Year 2025-26 Yojna To Connect Tehsil Block Headquarters With 2 Lanes Widening Of Chandausi Berni Reeth Bazaar Marg (Odr) - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 2 Construction of Embankment with approved material obtained form roadside with all lifts and leads, transporting to site, spreading, grading torequired slope and compecting to meet requirement of table 300-2. and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 3 Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 4 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 5 Providing and applying primer coat with SS -2 grade bitumen emulsionon prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 6 Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 7 Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 8 Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 9 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curingSpec 12.04 2100 and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 10 Plain Cement Concrete RCC Grade M20 using batching plant transit mixer & manual placing in Open Foundation complete as per Drawing and Technical Specifications. 12.08 1500, 1700 & 2100 C case II and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 11 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications14.2 1600 and supply of all meterials, labour and T&P etc. required for proper completion of work but excluding GST 12 Mantinance Part B @ 2.50% 13 Maintenance of constructed Bituminous road next five year after completion the contractor shall be paid total maintenance cost 2.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)For 1st Year 0.00% 14 Item No. 13 but for 2nd year 0.25% 15 Item No. 13 but for 3rd year 0.50% 16 Item No. 13 but for 4th year 0.75% 17 Item No. 13 but for 5th year 1.00%