1) Providing To W.S.Scheme At Kothale (Gaonthan, Manewadi) 2) Providing To W S.S Scheme At Kothale (Anu-Jati Neo-Buddhist Settlement) Tat-Mashiras
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Jul 2025
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
100
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
malshiras → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
1) Providing To w.S.Scheme At Kothale (Gaonthan, Manewadi) 2) Providing To w S.S Scheme At Kothale (Anu-Jati Neo-Buddhist Settlement) Tat-Mashiras
BOQ
| Sl. No. | Item Description |
| 1 | 1) Providing To w.S.Scheme At Kothale (Gaonthan, Manewadi) Tat-Mashiras. |
| 2 | Excavation for foundation/pipe uunches in earth, soils, of all types sand, gravel, and soft murum, including removing the excavated material up so a distance of 50 m and lifl as below stacking and spreading as directed normal dewatering, preparing the bed for foundation and Excluding hack filling etc.complete (MIP DSR 2023-24 hem No 1 Page No 171 |
| 3 | Excavation for foundation/pipe trenches in Hard Maram inchiding, removing the excavated material up to a distance of 50 m and lifts as below stacking and spreading as directed by Engineer-lu-Charge, normal dewatering preparing the bed for foundation and escluding back filling, etc complete (M.JP D.5.R. 2023 24 Item No.2 Page No 37) |
| 4 | Excavation for foundation /pipe trenches in sofl rock and old cement and Lime masonry foundation asphalt rond including removing the excavated material up to a lead of 50 m beyond the lift as below Stacking as directed by Engineer-In-Charge normal dewatering, preparing the bed for foundation and excluding back filling, etc. Complete (M.JP D.S.R. 2023-24 Item No.5Page No 37) |
| 5 | Excavation for foundation /pipe in hard rock by Controlled Blasting including trimming and Leveling the bed by Chiseling where necessary and removing the excavated material and Stacking it in measurable heaps within a distance of 50 m from the area and lift as below normal dewatering excluding backfilling, etc Complete(MJP D.S.R. 2023-24 Item No.6Page No 38) |
| 6 | Filling in Plinth and floor murum bedding in Trenches with approved murum for excavated material from foundation 15 cm to 20 cm Layer including watering ramming and compaction ete complete (MJP D.S.R. 2023-24tem No.16Page No 41) |
| 7 | 90 mm Dia 4 Kg/cm2 |
| 8 | 75 mm Dia 4 Kg/cm2 |
| 9 | 90 mm Dia 4 Kgam |
| 10 | 75 mm Dia 4 Kg/cm? |
| 11 | 80 mm Sluice Valve |
| 12 | 80 mm Sluice Valve |
| 13 | Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation surcharging etc.complete (MJP D.S.R. 2023-24 Item No.15Page No 40) |
| 14 | 100mmDia M-class |
| 15 | GST18% |
| 16 | Providing To w S.S Scheme At Kothale ( अनु- जाती नवबौद्ध वस्ती ) |
| 17 | Excavation for hondation pipe trenches in earth, soils, of all types and graved and soft murum, inchading removing the excavated material p dinance of 50 m and lift as below stacking and spreading as directed normal dewatering, preparing the bed fis foundation and Excluding hack filling ete complete (MIP DSR 2023-24 Nem No 1 Page No 17) |
| 18 | Excavation is foundation/pipe trenches in Hard Murum inchading removing the excavated material up to a dutance of 50 m and lifts as below stacking and spreading as directed by Engineer-In-Charge, normal dewatering preparing the bed for foundation and excluding back filling, etc complete (MJP D.S.R. 2023-24 Item No.2 Page No 37) |
| 19 | Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lin as below Stacking as directed by Engineer-In-Charge normal dewatering, preparing the bed for foundation and excluding back filling, etc Complete (MJP D.S.R. 2023-24 Item No.5 Page No 37) |
| 20 | Excavation for foundation /pipe in hard rock by Controlled Blasting including trimming and Leveling the bed by Chiseling where necessary and removing the excavated material and Stacking it in measurable heaps within a distance of 50 m from the area and lift as below normal dewatering, excluding backfilling etc. Complete(M.JP D.S.R. 2023-24 Item No.6l\"age No 38) |
| 21 | Filling in Plinth and floor murum bedding in Trenches with approved murum for excavated material from foundation 15 cm to 20 cm Layer including watering ramming and compaction ete complete(M.JP D.S.R. 2023-24tem No.16Page No 41) |
| 22 | 90 mm Dia 4 Kg/cm2. |
| 23 | 90 mm Dia.4 Kg/cm2. |
| 24 | 80 mm Sluice Valve |
| 25 | 80 mm Sluice Valve |
| 26 | Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation surcharging etc.complete (MJP D.S.R. 2023-24 Item No.15Page No 40) |
| 27 | Providing and constructing B.B Masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation BB Masonry in 1:5 proportion precast RCC frame and cover ete, complete as directed by Engineer -in-charge (A) As above of 60 x 45 cm internal size and depth up to 0.90 m with precast RCC slab cover (M.JP D.S.R. 2023-24 Item No.1/APage No 283) |
| 28 | 100MM Dia M-class |
| 29 | GST18% |
AI Tender Summary
Tender Timeline
Jul 22, 2025
11:30 IST
Tender Published
Tender notice published.
CompletedJul 28, 2025
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 29, 2025
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender