Road Transport and Highways Government Departments Closing in 0 days TDR #50323508

Improvement Of Earthen Road I) Da Chuk To Panjan Road, Ii)At Turung Gaon, Iii)Naojan Forest Village, Iv)Dvn To Tengaholla,V)At Naojan Adarsha Village, Vi)Neog Chuk To Pub Naojan Connecting Road, Vii) Gondhokoroi Jatiya Vidylaya To Pub Naojna Connecting Ro

Issued by Government Departments · sarupathar, Assam
Tender Value
94.12 Lakhs
Estimated cost
Bid Submission
11 Aug 2025
0 days left
EMD
1.88 Lakhs
Bank guarantee accepted
Document Fee
1900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sarupathar → Assam
EMD Exemption
Available
Quantity
Not Available

Project Description

Improvement of Earthen Road I) Da Chuk to Panjan road, II)At Turung Gaon, III)Naojan Forest Village, IV)DVN to Tengaholla,V)At Naojan Adarsha Village, VI)Neog Chuk to Pub Naojan connecting road, VII) Gondhokoroi Jatiya vidylaya to Pub Naojna connecting road, VIII) Link Road between Turung Gaon and Kushal Konwar Ali, IX) Nahoroni to DVN with Gravel Wearing Course (GWC) for the year 2025-26, Sarupathar LAC under SOPD-G

BOQ

Name of Work:Improvement of Earthen Road I) Da Chuk to Panjan road, II)At Turung Gaon, III)Naojan Forest Village, IV)DVN to Tengaholla,V)At Naojan Adarsha Village, VI)Neog Chuk to Pub Naojan connecting road, VII) Gondhokoroi Jatiya vidylaya to Pub Naojna connecting road, VIII) Link Road between Turung Gaon and Kushal Konwar Ali, IX) Nahoroni to DVN with Gravel Wearing Course (GWC) for the year 2025-26, Sarupathar LAC under SOPD-G
Sl. No. Item Description
1I) Da Chuk to Panjan roadHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
2Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
3Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
4Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
5Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
6Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
7Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
8II)At Turung GaonHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
9Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
10Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
11Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
12Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
13Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
14Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
15III)Naojan Forest VillageHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
16Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
17Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
18Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
19Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
20Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
21Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
22IV)DVN to TengahollaHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
23Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
24Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
25Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
26Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
27Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
28Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
29V)At Naojan Adarsha VillageHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
30Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
31Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
32Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
33Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
34Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
35Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
36Vi)Neog ChukHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
37Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
38Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
39Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
40Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
41Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
42Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
43Vii)Gondhokoroi Jatiya vidyalayaHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
44Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
45Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
46Earthwork in excavation for structures and technical as per drawing specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottorn and backfilling in trenches with excavated suitable material.
47Laying 1st class bedding on well compacted sand, moorum as per clause 1 5.30 115(ii) Granular bedding
48Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with 3/9.3 cement mortar 1:2 but excluding 2 excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
49Backfilling in Foundation Trenches as per drawing and technical specification 1 Clause 1108. (1) sand filling
50Viii)Link Road between Turunggaon Heavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
51Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
52Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
53ix)Nahoroni to DVN with GravelHeavy Dressing: Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
54Gravel/Soil-Aggregregate surface course (table 400.3)Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
55Maintenance of Earthen shoulder (filling with fresh selected soil)Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

AI Tender Summary

OUR REF NO 50323508
AUTHORITY Government Departments
TENDER VALUE 94.12 Lakhs
LAST DATE 11-08-2025
Authority
Authority Name Public Works Roads Department
Work Description Improvement of Earthen Road I) Da Chuk to Panjan road, II)At Turung Gaon, III)Naojan Forest Village, IV)DVN to Tengaholla,V)At Naojan Adarsha Village, VI)Neog Chuk to Pub Naojan connecting road, VII) Gondhokoroi Jatiya vidylaya to Pub Naojna connecting road, VIII) Link Road between Turung Gaon and Kushal Konwar Ali, IX) Nahoroni to DVN with Gravel Wearing Course (GWC) for the year 2025-26, Sarupathar LAC under SOPD-G
Basic Detail
Tender No CE/Commn/16/2025-26/04
Bidding Type Tender
Location
City sarupathar
State Assam
Key Dates
Publish Date 23 Jul 2025
Submission Date 11 Aug 2025
Open Date 11 Aug 2025
Finance
Tender Value 94.12 Lakhs
Tender Fee 1900
EMD 1.88 Lakhs
Exemption Available
Document List
35cb4703-66fa-4a71-90ac-8d3b02ec8918.html
BOQ_72789.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 23, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 11, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 11, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

35cb4703-66fa-4a71-90ac-8d3b02ec8918.html

xls

BOQ_72789.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender