| 1 | Cost for Installation of 600 kW Grid Connected Solar Power Plants at 132/33 kV Elangkhangpokpi Power Sub-Station, Kakching District, Manipur, as per specifications mentioned in the tender document. |
| 2 | Project Cost for Installation of 600 kWp Grid connected SPV Power Plant (Ground Mounted) at 132/33 kV Elangkhangpokpi Power Sub-Station , Kakching District, Manipur including 5 years Maintenance and Performance Warranty Contract (MPWC) without taxes. (1.02+1.03+1.04+1.05+1.06) |
| 3 | Cost of Materials comprising of Solar Modules, Grid connected Inverter and accessories such a structures, cables, distribution boxes, net meter, solar meter, earthing kits, lightning arrestor etc. |
| 4 | Installing and Commissioning Cost |
| 5 | Maintenance and Performance Warranty Contract (MPWC) upto 5 years from the date of commissioning |
| 6 | Oil-cooled inverter duty transformer including all necessary cables, switches, safety equipments and accessories, as per specifications mentioned in the tender document. |
| 7 | Site preparation and civil work including but not limited to site assessment, survey, contouring, clearing vegetation and debris, grading and leveling the land, conducting soil tests, drainage systems, pathways etc. |
| 8 | GST12% on Sl. No. 1.02 |
| 9 | GST18% on Sl. No. 1.03 |
| 10 | GST18% on Sl. No. 1.04 |
| 11 | GST18% on Sl. No. 1.05 |
| 12 | GST12% on Sl. No. 1.06 |
| 13 | Total Cost of the Project with taxesSl. Nos. (1.01+1.07+1.08+1.09+1.1+1.11) |
| 14 | State Govt. Charges: |
| 15 | Labour Cess @1% on Sl. No. 1.03. |
| 16 | Labour Cess @1% on Sl. No. 1.04. |
| 17 | Labour Cess @1% on Sl. No. 1.06. |
| 18 | Contingency Charge @3% on Sl. No. 1.03. |
| 19 | Contingency Charge @3% on Sl. No. 1.04. |
| 20 | Contingency Charge @3% on Sl. No. 1.06. |
| 21 | Grand Total Cost of the Project with taxes and charges Sl. Nos. (1.12+1.14+1.15+1.16+1.17+1.18+1.19) |
| 22 | Cost for Installation of 800 kW Grid Connected Solar Power Plants at 132/33 kV Kakching Power Sub-Station, Kakching District, Manipur, as per specifications mentioned in the tender document. |
| 23 | Project Cost for Installation of 800 kWp Grid connected SPV Power Plant (Ground Mounted) at 132/33 kV Kakching Power Sub-Station, Kakching District, Manipur including 5 years Maintenance and Performance Warranty Contract (MPWC). (2.02+2.03+2.04+2.05+2.06) |
| 24 | Cost of Materials comprising of Solar Modules, Hybrid Inverter, Battery Bank and accessories such a structures, cables, distribution boxes, earthing kits, lightning arrestor etc. including Transportation. |
| 25 | Installing and Commissioning Cost |
| 26 | Maintenance and Performance Warranty Contract (MPWC) |
| 27 | Oil-cooled inverter duty transformer including all necessary cables, switches, safety equipments and accessories, as per specifications mentioned in the tender document. |
| 28 | Site preparation and civil work including but not limited to site assessment, survey, contouring, clearing vegetation and debris, grading and leveling the land, conducting soil tests, drainage systems, pathways etc. |
| 29 | GST12% on Sl. No. 2.02. |
| 30 | GST18% on Sl. No. 2.03. |
| 31 | GST18% on Sl. No. 2.04. |
| 32 | GST18% on Sl. No. 2.05. |
| 33 | GST12% on Sl. No. 2.06. |
| 34 | Total Cost of the ProjectSl. Nos. (2.01+2.07+2.08+2.09+2.1+2.11) |
| 35 | State Govt. Charges: |
| 36 | Labour Cess @1% on Sl. No.2.03. |
| 37 | Labour Cess @1% on Sl. No. 2.04. |
| 38 | Labour Cess @1% on Sl. No. 2.06. |
| 39 | Contingency Charge @3% on Sl. No. 2.03. |
| 40 | Contingency Charge @3% on Sl. No. 2.04. |
| 41 | Contingency Charge @3% on Sl. No. 2.06. |
| 42 | Grand Total Cost of the Project Sl. Nos. (2.12+2.14+2.15+2.16+2.17+2.18+2.19) |
| 43 | Cost for Installation of 5 MW Grid connected Floating Solar Power Plant at Thoubal Multi-purpose Project Reservoir near Chadong Village of Kamjong District, Manipur,as per specifications mentioned in the tender document. |
| 44 | Project Cost for Installation of 5 MW (AC) Grid connected Floating solar PV Power Plant (Float Mounted) at Thoubal Multipurpose Project Reservoir, Kamjong District, Manipur including 5 years Maintenance and Performance Warranty Contract (MPWC) (3.02+3.03+3.04+3.05+3.06+3.07) |
| 45 | Cost of Materials comprising of Solar Modules, Floating system, mooring and anchoring, Grid Inverter and accessories, cables, distribution boxes, net meter, solar meter, earthing kits, lightning arrestor etc. |
| 46 | Installing and Commissioning Cost |
| 47 | Maintenance and Performance Warranty Contract (MPWC) |
| 48 | 800V/33kV, 6.25 MVA transformer station complete with 5 kVA Auxiliary Transformer, LV & HV switchgear and control & relay panel (In a 20 feet ISO container) |
| 49 | 33 kV transmission line with 100 mm2 ACSR conductor & transmission poles for evacuation power at substation [6.5 km approx.] |
| 50 | Site preparation and civil work including but not limited to site assessment, survey, clearing vegetation and debris, grading and leveling the land for construction of launch ramp and control room, etc. |
| 51 | GST12% on Sl. No. 3.02. |
| 52 | GST18% on Sl. No.3.03 |
| 53 | GST18% on Sl. No.3.04 |
| 54 | GST18% on Sl. No.3.05 |
| 55 | GST18% on Sl. No. 3.06. |
| 56 | GST12% on Sl. No. 3.07. |
| 57 | Total Cost of the ProjectSl. Nos. (3.01+3.08+3.09+3.1+3.11+3.12) |
| 58 | State Govt. Charges: |
| 59 | Labour Cess @1% on Sl. No. 3.03. |
| 60 | Labour Cess @1% on Sl. No. 3.04. |
| 61 | Labour Cess @1% on Sl. No. 3.07. |
| 62 | Contingency Charge @3% on Sl. No. 3.03. |
| 63 | Contingency Charge @3% on Sl. No. 3.04. |
| 64 | Contingency Charge @3% on Sl. No. 3.07. |
| 65 | Grand Total Cost of the Project Sl. Nos. (3.13+3.15+3.16+3.17+3.18+3.19+3.2) |
| 66 | Grand Total Cost of the Project of 600 kW, 800 kW & 5 MW (floating) |