Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | I) Bareghoria BebejiaHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 2 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 3 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 4 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 5 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 6 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 7 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 8 | II) Botal Tiniali Khatkhati roadHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 9 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 10 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 11 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 12 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 13 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 14 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 15 | III) Garigaon Namghar approach RoadHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 16 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 17 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 18 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 19 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 20 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 21 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 22 | IV)Tengrajan to GargaonHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 23 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 24 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 25 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 26 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 27 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 28 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 29 | V) GB road (Mondol Tini ali) to Jaljori LP SchoolHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 30 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 31 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 32 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 33 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 34 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 35 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 36 | VI) Hajari to Borpabhajan & SarulongthaHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 37 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 38 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 39 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 40 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 41 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 42 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 43 | VII) Jaljori to Baromukhiya,Heavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 44 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 45 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 46 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 47 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 48 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 49 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 50 | VIII) Padam Bahadur to DapatharHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 51 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 52 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 53 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 54 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 55 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 56 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 57 | IX)at Ratanpur Koibarta GaonHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 58 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 59 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 60 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 61 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 62 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 63 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 64 | X)at Tengani Kocharihola,Heavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 65 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 66 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 67 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 68 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 69 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 70 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 71 | XI)Swahid Padam Bahadur Road to Pabhojan Borchapori connecting RoadHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 72 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 73 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 74 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 75 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 76 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 77 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 78 | XII) Rajat Bagan Tini ali to Gyanpith LP School via Naharbari Shiv Mandir Heavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 79 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 80 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 81 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 82 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 83 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 84 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 85 | XIII) Dapathatr to Telpung connecting roadHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 86 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 87 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 88 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 89 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 90 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 91 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 92 | XIV) Borchapori LP School to Church Road Heavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 93 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 94 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 95 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 96 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 97 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 98 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 99 | XV) Chintamoni Namghar to PWD Road, Heavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 100 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 101 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 102 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 103 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 104 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 105 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 106 | XVI) Rengma Ali to Sautali ME SchoolHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 107 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 108 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 109 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 110 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 111 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 112 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 113 | XVII) Changpol Tini ali to Debo Tini ali Connecting RoadHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 114 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 115 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 116 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 117 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 118 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 119 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
| 120 | XVIII) Someswar Chariali to Tengrajan Chilarai SchoolHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer. |
| 121 | Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 |
| 122 | Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 123 | Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material. |
| 124 | Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding |
| 125 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. |
| 126 | Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail