|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks |
| 2 | Earth work in excavation for roadway, including trimming bottom andside slopes in accordance with requirement of line, grades and crosssections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301. In all type of soil |
| 3 | Providing and Laying in Position Cement ConcreteOf Specified grade excluding the cost of centring and shuttering All work Upto Plinth Level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). |
| 4 | Random rubble masonary with Hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinthlevel : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 6 | Brick Work with machine moulkded perforated bricks of class designatiuon 125 confirming to IS 2222-1991 in super structure above plinth level upto two stories in cement mortar (1:6) (1 Cement : 6 coarse sand ) With Modular Bricks |
| 7 | Cement plastering including T&P, scaffolding, material and completelabour, including cost of water, curing, racking of joints etc. with 12mm cement plaster of mix : including Providing /mixing of syntheticfibers compulsorily complying with IS 16481:2022 of 06 mm/12 mmlength to be mixed @ 0.25% by weight of Cement i.e. 125 gms per50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying ariming coat of approved steel primer all complete: |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Mild steel and Medium Tensile steel bars. |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) includingstrutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. |
| 11 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Greading III |
| 12 | Supplying and fixing in walls machine cut and polished stone shelves, tands and in CM 1:3 with machine cut edges : Kota stone minimum 30mm thick |