-2 | 07-10-2025 | |
2 | 16-09-2025 | Extension date for uploading of Addendum/ Pre-Bid Clarifications | 07-10-2025 | |
3 | 19-09-2025 | Corrigendum-4 | 10-10-2025 | |
4 | 20-08-2025 | Extension of uploading of Addendum / Pre-Bid Clarifications | 12-09-2025 | |
5 | 20-09-2025 | Addendum-1 | 10-10-2025 | |
6 | 22-09-2025 | Addendum-1 | 10-10-2025 |
FileName | File Description | File Size |
Click here to download tender document | Tender Documents | 0 KB |
Click here to download tender document | Tender Documents | 0 KB |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail