| 1 | Part A DESIGN, ENGINEERING, SUPPLY, INSTALLATION AND COMMISSIONING OF 500 KW GROUND MOUNTED SOLAR POWER PROJECT AT JAGLA Rates for the Supply of material (Must be quoted FOR site, freight, insurance, including loading, unloading, storage, handling at site) |
| 2 | Supply of SPV Modules as specified in the Tender documents |
| 3 | Supply of Inverters as specified in the Tender documents |
| 4 | Supply of Inverter transformer as specified in the Tender documents |
| 5 | Supply of Panels & Switchgears as specified in the Tender documents |
| 6 | Supply of Module mounting structure as specified in the Tender documents |
| 7 | Spare Modules ( 0.50% of total supply of solar modules) |
| 8 | Mandatory spares excluding modules |
| 9 | Cables ( all DC, LT & HT) |
| 10 | Supply of Balance of Systems for the Solar Part for commissioning of the Plant as specified in tender documents |
| 11 | Part B Rates for installation of 500 kw Solar Power Project,and other allied activities for successful completion of the Solar Power Project |
| 12 | Design, Engineering, Supply, Installation & Commissioning and performance testing of the equipments supplied and other services specified in the tender document. |
| 13 | Civil and allied works for construction of Module mounting structure, foundations etc for all the equipment supplied |
| 14 | Freight, Insurance, Loading unloading, storage at site, handling at site for allied works |
| 15 | Part C RATES FOR OPERATION & MAINTENENACE FOR FIVE YEARS |
| 16 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for first year |
| 17 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Projectfor second year |
| 18 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for third year |
| 19 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for fourth year |
| 20 | Operation and Maintenance of the Solar PV Ground Mounted Solar Power Project for fifthyear |
| 21 | Operation and Maintenance of the Solar PV Project with BESS for sixthyear |
| 22 | Operation and Maintenance of the Solar PV Project with BESS for seventhyear |
| 23 | Operation and Maintenance of the Solar PV Project with BESS for eigthyear |