| 1 | Designing, providing, fixing, testing and commissioning of GASEOUS CHLORINATION SYSTEMhavingcapacity upto 2000 grams/ hrs. as designed having the control of gas upto 20th part of max. dose . The complete system consists of (a) Vacuum regulator (b) Measuring Glass Tube (c ) Ejector (d) PF tubing (e) Spanner with cylinder opening key (f) Ammonia Gas (Liquid for leaking test) (g) 1’ dia PVC pipe with PVC fitting, ball valves etc. (h) 2 Nos. chlorine gas cylinder capacity 100 Kg. duly certified and approved by BIS and Explosive Department Govt. of India (i) Electronic Chlorine gas leak detector with sensor and hooter (j) Full face mask with canister as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 2 | Designing, providing, fixing, testing and commissioning of CHLORINE GASDRYSCRUBBERaspertechnical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 3 | Designing, providing, fixing, testing and commissioning of AUTO-SHUT OFF VALVE as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070- 23142 dated 28-02-2024 |
| 4 | Designing, providing, fixing, testing and commissioning of ONLINE COLORIMETRIC WATER QUALITY ANALYZER as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070- 23142 dated 28-02-2024 |
| 5 | Designing, providing, fixing, testing and commissioning of VACUUM- OPERATED AUTOMATIC SWITCHOVERSYSTEMasper technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 6 | Designing, providing, testing and commissioning of genset of 10 KVA 3 phase, 4 wire, 50 cycles 415plus (-)1% volts AC alternator coupled directly through a set of flexible coupling on a common MS fabricated base frame with engine complete with suitable size incoming cable from generator to change over/AMF panel for chlorine gas dry scrubbing system complete as per following detailed scope and specifications and directions of Engineer-in-charge |
| 7 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 1st year after trial period of three months and defect liability period of one year |
| 8 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 2nd year |
| 9 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 3rd year |
| 10 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 4th year |
| 11 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 5th year |