Power Boards / Undertakings / PSU Closing in 0 days TDR #50338909

Tender For Construction Of 01 Nos New 33 Kvravi Solar Bay (10 Mw)At 132 Kv S/Smadhogarh Under Etd, Orai - Safely Carriage Of Structure Material Approx 7 Mt ( Cgm, Cgm, Xpm, Ymm, Ekr, Cpm ,Bbl, Bti, Bct, Alp, Abl Etc)From Efu Naini, Prayagraj To 132 Kv Sub

Issued by Boards / Undertakings / PSU · madhogarh, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Aug 2025
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
madhogarh → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Construction Of 01 Nos New 33 Kvravi Solar Bay (10 Mw)At 132 Kv S/Smadhogarh Under Etd, Orai - Safely carriage of structure material approx 7 MT ( CGM, CGM, XPM, YMM, EKR, CPM ,BBL, BTI, BCT, ALP, ABL etc)from EFU Naini, prayagraj to 132 KV Substation Madhogarh distance approx380 Km . The work includes sorting of structure &loading on private carrierand unloading of the same at 132 kV S/S Madhogarh(including toll tax etc.) 2 Erection of main structure for extension of 33 KV Transfer bus consisting of columns, peaks, beams, masts (CGM, CGM, XPM, YMM, EKR, CPM, ) etc and auxiliary structure ( BBL, BTI, BCT, ALP, ABL) required for installation of isolators, CTs, PTs,C.B., and all other equipments . The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site oferection, erection of structure as per relevant drawing and practice using flat and spring washers with each bolt. Matching of holes, cutting, fabrication of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost. 3 Erection of following equipments as per instructionmanual of various equipment and technical specification including shifting of material/equipments from store to erection site including all other associated work to complete the job satisfactorily. 4 33 KV CB 5 33 KV CT 6 33 KV LI 7 33 KV BI 8 33 KV Junction box 9 Interconnection of above equipments and bus bar including cutting, bending of conductor and jumpering along with all other associated work to complete the job satisfactorily as per drawing and technical specn. 10 33 KV side IxP 11 Earthing of main structure, auxiliary structure & various equipments structure installed including welding with main earthmat and with object to be earthed and painting with red oxide with one coat also painting with green enamel paint. 12 75x10 13 50x6 mm 14 25x6 mm 15 Laying of following size control cable in the cable trench from control relay panel to various equipments/ marshalling boxes and JB etc. in switchyard as per cableschedule. Its saddling at every 750mm. Distance with M.S. saddles of size 25x3mm. Size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification. 16 2C x 2.5 Sq. mm unarmoured. 17 4C x 2.5 Sq. mm unarmoured. 18 6Cx2.5 Sq. mm unarmoured. 19 Stringing of single panther24 Mtr transfer bus of 33 KV including fitting of tension clamps, hoisting of insulators, cutting of conductor including shifting of material from store to work site and and all the other associated work required for completion of jobs satisfactorily as per drawing and technical specification. 20 Termination of following sizes cables as laid above as per cable schedule including making necessary holes in glands plates or box where ever required fixing of cable glands of approx. made size and ferruling and Nos for each core. (The rates of termination of control cable including the all cores of cable at one end with lug.) 21 2C x 2.5 Sq. mm unarmoured. 22 4C x 2.5 Sq. mm unarmoured. 23 6Cx2.5 Sq. mm unarmoured. 24 Preparation of Inter connection diagram and cable schedule as per drawing to complete the job including CB, CT,panel and Isolator etc. 25 Erection & installation of 0.2 class accuracy ABT meter (main & check-02 Nos) with cubical panel. 26 Intregation of 33 KV bay with existing SCADA system at 132 KV S/S Madhogarh 27 The Rates qouted by the bidders should be without Taxes. Taxes to be paid extra, if applicable.

BOQ

Name of Work:CONSTRUCTION OF 01 NOS NEW 33 KVRAVI SOLAR BAY (10 MW)AT 132 KV S/SMADHOGARH UNDER ETD, ORAI
Sl. No. Item Description
1Safely carriage of structure material approx 7 MT ( CGM, CGM, XPM, YMM, EKR, CPM ,BBL, BTI, BCT, ALP, ABL etc)from EFU Naini, prayagraj to 132 KV Substation Madhogarh distance approx380 Km . The work includes sorting of structure &loading on private carrierand unloading of the same at 132 kV S/S Madhogarh(including toll tax etc.)
2Erection of main structure for extension of 33 KV Transfer bus consisting of columns, peaks, beams, masts (CGM, CGM, XPM, YMM, EKR, CPM, ) etc and auxiliary structure ( BBL, BTI, BCT, ALP, ABL) required for installation of isolators, CTs, PTs,C.B., and all other equipment\"s . The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site oferection, erection of structure as per relevant drawing and practice using flat and spring washers with each bolt. Matching of holes, cutting, fabrication of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
3Erection of following equipment\"s as per instructionmanual of various equipment and technical specification including shifting of material/equipment\"s from store to erection site including all other associated work to complete the job satisfactorily.
433 KV CB
533 KV CT
633 KV LI
733 KV BI
833 KV Junction box
9Interconnection of above equipment\"s and bus bar including cutting, bending of conductor and jumpering along with all other associated work to complete the job satisfactorily as per drawing and technical specn.
1033 KV side IxP
11Earthing of main structure, auxiliary structure & various equipment\"s structure installed including welding with main earthmat and with object to be earthed and painting with red oxide with one coat also painting with green enamel paint.
1275x10
1350x6 mm
1425x6 mm
15Laying of following size control cable in the cable trench from control relay panel to various equipment\"s/ marshalling boxes and JB etc. in switchyard as per cableschedule. Its saddling at every 750mm. Distance with M.S. saddles of size 25x3mm. Size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification.
162C x 2.5 Sq. mm unarmoured.
174C x 2.5 Sq. mm unarmoured.
186Cx2.5 Sq. mm unarmoured.
19Stringing of single panther24 Mtr transfer bus of 33 KV including fitting of tension clamps, hoisting of insulators, cutting of conductor including shifting of material from store to work site and and all the other associated work required for completion of jobs satisfactorily as per drawing and technical specification.
20Termination of following sizes cables as laid above as per cable schedule including making necessary holes in glands plates or box where ever required fixing of cable glands of approx. made size and ferruling and Nos for each core. (The rates of termination of control cable including the all cores of cable at one end with lug.)
212C x 2.5 Sq. mm unarmoured.
224C x 2.5 Sq. mm unarmoured.
236Cx2.5 Sq. mm unarmoured.
24Preparation of Inter connection diagram and cable schedule as per drawing to complete the job including CB, CT,panel and Isolator etc.
25Erection & installation of 0.2 class accuracy ABT meter (main & check-02 Nos) with cubical panel.
26Intregation of 33 KV bay with existing SCADA system at 132 KV S/S Madhogarh
27The Rates qouted by the bidders should be without Taxes. Taxes to be paid extra, if applicable.

AI Tender Summary

OUR REF NO 50338909
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 20-08-2025
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender For Construction Of 01 Nos New 33 Kvravi Solar Bay (10 Mw)At 132 Kv S/Smadhogarh Under Etd, Orai - Safely carriage of structure material approx 7 MT ( CGM, CGM, XPM, YMM, EKR, CPM ,BBL, BTI, BCT, ALP, ABL etc)from EFU Naini, prayagraj to 132 KV Substation Madhogarh distance approx380 Km . The work includes sorting of structure &loading on private carrierand unloading of the same at 132 kV S/S Madhogarh(including toll tax etc.) 2 Erection of main structure for extension of 33 KV Transfer bus consisting of columns, peaks, beams, masts (CGM, CGM, XPM, YMM, EKR, CPM, ) etc and auxiliary structure ( BBL, BTI, BCT, ALP, ABL) required for installation of isolators, CTs, PTs,C.B., and all other equipments . The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site oferection, erection of structure as per relevant drawing and practice using flat and spring washers with each bolt. Matching of holes, cutting, fabrication of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost. 3 Erection of following equipments as per instructionmanual of various equipment and technical specification including shifting of material/equipments from store to erection site including all other associated work to complete the job satisfactorily. 4 33 KV CB 5 33 KV CT 6 33 KV LI 7 33 KV BI 8 33 KV Junction box 9 Interconnection of above equipments and bus bar including cutting, bending of conductor and jumpering along with all other associated work to complete the job satisfactorily as per drawing and technical specn. 10 33 KV side IxP 11 Earthing of main structure, auxiliary structure & various equipments structure installed including welding with main earthmat and with object to be earthed and painting with red oxide with one coat also painting with green enamel paint. 12 75x10 13 50x6 mm 14 25x6 mm 15 Laying of following size control cable in the cable trench from control relay panel to various equipments/ marshalling boxes and JB etc. in switchyard as per cableschedule. Its saddling at every 750mm. Distance with M.S. saddles of size 25x3mm. Size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification. 16 2C x 2.5 Sq. mm unarmoured. 17 4C x 2.5 Sq. mm unarmoured. 18 6Cx2.5 Sq. mm unarmoured. 19 Stringing of single panther24 Mtr transfer bus of 33 KV including fitting of tension clamps, hoisting of insulators, cutting of conductor including shifting of material from store to work site and and all the other associated work required for completion of jobs satisfactorily as per drawing and technical specification. 20 Termination of following sizes cables as laid above as per cable schedule including making necessary holes in glands plates or box where ever required fixing of cable glands of approx. made size and ferruling and Nos for each core. (The rates of termination of control cable including the all cores of cable at one end with lug.) 21 2C x 2.5 Sq. mm unarmoured. 22 4C x 2.5 Sq. mm unarmoured. 23 6Cx2.5 Sq. mm unarmoured. 24 Preparation of Inter connection diagram and cable schedule as per drawing to complete the job including CB, CT,panel and Isolator etc. 25 Erection & installation of 0.2 class accuracy ABT meter (main & check-02 Nos) with cubical panel. 26 Intregation of 33 KV bay with existing SCADA system at 132 KV S/S Madhogarh 27 The Rates qouted by the bidders should be without Taxes. Taxes to be paid extra, if applicable.
Basic Detail
Tender No 10/ETD(O)/2025-26
Bidding Type Tender
Location
City madhogarh
State Uttar Pradesh
Key Dates
Publish Date 24 Jul 2025
Submission Date 20 Aug 2025
Open Date 20 Aug 2025
Finance
Tender Value Ref. Documents
Tender Fee 1180
EMD 10000
Exemption Not Available
Document List
ed50d7d7-0487-43c3-8e15-da5bc45475b0.html
BOQ_1929598.xls
documentten.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 24, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 20, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 20, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

ed50d7d7-0487-43c3-8e15-da5bc45475b0.html

xls

BOQ_1929598.xls

pdf

documentten.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders