| 1 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe 50/63/75mm |
| 2 | 80/90mm |
| 3 | 100/110mm |
| 4 | 125/140mm |
| 5 | 150/160/180mm |
| 6 | 200/225mm |
| 7 | 250/280mm |
| 8 | 300/315mm |
| 9 | 350mm |
| 10 | Add on above item no. 1.1.1 for B.T. Road |
| 11 | Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 12 | Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 13 | Add on above no. 1.1.1 item if depth of pipeline is above3.0 mtr. |
| 14 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and thenrefilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)In all type Soil 80mm |
| 15 | 100mm |
| 16 | 125mm |
| 17 | 150mm |
| 18 | 200mm |
| 19 | 250mm |
| 20 | 300mm |
| 21 | 350mm |
| 22 | Add on above item no. 1.2.1 for B.T. Road |
| 23 | Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 24 | Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 25 | Add on above no. 1.2.1 item if depth of pipeline is above3.0 mtr. |
| 26 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil50/63/75mm |
| 27 | 80/90mm |
| 28 | 100/110mm |
| 29 | 125/140mm |
| 30 | 150/160/180mm |
| 31 | 200/225mm |
| 32 | 250/280mm |
| 33 | 300/315mm |
| 34 | 350mm |
| 35 | Add on above item no. 1.3.1 for B.T. Road |
| 36 | Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 37 | Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 38 | Add on above no. 1.3.1 item if depth of pipeline is above3.0 mtr. |
| 39 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil80 mm |
| 40 | 100 mm |
| 41 | 125 mm |
| 42 | 150 mm |
| 43 | 200 mm |
| 44 | 250 mm |
| 45 | 300 mm |
| 46 | 350 mm |
| 47 | Add on above item no. 1.4.1 for B.T. Road |
| 48 | Add on above item no. 1.4.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 49 | Add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 50 | Deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 51 | Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.In all type Soil 75 mm |
| 52 | 90/80 mm |
| 53 | 110/100 mm |
| 54 | 140/125 mm |
| 55 | 180/160/150 mm |
| 56 | 225/200 mm |
| 57 | 250 mm |
| 58 | 300 mm |
| 59 | Add on above item no. 1.5.1 for B.T. Road |
| 60 | Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 61 | Add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 62 | Add on above item no. 1.5.1 if depth of pipe line is above3.0 mtr. |
| 63 | Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.80 mm |
| 64 | 100 mm |
| 65 | 125 mm |
| 66 | 150 mm |
| 67 | 225/200 mm |
| 68 | 250 mm |
| 69 | 300 mm |
| 70 | Add on above item no. 1.6.1 for B.T. Road |
| 71 | Add on above item no. 1.6.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 72 | Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 73 | Add on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr |
| 74 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degreethen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour. |
| 75 | Add on above item no. 1.7 for B.T. Road |
| 76 | Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 77 | Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 78 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)In all type Soil 80 mm dia pipe to 100mm |
| 79 | 125 mm dia pipe to 150mm |
| 80 | 200 mm dia pipe to 250mm |
| 81 | 300 mm dia pipe to 350mm |
| 82 | Add on above item no. 1.8.1 for B.T. Road |
| 83 | Add on above item no. 1.8.1 for CC Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 84 | Add on above item no. 1.8.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 85 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil80 mm to 110 mm |
| 86 | 125 mm to 165 mm |
| 87 | 200 mm to 300 mm |
| 88 | Add on above item no. 1.9.1 for B.T. Road |
| 89 | Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 90 | Add on above item no.1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 91 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil 80 mm to 100 mm |
| 92 | 125 mm to 150 mm |
| 93 | 200 mm to 300 mm |
| 94 | Add on above item no.1.10.1 for B.T. Road |
| 95 | Add on above item no.1.10.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 96 | Add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 97 | Labour charges for removal of complaint of polluted water supply to the consumers Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours |
| 98 | Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size In all type Soil50 to 75 mm |
| 99 | 80-110 mm |
| 100 | 125 to 165 mm |
| 101 | 200 to 300 mm |
| 102 | 350 to 400 mm |
| 103 | Add on above item no.1.12.1 for B.T. Road |
| 104 | Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 105 | Add on above item no. 1.12.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 106 | Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof andthen refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size In all type Soil 80-100 mm |
| 107 | 125 to 150 mm |
| 108 | 200 to 300 mm |
| 109 | 350 to 450 mm |
| 110 | Add on above item 1.13.1 for B.T. Road |
| 111 | Add on above item no. 1.13.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 112 | Add on above item no.1.13.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 113 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
| 114 | Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |