Tender For Competitive E-Bidding For Normal Repairing Work For Bisalpur Kisan Sahkari Chini Mills Ltd., Bisalpur ( Pilibhit ) For The Season 2025-26 - Cleaning Of Grass Where As Required Complete Job 2 Excavation In Foundation In Ordinari Soil Inclludi
Tender Overview
Project Description
Tender For Competitive E-Bidding For Normal Repairing Work For Bisalpur Kisan Sahkari Chini Mills Ltd., Bisalpur ( Pilibhit ) For The Season 2025-26 - Cleaning of grass where as required complete job 2 Excavation in foundation in ordinari soil inclluding lift up to 1.5 and lead up to 30 m including cost of all materialslabour t&p etc required for propercompletionof work 3 Same as item no 2 above lead up to 100 mtr 4 Concrite with 4 cm guge brick ballgst find sand,cement 10: 5:1 in foundation, floors including cost of all materiales labours. T&P ETC requird for proper completion of work 5 RCC work 1:2:4 , cement approve coarse and 10- 20 grit in small work including cost of all materiales labours. T&P ETC requird for proper completion of work 6 Same as item no 5/5 RCC 1:2:4, Beam, slab , chajja etc. 7 Centering and shatring and removal in RCC work. 8 Brick work in 1: 6 cement and coarse and morter in foundation and plinth including cost of all materiales labours. T&P ETC required for proper completion of work 9 Same as item no 8/8 but brick work as super structure 9 inch thick wall. 10 MS or TOR steel work in ra-inforcement labour rate only.. 11 Same as item no 1.07 but brick work labour rate only, excluding cost of bricks. 12 RCC work 1:2:4 , cement approve coarse and 10 - 20 grit inflooringincluding cost of all materiales labours. T&P etc required for proper completion of work. 13 Dismeantling of brickwork in cemen mortor up to hight of 10 meter and disposal of malva up to 100 meter including cost of all materiales labours. T&P etc required for proper completion of work. 14 Same as item no 13 but dismentling of RCC and disposal up to 100 meter. 15 Dismeantling of heavy structure and disposal of malva up to 100m cost of all labours gas for cutting. including cost of all materiales labours. T&P etc required for proper completion of work. 16 Same as item no 15/15 but dismeantling of roof sheet up to 15 meter hight. 17 Labour rate for fixing of colourcoated sheets ,fiber sheets of ACC excluding cost of sheets. 18 white washing 2 coats old treeted surface of walls. 19 Colour washing 2 coats on old treeted surface 20 Painting and washing 2 coats including cost of all materiales labours. T&P etc required for proper completion of work. 21 Finishing of walls with two coats old snocemof approved qualites ISI . On old treated surface. 22 12 mm thick cement plaster 1:6 cement and coarse sand morter including cost of all materiales labours. T&P ETC requird for proper completion of work 23 Fabrication and ericttion work in heavy size & section with welding electrode, gas for cutting including cost of all materiales labours. T&P ETC required for proper completion of work. ( Excluding sheet) 24 Providing Briak is soling with SOB laid on edge joint sand fild and spreading 1 coat of blinding with neatearth. 25 Proveding of colour coted 6 mm thik tiles of approved make with 1:3 cement and coarse mortor dusting, cleaning of tiels including cost of all materiales labours. T&P ETC required for proper completion of work
BOQ
| Sl. No. | Item Description |
| 1 | Cleaning of grass where as required complete job |
| 2 | Excavation in foundation in ordinari soil inclluding lift up to 1.5 and lead up to 30 m including cost of all materialslabour t&p etc required for propercompletionof work |
| 3 | Same as item no 2 above lead up to 100 mtr |
| 4 | Concrite with 4 cm guge brick ballgst find sand,cement 10: 5:1 in foundation, floors including cost of all materiales labours. T&P ETC requird for proper completion of work |
| 5 | RCC work 1:2:4 , cement approve coarse and 10- 20 grit in small work including cost of all materiales labours. T&P ETC requird for proper completion of work |
| 6 | Same as item no 5/5 RCC 1:2:4, Beam, slab , chajja etc. |
| 7 | Centering and shatring and removal in RCC work. |
| 8 | Brick work in 1: 6 cement and coarse and morter in foundation and plinth including cost of all materiales labours. T&P ETC required for proper completion of work |
| 9 | Same as item no 8/8 but brick work as super structure 9 inch thick wall. |
| 10 | MS or TOR steel work in ra-inforcement labour rate only.. |
| 11 | Same as item no 1.07 but brick work labour rate only, excluding cost of bricks. |
| 12 | RCC work 1:2:4 , cement approve coarse and 10 - 20 grit inflooringincluding cost of all materiales labours. T&P etc required for proper completion of work. |
| 13 | Dismeantling of brickwork in cemen mortor up to hight of 10 meter and disposal of malva up to 100 meter including cost of all materiales labours. T&P etc required for proper completion of work. |
| 14 | Same as item no 13 but dismentling of RCC and disposal up to 100 meter. |
| 15 | Dismeantling of heavy structure and disposal of malva up to 100m cost of all labours gas for cutting. including cost of all materiales labours. T&P etc required for proper completion of work. |
| 16 | Same as item no 15/15 but dismeantling of roof sheet up to 15 meter hight. |
| 17 | Labour rate for fixing of colourcoated sheets ,fiber sheets of ACC excluding cost of sheets. |
| 18 | white washing 2 coats old treeted surface of walls. |
| 19 | Colour washing 2 coats on old treeted surface |
| 20 | Painting and washing 2 coats including cost of all materiales labours. T&P etc required for proper completion of work. |
| 21 | Finishing of walls with two coats old snocemof approved qualites ISI . On old treated surface. |
| 22 | 12 mm thick cement plaster 1:6 cement and coarse sand morter including cost of all materiales labours. T&P ETC requird for proper completion of work |
| 23 | Fabrication and ericttion work in heavy size & section with welding electrode, gas for cutting including cost of all materiales labours. T&P ETC required for proper completion of work. ( Excluding sheet) |
| 24 | Providing Briak is soling with SOB laid on edge joint sand fild and spreading 1 coat of blinding with neatearth. |
| 25 | Proveding of colour coted 6 mm thik tiles of approved make with 1:3 cement and coarse mortor dusting, cleaning of tiels including cost of all materiales labours. T&P ETC required for proper completion of work |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.