Rate Calls (Quotation Rates) For Proposed Art Works For Dadasaheb Phalke Smarak In Nashik=Grand Entrance Gateway - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 15 feet. Minimum Width – 8 feet. Minimum Length – 12 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings. Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level 1:2:4 (1 cement : 5coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size) Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability, the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 2 Rangmanch India Gate (Sculptures with 2d Background) - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 25 feet. Minimum Width – 18 feet. Minimum Length – 20 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings. Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level 1:2:4 (1 cement : 5coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 3 Rangmanch Kedarnath (Sculptures with 2d Background) - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 16 feet. Minimum Width – 16 feet. Minimum Length – 20 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings. excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 4 Rangmanch Amer Fort (Sculptures with 2d Background) - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 18 feet. Minimum Width – 16 feet. Minimum Length – 30 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings. Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 5 Rangmanch Bahubali (Sculptures with 2d Background) - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 16 feet. Minimum Width – 15 feet. Minimum Length – 20 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 6 Rangmanch Dilwale Dulhaniya Le Jayenge (Sculptures with 2d Background) - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 10 feet. Minimum Width – 5 feet. Minimum Length – 12 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 7 Rangmanch Sholey (Sculptures with 2d Background) - The structure to be made with a minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 8 feet. Minimum Width – 5 feet. Minimum Length – 6 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 8 Open Air Art Gallery Pods - minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 7 feet. Minimum Width – 6 feet. Minimum Length – 14 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 9 Kids Play Auto- minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 8 feet. Minimum Width – 6 feet. Minimum Length – 10 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 10 Kids Play Jadoo- minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 6 feet. Minimum Width – 8 feet. Minimum Length – 8 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 11 Kids Play Hathi Mere Sathi- minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 12 feet. Minimum Width – 8 feet. Minimum Length – 14 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 12 Kids Play Makadi- minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 12 feet. Minimum Width – 18 feet. Minimum Length – 18 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 13 Kids Play Stenly Ka dabba- minimum area as per below details, using the scrap/waste material available at the sites . Minimum Height – 12 feet. Minimum Width – 10 feet. Minimum Length – 10 feet. Segregation and identification of scrap - The Scrap Collected from different sites of municipal body and other government agencies bond to provide the scrap material is differentiated and segregated into categories and sizes further cleansing and defragmenting is done for fabrication. The segregated scrap is identified for assembling into the moulds and fabricated with welding joints as parts of the sculpture/ Monument. Foundation specifications - PCC in Ratio 1:4:8 (1cement : 4coarse sand : 8 stone agg. 25mm nominal size). Cement concrete base for miniature/sculpture/structure of ratio 1:3:6 (1cement : 3coarse sand : 6 stone agg. 20mm nominal size). Excavation and removal of surplus earth included. Brick work - common burnt clay modular bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6coarse sand). The RCC Sub- structure TMT Bars Specifications as per structure drawings, excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Providing and laying in position cement concrete of specified grade excluding the cost of centreing and shuttering - All work up to plinth level 1:2:4 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 25 mm nominal size). Earthing with G.I earth pipe 4.5 metre long, 40mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. The armature/ Structure Fabrication. For the better structural performance and durability the load is such divided into a structural truss or arrangement to equally distribute the load and keeps the sculpture/ Monument more Stable, sustainable and bears all effects such as winds and addition pressures and loads. Over The armature/ Structure Truss the different sections are assembled and fabricated together with the help of hydraulic machines and different available methods to create the final design of Sculpture/ Monument of achieved. For finishing while Finalizing of miniatures / sculptures Applying/Filling Epoxy of approved quality in the gaps , painting with P.U. Coating automotive paint of approved quality (two or more coats) with giving proper finishing as per direction of work-in-charge 14 GST