| 1 | E/w excavation in foundation in kankar mix with mooram/ bajari & black cotton including lead up to 30.00 m and lift 1.50m and all labour material and t&P etc as per si no. 252 |
| 2 | Local sand filling for black cotton soil i/c supply of all matriral , leveling dressing remaning properly with watering etc all completer as per si no. 255 |
| 3 | Cement concrete with 40mm guage stone ballasdt, coarse sand and cement in proporation of 8:4:1 in foundation and under CC including supply of allmaterial labour and t&P etc required for proper completion of work as per si ni. 281 |
| 4 | RCR stone masonry work in cement morter infoundation complet as per drawing and technical speficication clause 702, 702 |
| 5 | RCC work for nala and slab in 1:1.5:3 cement c/sand and 20mm stone dalla grit i/c centering & shuttering excluding cutting, bending of mild steel as per si no. 284A |
| 6 | MS irom work for RCC work i/c cutting bending and moulding all completer as per si no. 504 |
| 7 | Supply & fixing of sign board i/c painting etc. i/c labour materila and t&P etc. |
| 8 | RCC Culvert puliya 1.00 mtr. |
| 9 | E/w excavation in foundation in kankar mix with mooram/ bajari & black cotton including lead up to 30.00 m and lift 1.50m and all labour material and t&P etc as per si no. 252 |
| 10 | Local sand filling for black cotton soil i/c supply of all matriral , leveling dressing remaning properly with watering etc all completer as per si no. 255 |
| 11 | Cement concrete with 40mm guage stone ballasdt, coarse sand and cement in proporation of 8:4:1 in foundation and under CC including supply of allmaterial labour and t&P etc required for proper completion of work as per si ni. 281 |
| 12 | R.C.R. Stone masonary work in 1:4 cement sand mortar up to plinth |
| 13 | R.C.R. Stone masonary work in 1:3 cement sand mortar up to plinth |
| 14 | R.C.C. work for slab in 1:1.5:3 cement/ c/ sand and 20mm stone dalla grit i/c centering & shuttering excluding cutting, bending of mild steel as per si no. 284a |
| 15 | MS irom work for RCC work i/c cutting bending and moulding all completer as per si no. 504 |
| 16 | Struck pointing work in 1:2 cement C/sand mortar. |
| 17 | Plane cement concrete with 2cm gauge approved dalla stone ballast approved coarse sand and cement to the proporation of 1:2:4 including all labour material and t&P complete etc. as per si no. 179a |
| 18 | Back filling behind abutment, wing wall and reataining wall/ soide wall all complet as per technical specification clause 1204.3.8 MORD 1200/12.10 |
| 19 | RCC Culvert puliya 1.20 mtr. |
| 20 | E/w excavation in foundation in kankar mix with mooram/ bajari & black cotton including lead up to 30.00 m and lift 1.50m and all labour material and t&P etc as per si no. 252 |
| 21 | Local sand filling for black cotton soil i/c supply of all matriral , leveling dressing remaning properly with watering etc all completer as per si no. 255 |
| 22 | Cement concrete with 40mm guage stone ballasdt, coarse sand and cement in proporation of 8:4:1 in foundation and under CC including supply of allmaterial labour and t&P etc required for proper completion of work as per si ni. 281 |
| 23 | R.C.R. Stone masonary work in 1:4 cement sand mortar up to plinth |
| 24 | R.C.R. Stone masonary work in 1:3 cement sand mortar up to plinth |
| 25 | R.C.C. work for slab in 1:1.5:3 cement/ c/ sand and 20mm stone dalla grit i/c centering & shuttering excluding cutting, bending of mild steel as per si no. 284a |
| 26 | MS irom work for RCC work i/c cutting bending and moulding all completer as per si no. 504 |
| 27 | Struck pointing work in 1:2 cement C/sand mortar. |
| 28 | Plane cement concrete with 2cm gauge approved dalla stone ballast approved coarse sand and cement to the proporation of 1:2:4 including all labour material and t&P complete etc. as per si no. 179a |
| 29 | Back filling behind abutment, wing wall and reataining wall/ soide wall all complet as per technical specification clause 1204.3.8 MORD 1200/12.10 |
| 30 | ( Rates in BOQ are exclusive of G.S.T. Amount ) |